数据挖掘技术在手术室医院感染管理中的应用 被引量:20
1
作者 喻晓芬 王峥 过湘钗 《中华医院感染学杂志》 CAS CSCD 北大核心 2008年第1期78-81,共4页
目的探讨数据挖掘技术在手术室医院感染管理中的应用。方法在分析数据挖掘技术的基础上,对医院信息系统中的数据进行理解、准备、挖掘,并在手术室医院感染管理领域进行评估与应用。结果数据挖掘技术可应用于手术室医院感染管理的许多领... 目的探讨数据挖掘技术在手术室医院感染管理中的应用。方法在分析数据挖掘技术的基础上,对医院信息系统中的数据进行理解、准备、挖掘,并在手术室医院感染管理领域进行评估与应用。结果数据挖掘技术可应用于手术室医院感染管理的许多领域:手术室无菌物品及一次性用品智能备库系统,预测术后切口感染,合理安排手术,并防止抗菌药物的滥用,根据围术期的抗菌药物应用分析其与耐药性的规律,对参观手术人员和进修生实习生的管理,利用医院信息系统(HIS)中知识解决难点和杜绝差错,对手术室医院感染常规工作动态监测。结论数据挖掘技术作为一门新的技术,能从数据库中识别出有效的、新颖的、潜在的信息与知识,并能在手术室医院感染管理中得到很好的应用。 展开更多
关键词 数据挖掘 手术室 医院感染
下载PDF
Stability and control of room mining coal pillars-taking room mining coal pillars of solid backfill recovery as an example 被引量:12
2
作者 ZHANG Ji-xiong HUANG Peng +2 位作者 ZHANG Qiang LI Meng CHEN Zhi-wei 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第5期1121-1132,共12页
The stability of room mining coal pillars during their secondary mining for recovering coal was analyzed. An analysis was performed for the damage and instability mechanism of coal pillars recovered by the caving mini... The stability of room mining coal pillars during their secondary mining for recovering coal was analyzed. An analysis was performed for the damage and instability mechanism of coal pillars recovered by the caving mining method. During the damage progression of a single room coal pillar, the shape of the stress distribution in the pillar transformed from the initial stable saddle shape to the final arch-shaped distribution of critical instability. By combining the shapes of stress distribution in the coal pillars with the ultimate strength theory, the safe-stress value of coal pillar was obtained as 11.8 MPa. The mechanism of instability of coal pillar groups recovered by the caving mining method was explained by the domino effect. Since the room coal pillars mined and recovered by the traditional caving mining method were significantly influenced by the secondary mining during recovery, the coal pillars would go through a chain-type instability failure. Because of this limitation, the method of solid backfilling was proposed for mining and recovering room coal pillars, thus changing the transfer mechanism of stress caused by the secondary mining(recovery) of coal pillars. The mechanical model of the stope in the case of backfilling and recovering room coal pillars was built. The peak stress values inside coal pillars varied with the variance of backfilling ratio when the working face was advanced by 150 m. Furthermore, when the critical backfilling ratio was 80.6%, the instability failure of coal pillars would not occur during the solid backfill mining process. By taking Bandingliang Coal Mine as an example, the coal pillars' stability of stope under this backfilling ratio was studied, and a project scheme was designed. 展开更多
关键词 room mining stability of COAL PILLARS COAL mining of SOLID BACKFILL ultimate strength instability failure
下载PDF
