文章针对通信电源系统易受多种因素影响的特点,开发了一种基于高级精简指令集计算机机器(Advanced Reduced Instruction Set Computer Machines,ARM)核心控制芯片和通用分组无线业务(General Packet Radio Service,GPRS)数据传输单元(Da...文章针对通信电源系统易受多种因素影响的特点,开发了一种基于高级精简指令集计算机机器(Advanced Reduced Instruction Set Computer Machines,ARM)核心控制芯片和通用分组无线业务(General Packet Radio Service,GPRS)数据传输单元(Data Transfer Unit,DTU)模块的实时监测系统。系统通过现场控制终端采集通信电源设备的运行状态信息,经模拟数字(Analog to Digital,AD)转换模块处理后,由ARM核心控制芯片发送至无线模块,最终传输至远程监控中心。此外,设计一套应急预案,包括应急预案设计原则、组织机构与职责、应急分级、启动条件与工作流程以及保障措施等,以应对电网大停电带来的经济损失。通过技术保障、装备保障、人员保障,实现抢修工作的快速响应,缩短断电时间,有效减少经济损失,确保生产生活不受影响。展开更多
Given the different energy rates of multiple types of power generation units,different operation plans affect the economy of microgrids.Limited by load and power generation forecasting technologies,the economic superi...Given the different energy rates of multiple types of power generation units,different operation plans affect the economy of microgrids.Limited by load and power generation forecasting technologies,the economic superiority of day-ahead plans is unable to be fully utilized because of the fluctuation of loads and power sources.In this regard,a two-stage correction strategy-based real-time dispatch method for the economic operation of microgrids is proposed.Based on the optimal day-ahead economic operation plan,unbalanced power is validly allocated in two stages in terms of power increment and current power,which maintains the economy of the day-ahead plan.Further,for operating point offset during real-time correction,a rolling dispatch method is introduced to dynamically update the system operation plan.Finally,the results verify the effectiveness of the proposed method.展开更多
文摘文章针对通信电源系统易受多种因素影响的特点,开发了一种基于高级精简指令集计算机机器(Advanced Reduced Instruction Set Computer Machines,ARM)核心控制芯片和通用分组无线业务(General Packet Radio Service,GPRS)数据传输单元(Data Transfer Unit,DTU)模块的实时监测系统。系统通过现场控制终端采集通信电源设备的运行状态信息,经模拟数字(Analog to Digital,AD)转换模块处理后,由ARM核心控制芯片发送至无线模块,最终传输至远程监控中心。此外,设计一套应急预案,包括应急预案设计原则、组织机构与职责、应急分级、启动条件与工作流程以及保障措施等,以应对电网大停电带来的经济损失。通过技术保障、装备保障、人员保障,实现抢修工作的快速响应,缩短断电时间,有效减少经济损失,确保生产生活不受影响。
文摘Given the different energy rates of multiple types of power generation units,different operation plans affect the economy of microgrids.Limited by load and power generation forecasting technologies,the economic superiority of day-ahead plans is unable to be fully utilized because of the fluctuation of loads and power sources.In this regard,a two-stage correction strategy-based real-time dispatch method for the economic operation of microgrids is proposed.Based on the optimal day-ahead economic operation plan,unbalanced power is validly allocated in two stages in terms of power increment and current power,which maintains the economy of the day-ahead plan.Further,for operating point offset during real-time correction,a rolling dispatch method is introduced to dynamically update the system operation plan.Finally,the results verify the effectiveness of the proposed method.