Due to the pressure gain combustion characteristics,the rotating detonation combustor(RDC)can enhance thermodynamic cycle efficiency.Therefore,the performance of gas-turbine engine can be further improved with this co...Due to the pressure gain combustion characteristics,the rotating detonation combustor(RDC)can enhance thermodynamic cycle efficiency.Therefore,the performance of gas-turbine engine can be further improved with this combustion technology.In the present study,the RDC operation performance with a turbine guide vane(TGV)is experimentally investigated.Hydrogen and air are used as propellants while hydrogen and air mass flow rate are about 16.1 g/s and 500 g/s and the equivalence ratio is about 1.0.A pre-detonator is used to ignite the mixture.High-frequency dynamic pressure transducers and silicon pressure sensors are employed to measure pressure oscillations and static pressure in the combustion chamber.The experimental results show that the steady propagation of rotating detonation wave(RDW)is observed in the combustion chamber and the mean propagation velocity is above 1650 m/s,reaching over 84%of theoretical Chapman-Jouguet detonation velocity.Clockwise and counterclockwise propagation directions of RDW are obtained.For clockwise propagation direction,the static pressure is about 15%higher in the combustor compared with counterclockwise propagation direction,but the RDW dominant frequency is lower.When the oblique shock wave propagates across the TGV,the pressure oscillations reduces significantly.In addition,as the detonation products flow through the TGV,the static pressure drops up to 32%and 43%for clockwise and counterclockwise propagation process respectively.展开更多
Through a comprehensive review of the development status of workover technology of PetroChina Company Limited(PetroChina), this paper presents the connotation of workover operation under the background of the new era,...Through a comprehensive review of the development status of workover technology of PetroChina Company Limited(PetroChina), this paper presents the connotation of workover operation under the background of the new era, the latest progress of workover operation in the respects of equipment, tools, technology and the construction of information and standardization. The gaps between PetroChina and foreign counterpart in workover technology are as follows: the level of automation and intellectualization of tools and equipment is relatively low, the snubbing operation in gas wells characterized by HT/HP and high H2 S is lagged behind;water plugging in the long horizontal wellbore needs to be further developed, coiled tubing and its relevant equipment for ultra-deep well operation has to be optimized;informationization, standardization and big data application of workover operation need to be started. Based on this as well as the development status of workover technology in China and the technical difficulties faced in the future, eight suggestions for future development are put forward:(1) strengthen the dynamic understanding of reservoir and improve the pertinence of workover schemes;(2) develop the general overhaul technology in a systematical way to tackle issues of seriously problematic wells;(3) put more efforts into the research of horizontal well workover operation and develop relevant technology for long horizontal section operation;(4) improve the snubbing technology and extend its applications;(5) expand the capacity of coiled tubing operation and improve the level of special operations;(6) develop automatic workover technology into the field of artificial intelligence;(7) promote clean operation in an all-round way and build green oil and gas fields;(8) perfect the informationization construction to realize the sharing of workover resources.展开更多
基金the National Natural Science Foundation of China(No.11702143 and 11802137)the Fundamental Research Funds for the Central Universities(No.30918011343 and 30919011259).
文摘Due to the pressure gain combustion characteristics,the rotating detonation combustor(RDC)can enhance thermodynamic cycle efficiency.Therefore,the performance of gas-turbine engine can be further improved with this combustion technology.In the present study,the RDC operation performance with a turbine guide vane(TGV)is experimentally investigated.Hydrogen and air are used as propellants while hydrogen and air mass flow rate are about 16.1 g/s and 500 g/s and the equivalence ratio is about 1.0.A pre-detonator is used to ignite the mixture.High-frequency dynamic pressure transducers and silicon pressure sensors are employed to measure pressure oscillations and static pressure in the combustion chamber.The experimental results show that the steady propagation of rotating detonation wave(RDW)is observed in the combustion chamber and the mean propagation velocity is above 1650 m/s,reaching over 84%of theoretical Chapman-Jouguet detonation velocity.Clockwise and counterclockwise propagation directions of RDW are obtained.For clockwise propagation direction,the static pressure is about 15%higher in the combustor compared with counterclockwise propagation direction,but the RDW dominant frequency is lower.When the oblique shock wave propagates across the TGV,the pressure oscillations reduces significantly.In addition,as the detonation products flow through the TGV,the static pressure drops up to 32%and 43%for clockwise and counterclockwise propagation process respectively.
基金Supported by the National Science and Technology Major Project(2016ZX05010,2016ZX05023).
文摘Through a comprehensive review of the development status of workover technology of PetroChina Company Limited(PetroChina), this paper presents the connotation of workover operation under the background of the new era, the latest progress of workover operation in the respects of equipment, tools, technology and the construction of information and standardization. The gaps between PetroChina and foreign counterpart in workover technology are as follows: the level of automation and intellectualization of tools and equipment is relatively low, the snubbing operation in gas wells characterized by HT/HP and high H2 S is lagged behind;water plugging in the long horizontal wellbore needs to be further developed, coiled tubing and its relevant equipment for ultra-deep well operation has to be optimized;informationization, standardization and big data application of workover operation need to be started. Based on this as well as the development status of workover technology in China and the technical difficulties faced in the future, eight suggestions for future development are put forward:(1) strengthen the dynamic understanding of reservoir and improve the pertinence of workover schemes;(2) develop the general overhaul technology in a systematical way to tackle issues of seriously problematic wells;(3) put more efforts into the research of horizontal well workover operation and develop relevant technology for long horizontal section operation;(4) improve the snubbing technology and extend its applications;(5) expand the capacity of coiled tubing operation and improve the level of special operations;(6) develop automatic workover technology into the field of artificial intelligence;(7) promote clean operation in an all-round way and build green oil and gas fields;(8) perfect the informationization construction to realize the sharing of workover resources.