新建特高压线路进行工频参数测量时,邻近的平行线路在测试线路上产生的感应电压、电流则有可能对参数测试的准确性产生较大的影响,还可能对试验人员、设备的安全造成一定威胁,因此有必要对平行线路在特高压线路上的感应电压、感应电流...新建特高压线路进行工频参数测量时,邻近的平行线路在测试线路上产生的感应电压、电流则有可能对参数测试的准确性产生较大的影响,还可能对试验人员、设备的安全造成一定威胁,因此有必要对平行线路在特高压线路上的感应电压、感应电流的计算方法及各种线路参数对计算结果的影响进行研究。以锡盟—山东特高压线路中的锡盟—北京东段实际线路为模型,通过EMTP-ATP软件计算平行500 k V线路在特高压线路上所产生的感应电压、感应电流,并针对各种参数对感应电压、感应电流计算的影响进行了分析。计算结果表明,平行段线路长度、平行段线路间距、换位方式、输送功率、线路高抗、串补电容均会对感应电压、感应电流产生影响。展开更多
The amplitude of switching overvoltages is a key factor for designing the insulation of UHV equipment. The effect of different arresters needs to be studied, since installing arresters is an important way to suppress ...The amplitude of switching overvoltages is a key factor for designing the insulation of UHV equipment. The effect of different arresters needs to be studied, since installing arresters is an important way to suppress switching overvoltages in UHV transmission lines. Switching overvoltages on the 1000 kV Huainan-Huxi double-circuit transmission line were simulated for different operating modes and different arrester designs using the electromagnetic transient program PSCAD/EMTDC. With parallel resistors, the switching overvoltages are less than 1.70 p.u. (1.0 p.u.=1100×√ 2 /√3 kV). If the arrestors are better, the switching overvoltages can be reduced even lower to 1.55 p.u. Without parallel resistors, the arresters can reduce three-phase energizing overvoltages to 1.70 p.u, while the single-phase reclosing overvoltages still exceed the limit. The results show that the parallel resistors cannot be eliminated if the arresters are only installed at each end of the transmission line. Also, better quality arresters significantly lower the switching overvoltages.展开更多
Analyzing the impact of radio interference(RI)variation during foul weather conditions is an area that has received limited study.This paper provides a statistical analysis of RI measurements obtained from a long-term...Analyzing the impact of radio interference(RI)variation during foul weather conditions is an area that has received limited study.This paper provides a statistical analysis of RI measurements obtained from a long-term observation station close to the world’s first commercially operating 1000 kV UHV AC double-circuit transmission line in China.During six months of observations,the impact of RI was studied on the line during fog,drizzle,and light snow and rain.It was found that RI increases linearly with the natural logarithm of the precipitation intensity.The Levenberg-Marquardt algorithm(LMA)is employed to fit the RI value with the precipitation intensity.The reasonable distribution of RI in different foul weather is verified by one-sample K-S test.This test is seen as beneficial for further RI prediction based on statistical weather mode.展开更多
文摘新建特高压线路进行工频参数测量时,邻近的平行线路在测试线路上产生的感应电压、电流则有可能对参数测试的准确性产生较大的影响,还可能对试验人员、设备的安全造成一定威胁,因此有必要对平行线路在特高压线路上的感应电压、感应电流的计算方法及各种线路参数对计算结果的影响进行研究。以锡盟—山东特高压线路中的锡盟—北京东段实际线路为模型,通过EMTP-ATP软件计算平行500 k V线路在特高压线路上所产生的感应电压、感应电流,并针对各种参数对感应电压、感应电流计算的影响进行了分析。计算结果表明,平行段线路长度、平行段线路间距、换位方式、输送功率、线路高抗、串补电容均会对感应电压、感应电流产生影响。
基金Supported by the National Natural Science Foundation of China(No. 50737001)
文摘The amplitude of switching overvoltages is a key factor for designing the insulation of UHV equipment. The effect of different arresters needs to be studied, since installing arresters is an important way to suppress switching overvoltages in UHV transmission lines. Switching overvoltages on the 1000 kV Huainan-Huxi double-circuit transmission line were simulated for different operating modes and different arrester designs using the electromagnetic transient program PSCAD/EMTDC. With parallel resistors, the switching overvoltages are less than 1.70 p.u. (1.0 p.u.=1100×√ 2 /√3 kV). If the arrestors are better, the switching overvoltages can be reduced even lower to 1.55 p.u. Without parallel resistors, the arresters can reduce three-phase energizing overvoltages to 1.70 p.u, while the single-phase reclosing overvoltages still exceed the limit. The results show that the parallel resistors cannot be eliminated if the arresters are only installed at each end of the transmission line. Also, better quality arresters significantly lower the switching overvoltages.
基金supported in part by the National Basic Research Program(973 Program)under Grant 2011CB209402-3the Science and Technology Project of the State Grid Corporation of China under Grant GY71-15-033.
文摘Analyzing the impact of radio interference(RI)variation during foul weather conditions is an area that has received limited study.This paper provides a statistical analysis of RI measurements obtained from a long-term observation station close to the world’s first commercially operating 1000 kV UHV AC double-circuit transmission line in China.During six months of observations,the impact of RI was studied on the line during fog,drizzle,and light snow and rain.It was found that RI increases linearly with the natural logarithm of the precipitation intensity.The Levenberg-Marquardt algorithm(LMA)is employed to fit the RI value with the precipitation intensity.The reasonable distribution of RI in different foul weather is verified by one-sample K-S test.This test is seen as beneficial for further RI prediction based on statistical weather mode.