Cancelling ore pillars in large-scale coastal gold deposit: A case study in Sanshandao gold mine, China 被引量:10
3
作者 刘志祥 党文刚 +1 位作者 贺显群 李地元 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2013年第10期3046-3054,共9页
According to the actual conditions in Sanshandao Gold Mine, the cancelling ore pillars mining method was researched. Firstly, a series of tests for the physical and mechanical characteristics of rock mass were carried... According to the actual conditions in Sanshandao Gold Mine, the cancelling ore pillars mining method was researched. Firstly, a series of tests for the physical and mechanical characteristics of rock mass were carried out and a quality classification system of rock mass applied in coastal metal deposit was established. Secondly, the reasonable demarcation depth of cancelling ore pillars was simulated using the finite element method, and the simulation results show that the ore pillars can be cancelled below the level of-555 m. Thirdly, a novel layer-backfill mining method of room-pillar alternation was designed to reduce the disturbance and settlement of terrain in mining area. Engineering practice shows that the new mining method enhanced the mining output and relieved rock disturbance. Furthermore, the settlement of the roof strata was small and no disaster occurred. The new mining technology effectively controlled the deformation of the terrain, indicating that the mining of the large-scale gold coastal deposit in Sanshandao Gold Mine was achieved safely, efficiently, and with a low loss rate. 展开更多
关键词 coastal deposit rock quality evaluation numerical simulation layer-backfill mining method of room-pillar alternation monitoring system
下载PDF
近距离煤层上行开采可行性研究 被引量:7
4
作者 孙泽东 郝兵元 黄辉 《煤炭技术》 CAS 北大核心 2014年第10期147-150,共4页
根据小回沟煤矿8#和9#煤层特殊地质情况,对其上行开采可行性进行研究。通过采动影响系数法、三带判断法、围岩平衡法论证得出9#煤层采用房柱式开采后可以实现8#煤层蹬空开采。结合房柱式开采工艺理论要求及8#煤层长壁工作面向底板传递... 根据小回沟煤矿8#和9#煤层特殊地质情况,对其上行开采可行性进行研究。通过采动影响系数法、三带判断法、围岩平衡法论证得出9#煤层采用房柱式开采后可以实现8#煤层蹬空开采。结合房柱式开采工艺理论要求及8#煤层长壁工作面向底板传递载荷计算分析合理设计9#煤层采留比,并运用FLAC3D数值模拟验证了理论分析的正确性。 展开更多
关键词 上行开采 蹬空开采 房柱式 传递载荷
下载PDF
Preventing roof fall fatalities during pillar recovery:A ground control success story 被引量:4
5
作者 Mark Christopher Gauna Michael 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第1期107-113,共7页
For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines.Studies showed that a miner on a pillar recovery section was at least three times more likely to be killed by ... For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines.Studies showed that a miner on a pillar recovery section was at least three times more likely to be killed by a roof fall than other coal miners. Since 2007, however, there has been just one fatal roof fall on a pillar line. This paper describes the process that resulted in this historic achievement. It covers both the key research findings and the ways in which those insights, beginning in the early 2000 s, were implemented in mining practice. One key finding