The unquenchable demand for rock materials has attracted many companies within the building and construction sector to invest in stone quarrying. However, this has brought about environmental impacts with health threa...The unquenchable demand for rock materials has attracted many companies within the building and construction sector to invest in stone quarrying. However, this has brought about environmental impacts with health threats to people. There is a paucity of information about the magnitude of pollution on air and water and how it varies with quarry sites. This study, therefore, investigated the physical impacts of quarrying on air and water and explored the in-situ mitigations to undesirable effects due to stone quarrying. Four active quarry sites were identified. Field measurements of dust (particulate matter) were conducted within the four quarry sites and in the nearby community. Water samples were collected from quarry pits and nearby shallow wells for laboratory analysis of water quality. Statistical Analysis of Variance (ANOVA) was used to test for differences in pollution across the four studied sites. Results revealed that, amidst the use of wet crushing and water sprinkling on bare surfaces, dust emission was higher than the recommended permissible standards levels with a significant variation across the quarry sites with ANOVA (P-value = 0.003) for PM 2.5 and (P-value = 0.04366) for PM 10. Water pollution was mainly contributed by the non-permissive levels of nitrates, chromium, and pH. Polluted air and water are associated with sparking off health threats to the users in the community. In conclusion, quarry companies should strengthen the already existing mitigation of dust suppression. The study recommends additional measures such as treating quarry pit water before discharging to the open environment to enhance environmental protection against the accumulating undesirable quarry impacts.展开更多
Quarrying of ornamental stone has adverse effects that are both visual and environmental. This paper aims to develop a methodology for minimising the costs associated with reducing the visual impact of ornamental ston...Quarrying of ornamental stone has adverse effects that are both visual and environmental. This paper aims to develop a methodology for minimising the costs associated with reducing the visual impact of ornamental stone quarrying. This study uses digital topographical maps of the study zone and a GPS and GIS application to calculate the extent of the area affected by quarrying activities for each altitude designated in the work plan and to calculate the extent of the potential visual impact. The results obtained applying the proposed methodology for the selected area suggested that the potential visual impact is minimal for an altitude of 520 metres, this being the optimal point for the observer. When altitude increases, the potential visual impact increases and the optimal point for the observer diminishes until the highest impact altitude (740 m) is readied. The optimal point that the exploitation should reach is that at which the values of the diagram generated by the (%) area of potential visual impact and area of exploitation (%) intersect. The methodology allows the optimal altitude to be determined for mining exploitations and helps assess the viability of a given exploitation from an environmental point of view.展开更多
文摘The unquenchable demand for rock materials has attracted many companies within the building and construction sector to invest in stone quarrying. However, this has brought about environmental impacts with health threats to people. There is a paucity of information about the magnitude of pollution on air and water and how it varies with quarry sites. This study, therefore, investigated the physical impacts of quarrying on air and water and explored the in-situ mitigations to undesirable effects due to stone quarrying. Four active quarry sites were identified. Field measurements of dust (particulate matter) were conducted within the four quarry sites and in the nearby community. Water samples were collected from quarry pits and nearby shallow wells for laboratory analysis of water quality. Statistical Analysis of Variance (ANOVA) was used to test for differences in pollution across the four studied sites. Results revealed that, amidst the use of wet crushing and water sprinkling on bare surfaces, dust emission was higher than the recommended permissible standards levels with a significant variation across the quarry sites with ANOVA (P-value = 0.003) for PM 2.5 and (P-value = 0.04366) for PM 10. Water pollution was mainly contributed by the non-permissive levels of nitrates, chromium, and pH. Polluted air and water are associated with sparking off health threats to the users in the community. In conclusion, quarry companies should strengthen the already existing mitigation of dust suppression. The study recommends additional measures such as treating quarry pit water before discharging to the open environment to enhance environmental protection against the accumulating undesirable quarry impacts.
文摘Quarrying of ornamental stone has adverse effects that are both visual and environmental. This paper aims to develop a methodology for minimising the costs associated with reducing the visual impact of ornamental stone quarrying. This study uses digital topographical maps of the study zone and a GPS and GIS application to calculate the extent of the area affected by quarrying activities for each altitude designated in the work plan and to calculate the extent of the potential visual impact. The results obtained applying the proposed methodology for the selected area suggested that the potential visual impact is minimal for an altitude of 520 metres, this being the optimal point for the observer. When altitude increases, the potential visual impact increases and the optimal point for the observer diminishes until the highest impact altitude (740 m) is readied. The optimal point that the exploitation should reach is that at which the values of the diagram generated by the (%) area of potential visual impact and area of exploitation (%) intersect. The methodology allows the optimal altitude to be determined for mining exploitations and helps assess the viability of a given exploitation from an environmental point of view.