This paper describes the physical model testing of a wave energy converter (WEC) undertaken in the Heriot-Watt wave basin during October 2010 as part of the SUPERGEN2 project funded by the British government,and provi...This paper describes the physical model testing of a wave energy converter (WEC) undertaken in the Heriot-Watt wave basin during October 2010 as part of the SUPERGEN2 project funded by the British government,and provides a preliminary analysis of the extreme mooring loads.Tests were completed at 1/20 scale on a single oscillating water column device deployed with a 3-line taut mooring configuration.The model was fully instrumented with mooring line load cells and an optical motion tracker.The tests were preceded by calibration of instrumentation and the wave test environment,and carried out in long crested waves regimes with 12 combinations of peak period T p and significant wave height H s.The main objective for these experiments was to examine the effect of shape and size of the tethered buoy on the leading mooring line on the maximum mooring loads and the excursion of the device.Comparison of the loads at different configurations of the tethered buoy suggests that the results are consistent with the hypothesis that the mooring forces should depend on the change in stiffness of the mooring system.In particular,the results indicate that with the spectral peak period close to the natural period of the moored device of 8 s,peak loads in a configuration with a smaller buoy may be considerably higher than those with a larger buoy.However,when T p was dissimilar,a harder mooring with a smaller spherical buoy appears to result in lower peak loads.The exact configuration should,therefore,be chosen according to the prevalent conditions of any particular location,and will also depend on the design and expected maintenance schedule,as well as matters related to the risk to navigation,environmental effects and the conservation status of the area.展开更多
Floating facilities have been studied based on the static analysis of mooring cables over the past decades. To analyze the floating system of a spherical buoy moored by a cable with a higher accuracy than before, the ...Floating facilities have been studied based on the static analysis of mooring cables over the past decades. To analyze the floating system of a spherical buoy moored by a cable with a higher accuracy than before, the dynamics of the cables are considered in the construction of the numerical modeling. The cable modeling is established based on a new element frame through which the hydrodynamic loads are expressed efficiently. The accuracy of the cable modeling is verified with an experiment that is conducted by a catenary chain moving in a water tank. In addition, the modeling of a spherical buoy is established with respect to a spherical coordinate in three dimensions, which can suffers the gravity, the variable buoyancy and Froude-Krylov loads. Finally, the numerical modeling for the system of a spherical buoy moored by a cable is established, and a virtual simulation is proceeded with the X- and Y-directional linear waves and the X-directional current. The comparison with the commercial simulation code Proteus DS indicates that the system is accurately analyzed by the numerical modeling. The tensions within the cable, the motions of the system, and the relationship between the motions and waves are illustrated according to the defined sea state. The dynamics of the cables should be considered in analyzing the floating system of a spherical buoy moored by a cable.展开更多
基金Funded by the UK Engineering and Physical Sciences Research Council under the grant EP/E040136/1
文摘This paper describes the physical model testing of a wave energy converter (WEC) undertaken in the Heriot-Watt wave basin during October 2010 as part of the SUPERGEN2 project funded by the British government,and provides a preliminary analysis of the extreme mooring loads.Tests were completed at 1/20 scale on a single oscillating water column device deployed with a 3-line taut mooring configuration.The model was fully instrumented with mooring line load cells and an optical motion tracker.The tests were preceded by calibration of instrumentation and the wave test environment,and carried out in long crested waves regimes with 12 combinations of peak period T p and significant wave height H s.The main objective for these experiments was to examine the effect of shape and size of the tethered buoy on the leading mooring line on the maximum mooring loads and the excursion of the device.Comparison of the loads at different configurations of the tethered buoy suggests that the results are consistent with the hypothesis that the mooring forces should depend on the change in stiffness of the mooring system.In particular,the results indicate that with the spectral peak period close to the natural period of the moored device of 8 s,peak loads in a configuration with a smaller buoy may be considerably higher than those with a larger buoy.However,when T p was dissimilar,a harder mooring with a smaller spherical buoy appears to result in lower peak loads.The exact configuration should,therefore,be chosen according to the prevalent conditions of any particular location,and will also depend on the design and expected maintenance schedule,as well as matters related to the risk to navigation,environmental effects and the conservation status of the area.
基金Supported by Human Resources Development Program of Korea Institute of Energy Technology Evaluation and Planning(KETEP),Ministry of Trade,Industry and Energy of Korea(Grant No.20134030200290)
文摘Floating facilities have been studied based on the static analysis of mooring cables over the past decades. To analyze the floating system of a spherical buoy moored by a cable with a higher accuracy than before, the dynamics of the cables are considered in the construction of the numerical modeling. The cable modeling is established based on a new element frame through which the hydrodynamic loads are expressed efficiently. The accuracy of the cable modeling is verified with an experiment that is conducted by a catenary chain moving in a water tank. In addition, the modeling of a spherical buoy is established with respect to a spherical coordinate in three dimensions, which can suffers the gravity, the variable buoyancy and Froude-Krylov loads. Finally, the numerical modeling for the system of a spherical buoy moored by a cable is established, and a virtual simulation is proceeded with the X- and Y-directional linear waves and the X-directional current. The comparison with the commercial simulation code Proteus DS indicates that the system is accurately analyzed by the numerical modeling. The tensions within the cable, the motions of the system, and the relationship between the motions and waves are illustrated according to the defined sea state. The dynamics of the cables should be considered in analyzing the floating system of a spherical buoy moored by a cable.