期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Overall Planning of Tour Routes: A Case Study of Tour Route Planning in Panzhihua City
1
作者 HUAN Shaojun NI Yan 《Journal of Landscape Research》 2013年第10期29-31,共3页
Taking overall planning of tour routes as the guiding concept of regional tourism development,one core,three subjects,three sections and three levels in the overall planning of tour routes were explored. Range,plannin... Taking overall planning of tour routes as the guiding concept of regional tourism development,one core,three subjects,three sections and three levels in the overall planning of tour routes were explored. Range,planning principle,optimized layout of travel channels,construction of tourist towns,construction of scenic areas,construction of highway landscapes along travel channels,construction of tourist distribution centers in the overall planning of tourist routes for Panzhihua City,Sichuan Province were elaborated. Signifi cance of the overall planning of tour routes was summarized. 展开更多
关键词 Overall planning of TOUR routes Principle Eco-corridor channel layout TOWN construction SCENIC area construction Landscape construction
下载PDF
水电站地下厂房开挖及工期安排 被引量:1
2
作者 蔡光哲 于长征 +1 位作者 熊玲 钟灿文 《东北水利水电》 2016年第11期1-2,7,共3页
荒沟抽水蓄能电站工程地下厂房埋藏深、开挖量大、出渣强度高,施工通道的布置直接影响厂房开挖施工条件和施工工期。在施工通道布置过程中充分利用了永久洞室,做到了永临结合,尽量减少了施工支洞长度,加快了地下厂房的施工进度,方便了... 荒沟抽水蓄能电站工程地下厂房埋藏深、开挖量大、出渣强度高,施工通道的布置直接影响厂房开挖施工条件和施工工期。在施工通道布置过程中充分利用了永久洞室,做到了永临结合,尽量减少了施工支洞长度,加快了地下厂房的施工进度,方便了工程施工。 展开更多
关键词 地下厂房开挖 施工通道布置 工期安排 荒沟水电站
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部