was that safe pillar recovery requires both global and local stability.Global stability is addressed primarily through proper pillar design, and became a major focus after the2007 Crandall Canyon mine disaster. But the most significant improvements resulted from detailed studies that showed that local stability, defined as roof control in the immediate work area, could be achieved with three interventions:(1) leaving an engineered final stump, rather than extracting the entire pillar,(2) enhancing roof bolt support, particularly in intersections, and(3) increasing the use of mobile roof supports(MRS). A final component was an emphasis on better management of pillar recovery operations.This included a focus on worker positioning, as well as on the pillar and lift sequences, MRS operations,and hazard identification. As retreat mines have incorporated these elements into their roof control plans,it has become clear that pillar recovery is not ‘‘inherently unsafe." The paper concludes with a discussion of the challenges that remain, including the problems of rib falls and coal bursts. 展开更多
关键词 Retreat mining Roof support room-and-pillar Ground control
下载PDF
基于数据挖掘分析的手术室病理标本质控优化研究 被引量:5
6
作者 许多 李影 吴蒸 《中国医院》 2016年第4期30-31,共2页
目的:利用数据挖掘分析影响手术室病理标本质量的影响因素,制定并实施针对性的改进措施。方法:利用Epi Data 3.1软件将温州医科大学第一医院手术室2012年1月—2014年6月发生的158起病理标本差错缺陷事故建立数据库,利用SPSS13.0软件进行... 目的:利用数据挖掘分析影响手术室病理标本质量的影响因素,制定并实施针对性的改进措施。方法:利用Epi Data 3.1软件将温州医科大学第一医院手术室2012年1月—2014年6月发生的158起病理标本差错缺陷事故建立数据库,利用SPSS13.0软件进行Logistic回归分析,分析出主要影响因素,从而制定并实施针对性的改进措施。比较2014年(改进前)和2015年(改进后)手术室病理标本差错缺陷事故发生率、手术医生与病理科人员对标本管理满意度差异。结果:2014年和2015年病理标本差错缺陷事故发生率分别为0.15%、0.05%(P<0.001);2014年和2015年手术医生、病理科人员对手术室标本管理的满意度分别为89.11%、94.57%(P<0.001)。结论:通过数据挖掘方法能分析出标本差错缺陷事故发生的根本原因,制定有针对性的改进措施并在临床中实践,从而降低标本差错缺陷事故发生率,提高了手术医生与病理科人员对标本管理的满意度。 展开更多
关键词 数据库 数据挖掘 病理标本 手术室
下载PDF
Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams 被引量:2
7
作者 Peter Zhang Berk Tulu +1 位作者 Morgan Sears Jack Trackemas 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2018年第1期21-27,共7页
Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground fall fatalities in underground coal mines in the United States.The risk of ground falls during pillar recov... Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground fall fatalities in underground coal mines in the United States.The risk of ground falls during pillar recovery increases in multiple-seam mining conditions.The hazards associated with pillar recovery in multiple-seam mining include roof cutters, roof falls, rib rolls, coal outbursts, and floor heave.When pillar recovery is planned in multiple seams, it is critical to properly design the mining sequence and panel layout to minimize potential seam interaction.This paper addresses geotechnical considerations for concurrent pillar recovery in two coal seams with 21 m of interburden under about 305 m of depth of cover.The study finds that, for interburden thickness of 21 m, the