Using agent development tools to construct an agent-based system is a well applied approach. However, the development tools usually do not have the function to check the feasibility about the workflow of the agent sys...Using agent development tools to construct an agent-based system is a well applied approach. However, the development tools usually do not have the function to check the feasibility about the workflow of the agent system during it implementation stage. Therefore, to develop an evaluation approach to analyze the feasibility of a developing agent system such that the improper workflow of an agent system can be found in the early design stage is a necessary task to reduce the risk of implementation. In this research, a Petri Net (PN) based three-stage evaluation approach was developed. In the conceptual stage, the pitfall of the current agent system developing process was examined and an improvement analysis process was specified. Then, in the system design stage, an evaluation approach which extracted the process log file from a developing agent system into a PN model in terms of a process mining approach-or algorithm was proposed. This model was simulated in a PN simulation package. The agent system performance was evaluated in terms of analyzing the deadlock phenomena of the PN model. Finally, in the implementation stage, the proposed concept was implemented by using an agent developing tool JADE and a PN simulation tool CPN. An agent-based robotic assembly system was used to examine the possible deadlock of the agent system.展开更多
Yima Coal Corporation is considering to adopt highwall mining method withauger machine to recover coal from north surface pit that has reached final highwall position. Themajor geomechanical issues associated with aug...Yima Coal Corporation is considering to adopt highwall mining method withauger machine to recover coal from north surface pit that has reached final highwall position. Themajor geomechanical issues associated with auger mining are highwall and pillar stability. Based onthe field investigation and laboratory test results of mechanical parameters, numerical modeling iscarried out to assess the stability of highwall and pillar. Field measurements of highwalldeformation have been used to validate and ensure the confidence for the development of realisticmodels. The results of numerical modeling show that the mining method is feasible for mining theseam of 10 m thickness in north surface coal mine.展开更多
Jinchuan nickel mine is the largest nickel mine in China. Cut-and-fill mining method with high density cementing materials is used in the mine. The original mining design divided the mining operation into two steps. T...Jinchuan nickel mine is the largest nickel mine in China. Cut-and-fill mining method with high density cementing materials is used in the mine. The original mining design divided the mining operation into two steps. The first step stopped the mining rooms and the second step stopped the pillars. Because the two-step method made big trouble for finally mining pillars and strongly limited the mining speed and production, it was successfully changed to a continuous cut-and-fill method without pillars. However, the mining operation in the mine has been down to 800 m and the mining condition is getting worse and more complicated. Through systematical field investigations and 3-D FEM analysis, it is proved that the mining method without pillars is feasible for mining deeper orebodies in Jinchuan nickel mine.展开更多
基金supported by National Science Council, Taiwan, through project No. NSC-95-2221-E-011-015
文摘Using agent development tools to construct an agent-based system is a well applied approach. However, the development tools usually do not have the function to check the feasibility about the workflow of the agent system during it implementation stage. Therefore, to develop an evaluation approach to analyze the feasibility of a developing agent system such that the improper workflow of an agent system can be found in the early design stage is a necessary task to reduce the risk of implementation. In this research, a Petri Net (PN) based three-stage evaluation approach was developed. In the conceptual stage, the pitfall of the current agent system developing process was examined and an improvement analysis process was specified. Then, in the system design stage, an evaluation approach which extracted the process log file from a developing agent system into a PN model in terms of a process mining approach-or algorithm was proposed. This model was simulated in a PN simulation package. The agent system performance was evaluated in terms of analyzing the deadlock phenomena of the PN model. Finally, in the implementation stage, the proposed concept was implemented by using an agent developing tool JADE and a PN simulation tool CPN. An agent-based robotic assembly system was used to examine the possible deadlock of the agent system.
文摘Yima Coal Corporation is considering to adopt highwall mining method withauger machine to recover coal from north surface pit that has reached final highwall position. Themajor geomechanical issues associated with auger mining are highwall and pillar stability. Based onthe field investigation and laboratory test results of mechanical parameters, numerical modeling iscarried out to assess the stability of highwall and pillar. Field measurements of highwalldeformation have been used to validate and ensure the confidence for the development of realisticmodels. The results of numerical modeling show that the mining method is feasible for mining theseam of 10 m thickness in north surface coal mine.
文摘Jinchuan nickel mine is the largest nickel mine in China. Cut-and-fill mining method with high density cementing materials is used in the mine. The original mining design divided the mining operation into two steps. The first step stopped the mining rooms and the second step stopped the pillars. Because the two-step method made big trouble for finally mining pillars and strongly limited the mining speed and production, it was successfully changed to a continuous cut-and-fill method without pillars. However, the mining operation in the mine has been down to 800 m and the mining condition is getting worse and more complicated. Through systematical field investigations and 3-D FEM analysis, it is proved that the mining method without pillars is feasible for mining deeper orebodies in Jinchuan nickel mine.