Microseismic/acoustic emission(MS/AE)source localization method is crucial for predicting and controlling of potentially dangerous sources of complex structures.However,the locating errors induced by both the irregula...Microseismic/acoustic emission(MS/AE)source localization method is crucial for predicting and controlling of potentially dangerous sources of complex structures.However,the locating errors induced by both the irregular structure and pre-measured velocity are poorly understood in existing methods.To meet the high-accuracy locating requirements in complex three-dimensional hole-containing structures,a velocity-free MS/AE source location method is developed in this paper.It avoids manual repetitive training by using equidistant grid points to search the path,which introduces A*search algorithm and uses grid points to accommodate complex structures with irregular holes.It also takes advantage of the velocity-free source location method.To verify the validity of the proposed method,lead-breaking tests were performed on a cubic concrete test specimen with a size of 10 cm10 cm10 cm.It was cut out into a cylindrical empty space with a size of/6cm10 cm.Based on the arrivals,the classical Geiger method and the proposed method are used to locate lead-breaking sources.Results show that the locating error of the proposed method is 1.20 cm,which is less than 2.02 cm of the Geiger method.Hence,the proposed method can effectively locate sources in the complex three-dimensional structure with holes and achieve higher precision requirements.展开更多
Force analysis using a compact tension model, as recommended by ASTM, was carried out on a crack stop hole. The stress before, and after, drilling the hole was compared in terms of stress concentration and stress grad...Force analysis using a compact tension model, as recommended by ASTM, was carried out on a crack stop hole. The stress before, and after, drilling the hole was compared in terms of stress concentration and stress gradient. The optimum drilling location and diameter were studied through analysis of different locations and diameters. By analyzing the effects of flank holes and an additional hole, drilling advice was proposed and fatigue testing of the cracks in a steel bridge deck with a crack stop hole was conducted. The results show that the stress at the crack tip with a crack stop hole decreased, and the major principal stress around the hole was distributed accordingly. The optimum position of the crack stop hole centre was where the centre of the crack stop hole was situated behind the crack and the hole edge coincided with the crack tip. Therefore, hole diameters larger than 8 mm, or those weakening the section by 10%, were suggested as the best diameters. In terms of multi-hole crack stopping, a flank hole was not recommended. The optimum horizontal position of flank holes was at a distance of 1/4 of a single hole diameter from, and in front of, the single hole. Besides, the experiment showed that crack stop hole could only prevent cracks from growing and had no influence on crack growth rate.展开更多
Residual stress measurement is of critical significance to in-service security and the reliability of engineering components, and has been an active area of scientific interest. This paper offers a review o[ several p...Residual stress measurement is of critical significance to in-service security and the reliability of engineering components, and has been an active area of scientific interest. This paper offers a review o[ several prominent mechanical release methods for residual stress measurement and recent developments, focusing on the hole-drilling method combined with advanced optical sensing. Some promising trends for mechanical release methods are also analyzed.展开更多
For many years, the “short excavation and short exploration” excavation mode has been mainly used in the underground tunnel excavation of coal mines, which is difficult to meet the needs of rapid tunnel excavation. ...For many years, the “short excavation and short exploration” excavation mode has been mainly used in the underground tunnel excavation of coal mines, which is difficult to meet the needs of rapid tunnel excavation. For this reason, CCTEG Xi’an Research Institute has innovatively proposed a new working mode of “long excavation and long exploration” using directional long drilling and borehole geophysical exploration. This method utilizes directional long boreholes that have already been constructed, and uses transient electromagnetic technology in the borehole to detect the radial range of 30 meters and the depth exceeding 1000 meters of the borehole, ultimately forming a three-dimensional imaging of the entire spatial geological anomaly body, providing reliable technical support for the safety and long-term excavation of the tunnel. This paper introduces the application which is a long-distance advanced detection of 1026 m. .展开更多
In order to meet the rapid needs of processing square hole in mechanical equipment, the paper expounds the square hole processing method: planetary wheel method, and analyze the principle of tooling structure and pro...In order to meet the rapid needs of processing square hole in mechanical equipment, the paper expounds the square hole processing method: planetary wheel method, and analyze the principle of tooling structure and process with computer graphics parameters design. The results that, as long as the appropriate parameters, using the above method not only can punch the square hole, can also be processed triangle, the five angle and hexagonal regular polygon holes. The square hole processing method can provide theoretical basis and engineering reliable reference for related engineering and technical personnel.展开更多
A new approach is proposed to solve the elastic-plastic fields near the major-axis line of an elliptical hole. The complex variable method is used to determine the elastic fields near the major-axis line of the ellipt...A new approach is proposed to solve the elastic-plastic fields near the major-axis line of an elliptical hole. The complex variable method is used to determine the elastic fields near the major-axis line of the elliptical hole. Then, by using the line field analysis method, the exact and new solutions of the stresses, strains in the plastic zone, the size of the plastic region and the unit normal vector of the elastic-plastic boundary near the major-axis line of the elliptical hole are obtained for an anti-plane elliptical hole in a perfectly elastic-plastic solid. The usual small scale yielding assumptions are not adopted in the analysis. The present method is simple, easy and efficient. The influences of applied mechanical loading on the size of plastic zone are discussed.展开更多
基金The authors wish to acknowledge financial support from the National Natural Science Foundation of China(51822407 and 51774327)Natural Science Foundation of Hunan Province in China(2018JJ1037)Innovation Driven project of Central South University(2020CX014).