multiple-seam mining influence zone in the lower seam is directly under the barrier pillar within about 30 m from the gob edge of the upper seam.The peak stress in the interburden transfers down at an angle of approximately 20°away from the gob, and the entries and crosscuts in the influence zone are subjected to elevated stress during development and retreat.The study also suggests that, for full pillar recovery in close-distance multiple-seam scenarios,it is optimal to superimpose the gobs in both seams, but it is not necessary to superimpose the pillars.If the entries and/or crosscuts in the lower seam are developed outside the gob line of the upper seam,additional roof and rib support needs to be considered to account for the elevated stress in the multiple-seam influence zone. 展开更多
关键词 PILLAR recovery room-and-pillar RETREAT mining MULTIPLE SEAM mining sequence PILLAR design
下载PDF
清水江磷矿矿柱置换设计方法与计算
8
作者 张长江 《科技资讯》 2024年第7期102-104,共3页
在清水江矿既有采矿方法基础上,利用充填法对保安矿柱进行置换,先回采保安矿柱,再进行充填,完成保安矿柱置换,然后再大面积进行矿体回采,并根据地质报告及现场岩石力学参数对清水江矿矿房宽度进行了计算,考虑了岩石的弯曲、剪切等一系... 在清水江矿既有采矿方法基础上,利用充填法对保安矿柱进行置换,先回采保安矿柱,再进行充填,完成保安矿柱置换,然后再大面积进行矿体回采,并根据地质报告及现场岩石力学参数对清水江矿矿房宽度进行了计算,考虑了岩石的弯曲、剪切等一系列力学条件,对开阳县及周边矿区矿柱置换具有借鉴意义。 展开更多
关键词 清水江磷矿 矿柱置换 矿房 矿体同采
下载PDF
物元分析法的矿房稳定性分析
9
作者 乔烨彬 《世界有色金属》 2024年第8期184-187,共4页
某些矿种因为价值较低,一般采用房柱法开采缓倾斜薄的矿体。又由于其自身矿岩强度可能较低,带有明显的软岩特征,此时,矿房稳定性对于矿山安全生产具有非常重要的意义。考虑到矿房稳定性受矿房暴露面积、矿房顶板矿岩体质量及矿房所受地... 某些矿种因为价值较低,一般采用房柱法开采缓倾斜薄的矿体。又由于其自身矿岩强度可能较低,带有明显的软岩特征,此时,矿房稳定性对于矿山安全生产具有非常重要的意义。考虑到矿房稳定性受矿房暴露面积、矿房顶板矿岩体质量及矿房所受地应力等多种因素影响,采用物元分析法对矿房稳定性进行了分析:先确定矿房稳定性影响因素的分级标准,根据各待分析矿房的稳定性影响因素指标实际值,计算其对于各影响因素的各经典域和节域的距离,并根据层次分析法确定各影响因素的权重,进而计算矿房各稳定性等级的综合关联度,进而根据最大隶属度原则对矿房稳定性进行判定。实例证明:物元分析法可以对矿房稳定性进行科学分析和准确评价,进而可为矿房有针对性地采取维稳措施提供参考与依据,实现矿房经济高效维稳。 展开更多
关键词 矿房 稳定性 物元分析
下载PDF
行走支架护顶房柱式短壁开采技术应用 被引量:4
10
作者 郝万东 《煤炭工程》 北大核心 2014年第7期55-57,共3页
文章从工作面设备选型配套、巷道布置与块段划分、巷道掘进与支护、工作面回采工艺、顶板管理与控制、工作面通风方式等几个方面论述了行走支架护顶房柱式短壁开采技术在乌兰木伦矿61204工作面的现场应用情况,结果表明,行走支架护顶房... 文章从工作面设备选型配套、巷道布置与块段划分、巷道掘进与支护、工作面回采工艺、顶板管理与控制、工作面通风方式等几个方面论述了行走支架护顶房柱式短壁开采技术在乌兰木伦矿61204工作面的现场应用情况,结果表明,行走支架护顶房柱式短壁开采技术实现了顶板的安全有效控制和工作面全负压通风,大大提高了工作面回采率,有效解决了我国现行短壁开采过程中存在的煤柱留设多、通风效果差、顶板垮落较难控制等问题。 展开更多
关键词 短壁开采 行走支架 负压通风 巷道布置 房柱式
下载PDF
条带式充填开采矿房煤柱设计方法研究 被引量:2
11
作者 王兵强 谷拴成 +1 位作者 樊琦 李孝波 《煤炭工程》 北大核心 2017年第6期1-5,共5页
结合工程实例,探讨分析深埋煤层条带式充填开采矿房煤柱布置中巷道宽度,巷间煤柱宽度,巷间煤柱个数和隔离煤柱宽度等参数之间的相互影响关系,计算出巷间煤柱安全系数和隔离煤柱宽度及安全系数;对开采区间上方压力拱稳定性进行分析,得出... 结合工程实例,探讨分析深埋煤层条带式充填开采矿房煤柱布置中巷道宽度,巷间煤柱宽度,巷间煤柱个数和隔离煤柱宽度等参数之间的相互影响关系,计算出巷间煤柱安全系数和隔离煤柱宽度及安全系数;对开采区间上方压力拱稳定性进行分析,得出压力拱拱腹和拱脚是其稳定性的关键,并计算拱腹和拱脚的安全系数;根据条带式开采布置方式推导出开采率和充填率的计算公式,并计算28种巷道和煤柱布置方案的开采率和不同充填系数下的充填率。最终,根据巷道宽度、巷间煤柱宽度和个数、隔离煤柱宽度、煤柱稳定性、压力拱稳定性以及开采率和充填率等参数对28种布置方案进行比选,推荐满足适用性、稳定性和经济性的合理方案。 展开更多
关键词 条带式开采 压力拱 矿房 煤柱 开采率
下载PDF
Protecting miners from coal bursts during development above historic mine workings in Harlan County,KY 被引量:3
12
作者 Christopher Mark 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2021年第1期111-116,共6页
