Soil treatment was utilized on numerous production sites to compact cohesion less formations, having the objective to increase earth characteristics and decrease probable subsidence. Within the last few years, Rapid I...Soil treatment was utilized on numerous production sites to compact cohesion less formations, having the objective to increase earth characteristics and decrease probable subsidence. Within the last few years, Rapid Impact Compaction (RIC) has increased its attractiveness as a soil treatment method.</span><span style="font-size:10pt;font-family:""> </span><span style="font-family:Verdana;">RIC is an innovative dynamic compaction technique primarily used to compact sandy soils where silt and clay contents are low. This work presents a case study of ground improvement using RIC and its suitability for site preparation earthworks. The RIC technique has been performed in an early site preparation which consists of a cut and fill contract for a mega project in the Kingdom of Saudi Arabia. RIC is a process where loose subsurface soils are improved through compaction with the utilization of successive impact blows from the top surface. This project involves the compaction of the fill materials (with an average thickness of 4 m) and loose natural formations (averaging 4 m in depth). The objective of the soil treatment scheme is to increase the relative density of the soils (both fill and natural) to 85%. The usage of the RIC within the site preparation earthwork applications is possible provided the presence of certain elements—specifically, granular materials and particles finer than number 200 sieve—do not exceed 15%. The RIC method proved to be cost- and time-effective when utilized for filling compaction activities since it compacts considerable soil thicknesses with a single action from the top surface, and can be used as an alternative to the traditional method of compacting fill formations in pre-determined lift thicknesses.展开更多
Cibaliung Underground Gold Mine applies cut and fill mining method to optimize ore production and maintain underground stability. Existing 5 m × 5 m height and width of stope geometry has a potential new design t...Cibaliung Underground Gold Mine applies cut and fill mining method to optimize ore production and maintain underground stability. Existing 5 m × 5 m height and width of stope geometry has a potential new design to increase production of gold due to variety of thick ore, however serious shotcrete failures often occur in hanging wall decline. This paper aims to find out the relationship between stope design and stability of hanging wall decline. The analysis conducted in this study is based on underground characteristics and geological condition of Cibaliung area. The impact of stope design on decline stability was analyzed by using numerical methods. The impact factors such as different rock mass, size of stope, and distance between stope and hanging wall decline were used in the analysis of underground stability especially stability on hanging wall decline.展开更多
文摘Soil treatment was utilized on numerous production sites to compact cohesion less formations, having the objective to increase earth characteristics and decrease probable subsidence. Within the last few years, Rapid Impact Compaction (RIC) has increased its attractiveness as a soil treatment method.</span><span style="font-size:10pt;font-family:""> </span><span style="font-family:Verdana;">RIC is an innovative dynamic compaction technique primarily used to compact sandy soils where silt and clay contents are low. This work presents a case study of ground improvement using RIC and its suitability for site preparation earthworks. The RIC technique has been performed in an early site preparation which consists of a cut and fill contract for a mega project in the Kingdom of Saudi Arabia. RIC is a process where loose subsurface soils are improved through compaction with the utilization of successive impact blows from the top surface. This project involves the compaction of the fill materials (with an average thickness of 4 m) and loose natural formations (averaging 4 m in depth). The objective of the soil treatment scheme is to increase the relative density of the soils (both fill and natural) to 85%. The usage of the RIC within the site preparation earthwork applications is possible provided the presence of certain elements—specifically, granular materials and particles finer than number 200 sieve—do not exceed 15%. The RIC method proved to be cost- and time-effective when utilized for filling compaction activities since it compacts considerable soil thicknesses with a single action from the top surface, and can be used as an alternative to the traditional method of compacting fill formations in pre-determined lift thicknesses.
文摘Cibaliung Underground Gold Mine applies cut and fill mining method to optimize ore production and maintain underground stability. Existing 5 m × 5 m height and width of stope geometry has a potential new design to increase production of gold due to variety of thick ore, however serious shotcrete failures often occur in hanging wall decline. This paper aims to find out the relationship between stope design and stability of hanging wall decline. The analysis conducted in this study is based on underground characteristics and geological condition of Cibaliung area. The impact of stope design on decline stability was analyzed by using numerical methods. The impact factors such as different rock mass, size of stope, and distance between stope and hanging wall decline were used in the analysis of underground stability especially stability on hanging wall decline.