既有住宅改造前评价系统(Pre-refurbishment Assessment System for Existing Residence,PASER)的开发目的是对既有住宅的改造必要性进行评价,为最终的改造决策提供参考。该评价系统包括5个一级指标,19个二级指标和90个评分点,并采用ASP...既有住宅改造前评价系统(Pre-refurbishment Assessment System for Existing Residence,PASER)的开发目的是对既有住宅的改造必要性进行评价,为最终的改造决策提供参考。该评价系统包括5个一级指标,19个二级指标和90个评分点,并采用ASP(Active Server Pages)技术开发出动态网页形式的评价工具,实现了在互联网上的及时评价和数据采集。展开更多
After some tragic fire events,Directive 2004/54/EC was issued to ensure a minimum safety level for tunnels belonging to the Trans-European Road Network longer than 500 m.Nowadays,most of the Italian road tunnels are s...After some tragic fire events,Directive 2004/54/EC was issued to ensure a minimum safety level for tunnels belonging to the Trans-European Road Network longer than 500 m.Nowadays,most of the Italian road tunnels are still not in compliance with the minimum safety requirements,thus refurbishment works are often planned.By developing a traffic macro-simulation model,this paper aims at assessing the resilience of an existing twin-tube motorway tunnel when one of its tubes is partially or completely closed due to planned activities.Several scenarios were investigated,also considering the availability or not of an alternative itinerary in the surrounding transportation network.The average vehicles’speed was used as a functionality parameter,while the resilience metrics were the resilience loss,the recovery speed,and the resilience index.The findings showed higher resilience losses for complete closure rather than partial closure of the tube under planned refurbishment works.The implementation of digital technologies,such as variable message signs,might reduce the resilience loss of the tunnel system.This research might represent a reference for tunnel management agencies in the choice of the most appropriate traffic control strategy to improve tunnel resilience in the event of planned activities.展开更多
Disadvantaged housing areas from the postwar period typically consist of relatively monotonous and monofunctional multi-storey blocks and have a separate traffic system rendering the areas isolated enclaves in the urb...Disadvantaged housing areas from the postwar period typically consist of relatively monotonous and monofunctional multi-storey blocks and have a separate traffic system rendering the areas isolated enclaves in the urban fabric.It is argued that this spatial isolation contributes to social isolation,and current refurbishments are therefore aimed at linking the housing areas with the surrounding neighbourhoods to enable social exchange between the residents and people from the surrounding areas.Based on a case study in a Danish social housing area,this paper discusses to what extent architectural development and urban strategic transformations can contribute to enabling social exchange in disadvantaged housing areas.Do neighbours enter the disadvantaged housing area as intended?If so,how does this influence their perception of the housing area?The analysis shows that architectural development and urban transformations are interdependent in establishing a social mix in disadvantaged housing areas.It is argued that refurbishments can reduce the stigma surrounding the housing area and its residents.However,the applicability of such strategies is highly dependent on the local context of the housing area.展开更多
Refurbishment of thermal barrier coating(TBC)has become a valuable technique to prolong the service life of high-temperature components.This study investigates the effect of the refurbishment process(coating removal a...Refurbishment of thermal barrier coating(TBC)has become a valuable technique to prolong the service life of high-temperature components.This study investigates the effect of the refurbishment process(coating removal and recoating)on the microstructure evolution and physical properties of TBC,including oxidation characteristics,element diffusion behavior,and crack failure mechanisms.The results showed that a certain amount of interdiffusion zone(IDZ)with Cr-rich would be retained in DD6 superalloy substrate after coating removal.The microstructure of the refurbished specimens showed equiaxedβ-NiAl phases,while the ordinary specimens have elongated grain shapes with a high aspect ratio.Moreover,mixed oxides in the refurbished TBC specimens were earlier observed during cyclic oxidation,with a greater thickness compared to ordinary TBC,due to the influence of BC layer phase sizes.The growth mechanism of thermally grown oxide(TGO-Al_(2)O_(3)layer)in the refurbished TBC specimens was also different,resulting from the different mechanisms of mixed oxides growth.Furthermore,under cyclic oxidation with water quenching at 1100℃,the cracks in the refurbished specimen tend to occur in the mixed oxides layer,while the cracks in the ordinary specimen occur in the top coat(TC)layer,attributing to the earlier and thicker mixed oxides layer formed in refurbished specimens.展开更多
The operational phase of a building project has increasingly gained importance with their energy performance becoming valuable and determining their operational excellence. In most heritage building projects (HBPs),...The operational phase of a building project has increasingly gained importance with their energy performance becoming valuable and determining their operational excellence. In most heritage building projects (HBPs), the operational energy use aspects are less considered, and a systematic way of analyzing their energy performance following project delivery is often lacking, The aim of this study is to evaluate the operational performance of refurbishment and reuse of UK listed church projects. The objective is to assess the operational energy use with a view to optimizing their sustafnabie performance. The methodology includes eight selected case study buildings refurbished and converted for multipurpose use. The case study approach provided qualitative insights into how the study contributes to a more structured requirements for energy management in HBPs with specific attention to energy-efficient building operations. The findings show the need to focus on fundamental areas of operational management (i.e. by developing and implementing more focused policy on operational energy performance of heritage buildings) to minimize the energy required to operate them. The challenges of implementing changes in operational energy performance improvement of heritage buildings are addressed in the form of recommendations that could Lead to real results. The study concludes that leveraging these areas requires commitment from all heritage building stakeholders because they all have substantial roles in harmonizing the requirement for the project's sustainability and not just the building operators. Meanwhile, baseline project planning, periodic updating, monitoring, and managing the energy use pattern are suggested as measures that could greatly facilitate better energy performance to optimizing their sustainable reuse compared with the traditional approach of trying to improve their thermal performance.展开更多