In order to reach a large,untapped reserve of high-quality coal,D8 Cloverlick Mine proposed to mine a corridor nearly 600 m deep beneath the Benham Spur of Black Mountain,Kentucky’s highest peak.D8 Cloverlick Mine wa... In order to reach a large,untapped reserve of high-quality coal,D8 Cloverlick Mine proposed to mine a corridor nearly 600 m deep beneath the Benham Spur of Black Mountain,Kentucky’s highest peak.D8 Cloverlick Mine was extracting the Owl seam,but the corridor’s route lay approximately 20 m above century-old mine workings in the C–(Darby)seam.Adding to the concern,three serious coal bursts had recently occurred in nearby Owl seam workings.Maps of the old workings seemed to indicate that the underlying C–seam had been fully extracted.However,two of the coal bursts had occurred above areas where the C–Seam was also shown as mined out.Mine Safety and Health Administration(MSHA)Technical Support therefore investigated the records of past mining to better understand the old mine maps.Underground conditions observed in current Owl seam workings were also compared with the maps of the old C–seam workings.The study concluded that the presence of hazardous underlying remnants could not be ruled out.To mitigate the burst risk,D8 Cloverlick Mine adopted a strategy of stress probe drilling.A self-propelled coal drill was used to auger 11.5-m-long,small diameter holes in advance of mining.As each hole was drilled,the cuttings were measured to detect the presence of highly stressed coal.Ultimately the crossing was successfully completed without incident. 展开更多
关键词 Coal bursts Underground mining room-and-pillar DESTRESSING
下载PDF
Geomechanical design of a room and rib pillar granite mine
13
作者 Daniele Peila Claudia Guardini Sebastiano Pelizza 《Journal of University of Science and Technology Beijing》 CSCD 2008年第2期97-103,共7页
The geomechanical and stability design of an underground granite mine located in Canal San Bovo (Trento district, Northeastern Italy) was described. The exploitation of the granite, which is used in the ceramic indu... The geomechanical and stability design of an underground granite mine located in Canal San Bovo (Trento district, Northeastern Italy) was described. The exploitation of the granite, which is used in the ceramic industry, was carried out by the rooms and rib pillars method. The rooms are 12 m wide while the pillars are 11 m wide and they cross the main discontinuity set of the rock mass in the perpendicular direction. To verify the stability condition of an underground mine, it is necessary to carry out the calcula- tions that are able to check both the local and global stability of the rock mass. In the studied example, this approach has been applied with the development of analytical and numerical parametric analyses and it has permitted to get the best orientation and to design the size of rooms and pillars. 展开更多
关键词 mining room and pillar rock mechanics stability analysis
下载PDF
动环集约化系统平台在通信机房中的拓展应用研究 被引量:2
