Water hammer following the tripping of pumps can lead to overpressure and negative pressure. Reduction in overpressure and negative pressure may be necessary to avoid failure, to improve the efficiency of operation an...Water hammer following the tripping of pumps can lead to overpressure and negative pressure. Reduction in overpressure and negative pressure may be necessary to avoid failure, to improve the efficiency of operation and to avoid fatigue of system components. The field tests on the water hammer have been conducted on the pump rising pipeline system with an air chamber. The hydraulic transient was simulated using the method of characteristics. Minimizing the least squares problem representing the difference between the measured and predicted transient response in the system performs the calibration of the simulation program. Among the input variables used in the water hammer analysis, the polytropic exponent, the discharge coefficient and the wave speed were calibrated. The computer program developed in this study will be useful in designing the optimum parameters of an air chamber for the real pump pipeline system. The correct selection of air chamber size and the effect of the inner diameter of the orifice to minimize water hammer have been investigated by both field measurements and numerical modeling.展开更多
Large and super-large section chamber groups in coal mines are frequently affected by dynamic loads resulting from production activities such as roadway driving and blasting.The stability of the surrounding rock is po...Large and super-large section chamber groups in coal mines are frequently affected by dynamic loads resulting from production activities such as roadway driving and blasting.The stability of the surrounding rock is poor,and it is difficult to control.In this paper,a similar simulation test was used to study the deformation and evolution laws of the surrounding rock of a triangle-shaped chamber group under different dynamic loads.The results showed that under dynamic loading,the vertical stress of the surrounding rock of the chamber group increased in an oscillatory form.The maximum stress concentration coefficient reached 4.09.The damage degree of the roof was greater than that of the two sides.The deformation of the roof was approximately 1.2 times that of the two sides.For the chamber closer to the power source,the stress oscillation amplitude of the surrounding rock was larger,and the failure was more serious.The force of the anchorage structure showed a phased increasing characteristic;additionally,the force of the anchorage structure on the adjacent side of the chambers was greater than that on the other side.This study reveals the deformation and failure evolution laws of the surrounding rock of large section chamber groups under dynamic loading.展开更多
文摘Water hammer following the tripping of pumps can lead to overpressure and negative pressure. Reduction in overpressure and negative pressure may be necessary to avoid failure, to improve the efficiency of operation and to avoid fatigue of system components. The field tests on the water hammer have been conducted on the pump rising pipeline system with an air chamber. The hydraulic transient was simulated using the method of characteristics. Minimizing the least squares problem representing the difference between the measured and predicted transient response in the system performs the calibration of the simulation program. Among the input variables used in the water hammer analysis, the polytropic exponent, the discharge coefficient and the wave speed were calibrated. The computer program developed in this study will be useful in designing the optimum parameters of an air chamber for the real pump pipeline system. The correct selection of air chamber size and the effect of the inner diameter of the orifice to minimize water hammer have been investigated by both field measurements and numerical modeling.
基金financial support from the National Key R&D Program of China(No.2018YFC0604703)National Natural Science Foundation of China(Nos.51804181,51874190,and 52074168)Key R&D Program of Shandong Province(No.2019GSF111020)。
文摘Large and super-large section chamber groups in coal mines are frequently affected by dynamic loads resulting from production activities such as roadway driving and blasting.The stability of the surrounding rock is poor,and it is difficult to control.In this paper,a similar simulation test was used to study the deformation and evolution laws of the surrounding rock of a triangle-shaped chamber group under different dynamic loads.The results showed that under dynamic loading,the vertical stress of the surrounding rock of the chamber group increased in an oscillatory form.The maximum stress concentration coefficient reached 4.09.The damage degree of the roof was greater than that of the two sides.The deformation of the roof was approximately 1.2 times that of the two sides.For the chamber closer to the power source,the stress oscillation amplitude of the surrounding rock was larger,and the failure was more serious.The force of the anchorage structure showed a phased increasing characteristic;additionally,the force of the anchorage structure on the adjacent side of the chambers was greater than that on the other side.This study reveals the deformation and failure evolution laws of the surrounding rock of large section chamber groups under dynamic loading.