文摘Microseismic/acoustic emission(MS/AE)source localization method is crucial for predicting and controlling of potentially dangerous sources of complex structures.However,the locating errors induced by both the irregular structure and pre-measured velocity are poorly understood in existing methods.To meet the high-accuracy locating requirements in complex three-dimensional hole-containing structures,a velocity-free MS/AE source location method is developed in this paper.It avoids manual repetitive training by using equidistant grid points to search the path,which introduces A*search algorithm and uses grid points to accommodate complex structures with irregular holes.It also takes advantage of the velocity-free source location method.To verify the validity of the proposed method,lead-breaking tests were performed on a cubic concrete test specimen with a size of 10 cm10 cm10 cm.It was cut out into a cylindrical empty space with a size of/6cm10 cm.Based on the arrivals,the classical Geiger method and the proposed method are used to locate lead-breaking sources.Results show that the locating error of the proposed method is 1.20 cm,which is less than 2.02 cm of the Geiger method.Hence,the proposed method can effectively locate sources in the complex three-dimensional structure with holes and achieve higher precision requirements.
基金Projects(51278166,51478163)supported by the National Natural Science Foundation of ChinaProject(2015B17414)supported by the Fundamental Research Funds for the Central Universities,China
文摘Force analysis using a compact tension model, as recommended by ASTM, was carried out on a crack stop hole. The stress before, and after, drilling the hole was compared in terms of stress concentration and stress gradient. The optimum drilling location and diameter were studied through analysis of different locations and diameters. By analyzing the effects of flank holes and an additional hole, drilling advice was proposed and fatigue testing of the cracks in a steel bridge deck with a crack stop hole was conducted. The results show that the stress at the crack tip with a crack stop hole decreased, and the major principal stress around the hole was distributed accordingly. The optimum position of the crack stop hole centre was where the centre of the crack stop hole was situated behind the crack and the hole edge coincided with the crack tip. Therefore, hole diameters larger than 8 mm, or those weakening the section by 10%, were suggested as the best diameters. In terms of multi-hole crack stopping, a flank hole was not recommended. The optimum horizontal position of flank holes was at a distance of 1/4 of a single hole diameter from, and in front of, the single hole. Besides, the experiment showed that crack stop hole could only prevent cracks from growing and had no influence on crack growth rate.
基金the financial support from the National Basic Research Program of China(Project‘973’)(Nos.2010CB631005 and 2011CB606105)the National Natural Science Foundation of China(Nos.91216301,11172151,11232008,11072033 and 11372037)+1 种基金Tsinghua University Initiative Scientific Research Program,Program for New Century Excellent Talents in University(grant No.NCET-12-0036)Natural Science Foundation of Beijing,China(grant No.3122027)
文摘Residual stress measurement is of critical significance to in-service security and the reliability of engineering components, and has been an active area of scientific interest. This paper offers a review o[ several prominent mechanical release methods for residual stress measurement and recent developments, focusing on the hole-drilling method combined with advanced optical sensing. Some promising trends for mechanical release methods are also analyzed.
文摘For many years, the “short excavation and short exploration” excavation mode has been mainly used in the underground tunnel excavation of coal mines, which is difficult to meet the needs of rapid tunnel excavation. For this reason, CCTEG Xi’an Research Institute has innovatively proposed a new working mode of “long excavation and long exploration” using directional long drilling and borehole geophysical exploration. This method utilizes directional long boreholes that have already been constructed, and uses transient electromagnetic technology in the borehole to detect the radial range of 30 meters and the depth exceeding 1000 meters of the borehole, ultimately forming a three-dimensional imaging of the entire spatial geological anomaly body, providing reliable technical support for the safety and long-term excavation of the tunnel. This paper introduces the application which is a long-distance advanced detection of 1026 m. .
文摘In order to meet the rapid needs of processing square hole in mechanical equipment, the paper expounds the square hole processing method: planetary wheel method, and analyze the principle of tooling structure and process with computer graphics parameters design. The results that, as long as the appropriate parameters, using the above method not only can punch the square hole, can also be processed triangle, the five angle and hexagonal regular polygon holes. The square hole processing method can provide theoretical basis and engineering reliable reference for related engineering and technical personnel.
基金supported by the National Natural Science Foundation of China (Grant Nos. 10932001 and 11072015)the Scientific Research Key Program of Beijing Municipal Commission of Education (Grant No. KZ201010005003)the PhD Innovative Foundation of Beihang University (Grant No. 300351)
文摘A new approach is proposed to solve the elastic-plastic fields near the major-axis line of an elliptical hole. The complex variable method is used to determine the elastic fields near the major-axis line of the elliptical hole. Then, by using the line field analysis method, the exact and new solutions of the stresses, strains in the plastic zone, the size of the plastic region and the unit normal vector of the elastic-plastic boundary near the major-axis line of the elliptical hole are obtained for an anti-plane elliptical hole in a perfectly elastic-plastic solid. The usual small scale yielding assumptions are not adopted in the analysis. The present method is simple, easy and efficient. The influences of applied mechanical loading on the size of plastic zone are discussed.