14
作者 徐世军 《通信电源技术》 2019年第11期193-195,197,共4页
随着4G向5G网络不断推进,机房设备不断扩容和更新,承载的数据业务逐渐多元化。基于云计算的托管服务越来越多,机房的信息化处理工作尤为重要,需要在动力和环境安全保障下完成。于是,远程监控系统的作用越来越凸显。从通信机房的设备运... 随着4G向5G网络不断推进,机房设备不断扩容和更新,承载的数据业务逐渐多元化。基于云计算的托管服务越来越多,机房的信息化处理工作尤为重要,需要在动力和环境安全保障下完成。于是,远程监控系统的作用越来越凸显。从通信机房的设备运行管理现状、动环系统的现状和发展趋势、动环集约化的特点、动环监控系统的拓展应用、设计与实现动环集约系统的收益等多个方面出发,阐述机房设备运行管理中的痛点问题和动环集约化监控系统在通信机房管控中的重要作用,并探析如何通过动环集约化系统平台的拓展应用充分发挥其能动性,保障通信机房设备安全,从而进一步提升集约平台的智能化辅助决策作用。 展开更多
关键词 动环集约化系统平台 数据挖掘 通信机房 监控系统 信息化
下载PDF
银山铅锌矿井下特殊采矿法浅析 被引量:1
15
作者 陈土友 《湖南有色金属》 CAS 2000年第3期9-12,共4页
总结了银山铅锌矿井下几种特殊采矿法的使用经验 ,并就其使用效果及适用条件进行分析和探讨。
关键词 采矿场结构 回采 铅锌矿 采矿方法 井下采矿
下载PDF
采场围岩特性的反分析研究
16
作者 赵阳生 常青 张惠轩 《阜新矿业学院学报》 1989年第3期51-57,共7页
本文详细论述了采场围岩特性反分析的方法、数学模型、优化方法、约束条件等等.依据以上理论与龙凤矿的实测位移,采用有限单元与带约束条件的Nelder—Mead优化方法,得出了—635水平采场岩体与岩块杨氏模量之比为0.52,以及采动引起的工... 本文详细论述了采场围岩特性反分析的方法、数学模型、优化方法、约束条件等等.依据以上理论与龙凤矿的实测位移,采用有限单元与带约束条件的Nelder—Mead优化方法,得出了—635水平采场岩体与岩块杨氏模量之比为0.52,以及采动引起的工作面前方煤体特性的变化规律. 展开更多
关键词 煤矿 采场 围岩 反分析
下载PDF
长沙冰雪世界项目下挂马道及泵房施工技术
17
作者 何昌杰 李璐 +1 位作者 吴智 黄虎 《施工技术》 CAS 2020年第14期18-21,共4页
依托长沙冰雪世界项目,对单层通高建筑马道安装技术进行优化,形成单层通高建筑大型下挂马道单元块悬空提升施工技术,解决安装设备提升不够高或移动平台失稳的难题。同时,根据现场整体施工进度安排,在主体建筑平台优先施工的前提下,形成... 依托长沙冰雪世界项目,对单层通高建筑马道安装技术进行优化,形成单层通高建筑大型下挂马道单元块悬空提升施工技术,解决安装设备提升不够高或移动平台失稳的难题。同时,根据现场整体施工进度安排,在主体建筑平台优先施工的前提下,形成马道泵房后挂施工技术。 展开更多
关键词 矿坑 下挂马道 泵房 提升 安装 施工技术
下载PDF
综放采空区空间自燃三带划分指标及方法研究 被引量:131
18
作者 谢军 薛生 《煤炭科学技术》 CAS 北大核心 2011年第1期65-68,共4页
针对综采放顶煤的特殊开采工艺,分析了采空区浮煤赋存状态,将综放采空区冒落带自上而下分为矸石带、矸石与浮煤混合带、浮煤带等3个带,提出了在工作面走向上和采空区垂直高度上都存在自燃三带、2个方向上三带的有机组合构成综放采空区... 针对综采放顶煤的特殊开采工艺,分析了采空区浮煤赋存状态,将综放采空区冒落带自上而下分为矸石带、矸石与浮煤混合带、浮煤带等3个带,提出了在工作面走向上和采空区垂直高度上都存在自燃三带、2个方向上三带的有机组合构成综放采空区空间自燃三带的论断,进而提出了空间自燃三带的概念;在对煤炭自然发火条件分析的基础上,确定把氧气浓度和浮煤厚度分布作为空间自燃三带划分指标,制定了空间自燃三带的划分标准,利用该标准对实际综放工作面采空区进行了划分。 展开更多
关键词 综放采空区 空间自燃三带 自然发火 浮煤分布 划分指标
下载PDF
浅埋近距离煤层过上覆采空区及煤柱动压防治技术 被引量:53
19
作者 杨俊哲 《煤炭科学技术》 CAS 北大核心 2015年第6期9-13 40,40,共6页
针对浅埋近距离综采工作面过上覆房采采空区和集中煤柱时易发生动压事故,并导致大面积切顶压架事故的问题,结合石圪台矿31号煤层综采工作面动压防治实践,分析可知采动影响导致上覆采空区集中煤柱失稳引发其上覆基岩关键块突然回转失稳,... 针对浅埋近距离综采工作面过上覆房采采空区和集中煤柱时易发生动压事故,并导致大面积切顶压架事故的问题,结合石圪台矿31号煤层综采工作面动压防治实践,分析可知采动影响导致上覆采空区集中煤柱失稳引发其上覆基岩关键块突然回转失稳,进而破坏下煤层基岩关键块的铰接结构,使其由回转失稳变为破坏性的滑落失稳,上下基岩层关键块体失稳产生的冲击载荷作用直接导致动压事故。结合顶板运动规律,提出了提前采取爆破集中煤柱、缩短工作面长度等技术,避免了上下煤层基岩失稳冲击叠加,减少了覆岩运动影响范围和程度,并在现场采用微震监测、地面钻孔多点位移计和地表下沉量观测等手段进行指导和验证,有效解决浅埋近距离综采工作面过上覆房采采空区和集中煤柱时易发生动压事故的问题。 展开更多
关键词 浅埋煤层 近距离煤层开采 房采采空区 集中煤柱 动载矿压 微震监测
下载PDF
浅埋近距离房式煤柱下采动应力演化及致灾机制 被引量:52
20
作者 白庆升 屠世浩 +1 位作者 王方田 袁永 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2012年第A02期3772-3778,共7页
浅埋近距离房式煤柱下长壁工作面回采将受到上煤层采空区遗留煤柱和本煤层工作面动压的共同影响。针对石圪台矿3–1–2煤层工作面顶板压力大、支架被压死等问题,采用理论分析、数值模拟及现场试验等方法,探讨采动应力演化规律及压架致... 浅埋近距离房式煤柱下长壁工作面回采将受到上煤层采空区遗留煤柱和本煤层工作面动压的共同影响。针对石圪台矿3–1–2煤层工作面顶板压力大、支架被压死等问题,采用理论分析、数值模拟及现场试验等方法,探讨采动应力演化规律及压架致灾机制。研究结果表明,与莫尔–库仑准则相比,应变软化准则能够准确地反映上层遗留房式煤柱在下层长壁工作面采动应力影响下的变形破坏机制;当上层遗留煤柱较完整,下煤层工作面位于煤柱下方时,受煤柱应力集中及采动影响,下煤层工作面顶板沿煤柱边缘直接切落,载荷集中造成支架压死。通过采前或回采过程中爆破上层遗留煤柱,将顶板压力转移到工作面前方煤岩体内,有效减小工作面围岩应力集中,保证下煤层工作面安全开采。 展开更多
关键词 采矿工程 房式遗留煤柱 应变软化准则 应力演化 压架致灾 爆破煤柱
下载PDF