In this study, a simulation was conducted targeting Beomeo stream of Daegu, for the purpose of the quantitative determination of the changes in thermal environment of surrounding residential areas according to the urb...In this study, a simulation was conducted targeting Beomeo stream of Daegu, for the purpose of the quantitative determination of the changes in thermal environment of surrounding residential areas according to the urban river refurbishment. For the study method, the reviews of literature and model verification were conducted, and then the results were derived through the process of comparing and analyzing the thermal environment resulting from the river refurbishment of the target area. As a result of the model verification, the accuracy of modeling was 95%. As a result of a simulation of the target area, in respect of the fluctuation of temperature, the temperature decreased by 1.33°C more in the daytime than in the night time, due to the river refurbishment. In respect of the positions, the decrease of the temperature was 1.33°C at 2 pm at position 1, the position of river refurbishment, and the highest in the entire time slots. Also, the changes in temperature increasingly decreased from position 1 to position 4. It seemed that it was because there was the highest radiant heat at position 1 with the biggest gap between artificial mulching and natural mulching, and the effect of the gap in the radiant heat influenced successively over position 2, 3 and 4. Lastly, in respect of the effect of river refurbishment on the surrounding area, the effect reached to position 3, in other word, 60 meters from the river.展开更多
This paper, computer energy modeling is used to estimate the potential energy savings of refurbishing existing public federal housing in the United Arab Emirates. Such houses are built by the UAE Ministry of Public Wo...This paper, computer energy modeling is used to estimate the potential energy savings of refurbishing existing public federal housing in the United Arab Emirates. Such houses are built by the UAE Ministry of Public Works (MoPW) in five of the seven emirates that make up the UAE federation. The energy modeling was performed using the Integrated Environmental Solutions-Virtual Environment (IES-VE) commercial software. The study covered representative MoPW houses built in the period of 1974-2012. The results indicate potential energy savings upto 30.8% for the case of model 717 when refurbished to 2 Pearls standards compared to the as built configuration. The results showed little benefit in going from 1 Pearl to 2 Pearls refurbishment level. Thus 1 Pearl seems to be the most practical. This shows the high potential for energy, and thus environmental, savings should refurbishment be carried out on the homes built by the MoPW.展开更多
文摘既有住宅改造前评价系统(Pre-refurbishment Assessment System for Existing Residence,PASER)的开发目的是对既有住宅的改造必要性进行评价,为最终的改造决策提供参考。该评价系统包括5个一级指标,19个二级指标和90个评分点,并采用ASP(Active Server Pages)技术开发出动态网页形式的评价工具,实现了在互联网上的及时评价和数据采集。
文摘After some tragic fire events,Directive 2004/54/EC was issued to ensure a minimum safety level for tunnels belonging to the Trans-European Road Network longer than 500 m.Nowadays,most of the Italian road tunnels are still not in compliance with the minimum safety requirements,thus refurbishment works are often planned.By developing a traffic macro-simulation model,this paper aims at assessing the resilience of an existing twin-tube motorway tunnel when one of its tubes is partially or completely closed due to planned activities.Several scenarios were investigated,also considering the availability or not of an alternative itinerary in the surrounding transportation network.The average vehicles’speed was used as a functionality parameter,while the resilience metrics were the resilience loss,the recovery speed,and the resilience index.The findings showed higher resilience losses for complete closure rather than partial closure of the tube under planned refurbishment works.The implementation of digital technologies,such as variable message signs,might reduce the resilience loss of the tunnel system.This research might represent a reference for tunnel management agencies in the choice of the most appropriate traffic control strategy to improve tunnel resilience in the event of planned activities.
文摘Disadvantaged housing areas from the postwar period typically consist of relatively monotonous and monofunctional multi-storey blocks and have a separate traffic system rendering the areas isolated enclaves in the urban fabric.It is argued that this spatial isolation contributes to social isolation,and current refurbishments are therefore aimed at linking the housing areas with the surrounding neighbourhoods to enable social exchange between the residents and people from the surrounding areas.Based on a case study in a Danish social housing area,this paper discusses to what extent architectural development and urban strategic transformations can contribute to enabling social exchange in disadvantaged housing areas.Do neighbours enter the disadvantaged housing area as intended?If so,how does this influence their perception of the housing area?The analysis shows that architectural development and urban transformations are interdependent in establishing a social mix in disadvantaged housing areas.It is argued that refurbishments can reduce the stigma surrounding the housing area and its residents.However,the applicability of such strategies is highly dependent on the local context of the housing area.
基金supported by the National Science and Technology Major Project(J2019-IV-0003-0070)National Natural Science Foundation of China(12102320)China Postdoctoral Science Foundation(2021M692571).
文摘Refurbishment of thermal barrier coating(TBC)has become a valuable technique to prolong the service life of high-temperature components.This study investigates the effect of the refurbishment process(coating removal and recoating)on the microstructure evolution and physical properties of TBC,including oxidation characteristics,element diffusion behavior,and crack failure mechanisms.The results showed that a certain amount of interdiffusion zone(IDZ)with Cr-rich would be retained in DD6 superalloy substrate after coating removal.The microstructure of the refurbished specimens showed equiaxedβ-NiAl phases,while the ordinary specimens have elongated grain shapes with a high aspect ratio.Moreover,mixed oxides in the refurbished TBC specimens were earlier observed during cyclic oxidation,with a greater thickness compared to ordinary TBC,due to the influence of BC layer phase sizes.The growth mechanism of thermally grown oxide(TGO-Al_(2)O_(3)layer)in the refurbished TBC specimens was also different,resulting from the different mechanisms of mixed oxides growth.Furthermore,under cyclic oxidation with water quenching at 1100℃,the cracks in the refurbished specimen tend to occur in the mixed oxides layer,while the cracks in the ordinary specimen occur in the top coat(TC)layer,attributing to the earlier and thicker mixed oxides layer formed in refurbished specimens.
文摘The operational phase of a building project has increasingly gained importance with their energy performance becoming valuable and determining their operational excellence. In most heritage building projects (HBPs), the operational energy use aspects are less considered, and a systematic way of analyzing their energy performance following project delivery is often lacking, The aim of this study is to evaluate the operational performance of refurbishment and reuse of UK listed church projects. The objective is to assess the operational energy use with a view to optimizing their sustafnabie performance. The methodology includes eight selected case study buildings refurbished and converted for multipurpose use. The case study approach provided qualitative insights into how the study contributes to a more structured requirements for energy management in HBPs with specific attention to energy-efficient building operations. The findings show the need to focus on fundamental areas of operational management (i.e. by developing and implementing more focused policy on operational energy performance of heritage buildings) to minimize the energy required to operate them. The challenges of implementing changes in operational energy performance improvement of heritage buildings are addressed in the form of recommendations that could Lead to real results. The study concludes that leveraging these areas requires commitment from all heritage building stakeholders because they all have substantial roles in harmonizing the requirement for the project's sustainability and not just the building operators. Meanwhile, baseline project planning, periodic updating, monitoring, and managing the energy use pattern are suggested as measures that could greatly facilitate better energy performance to optimizing their sustainable reuse compared with the traditional approach of trying to improve their thermal performance.
文摘In this study, a simulation was conducted targeting Beomeo stream of Daegu, for the purpose of the quantitative determination of the changes in thermal environment of surrounding residential areas according to the urban river refurbishment. For the study method, the reviews of literature and model verification were conducted, and then the results were derived through the process of comparing and analyzing the thermal environment resulting from the river refurbishment of the target area. As a result of the model verification, the accuracy of modeling was 95%. As a result of a simulation of the target area, in respect of the fluctuation of temperature, the temperature decreased by 1.33°C more in the daytime than in the night time, due to the river refurbishment. In respect of the positions, the decrease of the temperature was 1.33°C at 2 pm at position 1, the position of river refurbishment, and the highest in the entire time slots. Also, the changes in temperature increasingly decreased from position 1 to position 4. It seemed that it was because there was the highest radiant heat at position 1 with the biggest gap between artificial mulching and natural mulching, and the effect of the gap in the radiant heat influenced successively over position 2, 3 and 4. Lastly, in respect of the effect of river refurbishment on the surrounding area, the effect reached to position 3, in other word, 60 meters from the river.
文摘This paper, computer energy modeling is used to estimate the potential energy savings of refurbishing existing public federal housing in the United Arab Emirates. Such houses are built by the UAE Ministry of Public Works (MoPW) in five of the seven emirates that make up the UAE federation. The energy modeling was performed using the Integrated Environmental Solutions-Virtual Environment (IES-VE) commercial software. The study covered representative MoPW houses built in the period of 1974-2012. The results indicate potential energy savings upto 30.8% for the case of model 717 when refurbished to 2 Pearls standards compared to the as built configuration. The results showed little benefit in going from 1 Pearl to 2 Pearls refurbishment level. Thus 1 Pearl seems to be the most practical. This shows the high potential for energy, and thus environmental, savings should refurbishment be carried out on the homes built by the MoPW.