The stability of room mining coal pillars during their secondary mining for recovering coal was analyzed. An analysis was performed for the damage and instability mechanism of coal pillars recovered by the caving mini...The stability of room mining coal pillars during their secondary mining for recovering coal was analyzed. An analysis was performed for the damage and instability mechanism of coal pillars recovered by the caving mining method. During the damage progression of a single room coal pillar, the shape of the stress distribution in the pillar transformed from the initial stable saddle shape to the final arch-shaped distribution of critical instability. By combining the shapes of stress distribution in the coal pillars with the ultimate strength theory, the safe-stress value of coal pillar was obtained as 11.8 MPa. The mechanism of instability of coal pillar groups recovered by the caving mining method was explained by the domino effect. Since the room coal pillars mined and recovered by the traditional caving mining method were significantly influenced by the secondary mining during recovery, the coal pillars would go through a chain-type instability failure. Because of this limitation, the method of solid backfilling was proposed for mining and recovering room coal pillars, thus changing the transfer mechanism of stress caused by the secondary mining(recovery) of coal pillars. The mechanical model of the stope in the case of backfilling and recovering room coal pillars was built. The peak stress values inside coal pillars varied with the variance of backfilling ratio when the working face was advanced by 150 m. Furthermore, when the critical backfilling ratio was 80.6%, the instability failure of coal pillars would not occur during the solid backfill mining process. By taking Bandingliang Coal Mine as an example, the coal pillars' stability of stope under this backfilling ratio was studied, and a project scheme was designed.展开更多
According to the actual conditions in Sanshandao Gold Mine, the cancelling ore pillars mining method was researched. Firstly, a series of tests for the physical and mechanical characteristics of rock mass were carried...According to the actual conditions in Sanshandao Gold Mine, the cancelling ore pillars mining method was researched. Firstly, a series of tests for the physical and mechanical characteristics of rock mass were carried out and a quality classification system of rock mass applied in coastal metal deposit was established. Secondly, the reasonable demarcation depth of cancelling ore pillars was simulated using the finite element method, and the simulation results show that the ore pillars can be cancelled below the level of-555 m. Thirdly, a novel layer-backfill mining method of room-pillar alternation was designed to reduce the disturbance and settlement of terrain in mining area. Engineering practice shows that the new mining method enhanced the mining output and relieved rock disturbance. Furthermore, the settlement of the roof strata was small and no disaster occurred. The new mining technology effectively controlled the deformation of the terrain, indicating that the mining of the large-scale gold coastal deposit in Sanshandao Gold Mine was achieved safely, efficiently, and with a low loss rate.展开更多
For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines.Studies showed that a miner on a pillar recovery section was at least three times more likely to be killed by ...For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines.Studies showed that a miner on a pillar recovery section was at least three times more likely to be killed by a roof fall than other coal miners. Since 2007, however, there has been just one fatal roof fall on a pillar line. This paper describes the process that resulted in this historic achievement. It covers both the key research findings and the ways in which those insights, beginning in the early 2000 s, were implemented in mining practice. One key finding was that safe pillar recovery requires both global and local stability.Global stability is addressed primarily through proper pillar design, and became a major focus after the2007 Crandall Canyon mine disaster. But the most significant improvements resulted from detailed studies that showed that local stability, defined as roof control in the immediate work area, could be achieved with three interventions:(1) leaving an engineered final stump, rather than extracting the entire pillar,(2) enhancing roof bolt support, particularly in intersections, and(3) increasing the use of mobile roof supports(MRS). A final component was an emphasis on better management of pillar recovery operations.This included a focus on worker positioning, as well as on the pillar and lift sequences, MRS operations,and hazard identification. As retreat mines have incorporated these elements into their roof control plans,it has become clear that pillar recovery is not ‘‘inherently unsafe." The paper concludes with a discussion of the challenges that remain, including the problems of rib falls and coal bursts.展开更多
目的:利用数据挖掘分析影响手术室病理标本质量的影响因素,制定并实施针对性的改进措施。方法:利用Epi Data 3.1软件将温州医科大学第一医院手术室2012年1月—2014年6月发生的158起病理标本差错缺陷事故建立数据库,利用SPSS13.0软件进行...目的:利用数据挖掘分析影响手术室病理标本质量的影响因素,制定并实施针对性的改进措施。方法:利用Epi Data 3.1软件将温州医科大学第一医院手术室2012年1月—2014年6月发生的158起病理标本差错缺陷事故建立数据库,利用SPSS13.0软件进行Logistic回归分析,分析出主要影响因素,从而制定并实施针对性的改进措施。比较2014年(改进前)和2015年(改进后)手术室病理标本差错缺陷事故发生率、手术医生与病理科人员对标本管理满意度差异。结果:2014年和2015年病理标本差错缺陷事故发生率分别为0.15%、0.05%(P<0.001);2014年和2015年手术医生、病理科人员对手术室标本管理的满意度分别为89.11%、94.57%(P<0.001)。结论:通过数据挖掘方法能分析出标本差错缺陷事故发生的根本原因,制定有针对性的改进措施并在临床中实践,从而降低标本差错缺陷事故发生率,提高了手术医生与病理科人员对标本管理的满意度。展开更多
Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground fall fatalities in underground coal mines in the United States.The risk of ground falls during pillar recov...Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground fall fatalities in underground coal mines in the United States.The risk of ground falls during pillar recovery increases in multiple-seam mining conditions.The hazards associated with pillar recovery in multiple-seam mining include roof cutters, roof falls, rib rolls, coal outbursts, and floor heave.When pillar recovery is planned in multiple seams, it is critical to properly design the mining sequence and panel layout to minimize potential seam interaction.This paper addresses geotechnical considerations for concurrent pillar recovery in two coal seams with 21 m of interburden under about 305 m of depth of cover.The study finds that, for interburden thickness of 21 m, the multiple-seam mining influence zone in the lower seam is directly under the barrier pillar within about 30 m from the gob edge of the upper seam.The peak stress in the interburden transfers down at an angle of approximately 20°away from the gob, and the entries and crosscuts in the influence zone are subjected to elevated stress during development and retreat.The study also suggests that, for full pillar recovery in close-distance multiple-seam scenarios,it is optimal to superimpose the gobs in both seams, but it is not necessary to superimpose the pillars.If the entries and/or crosscuts in the lower seam are developed outside the gob line of the upper seam,additional roof and rib support needs to be considered to account for the elevated stress in the multiple-seam influence zone.展开更多
In order to reach a large,untapped reserve of high-quality coal,D8 Cloverlick Mine proposed to mine a corridor nearly 600 m deep beneath the Benham Spur of Black Mountain,Kentucky’s highest peak.D8 Cloverlick Mine wa...In order to reach a large,untapped reserve of high-quality coal,D8 Cloverlick Mine proposed to mine a corridor nearly 600 m deep beneath the Benham Spur of Black Mountain,Kentucky’s highest peak.D8 Cloverlick Mine was extracting the Owl seam,but the corridor’s route lay approximately 20 m above century-old mine workings in the C–(Darby)seam.Adding to the concern,three serious coal bursts had recently occurred in nearby Owl seam workings.Maps of the old workings seemed to indicate that the underlying C–seam had been fully extracted.However,two of the coal bursts had occurred above areas where the C–Seam was also shown as mined out.Mine Safety and Health Administration(MSHA)Technical Support therefore investigated the records of past mining to better understand the old mine maps.Underground conditions observed in current Owl seam workings were also compared with the maps of the old C–seam workings.The study concluded that the presence of hazardous underlying remnants could not be ruled out.To mitigate the burst risk,D8 Cloverlick Mine adopted a strategy of stress probe drilling.A self-propelled coal drill was used to auger 11.5-m-long,small diameter holes in advance of mining.As each hole was drilled,the cuttings were measured to detect the presence of highly stressed coal.Ultimately the crossing was successfully completed without incident.展开更多
The geomechanical and stability design of an underground granite mine located in Canal San Bovo (Trento district, Northeastern Italy) was described. The exploitation of the granite, which is used in the ceramic indu...The geomechanical and stability design of an underground granite mine located in Canal San Bovo (Trento district, Northeastern Italy) was described. The exploitation of the granite, which is used in the ceramic industry, was carried out by the rooms and rib pillars method. The rooms are 12 m wide while the pillars are 11 m wide and they cross the main discontinuity set of the rock mass in the perpendicular direction. To verify the stability condition of an underground mine, it is necessary to carry out the calcula- tions that are able to check both the local and global stability of the rock mass. In the studied example, this approach has been applied with the development of analytical and numerical parametric analyses and it has permitted to get the best orientation and to design the size of rooms and pillars.展开更多
基金Project(2014ZDPY02)supported by the Fundamental Research Funds for the Central Universities
文摘The stability of room mining coal pillars during their secondary mining for recovering coal was analyzed. An analysis was performed for the damage and instability mechanism of coal pillars recovered by the caving mining method. During the damage progression of a single room coal pillar, the shape of the stress distribution in the pillar transformed from the initial stable saddle shape to the final arch-shaped distribution of critical instability. By combining the shapes of stress distribution in the coal pillars with the ultimate strength theory, the safe-stress value of coal pillar was obtained as 11.8 MPa. The mechanism of instability of coal pillar groups recovered by the caving mining method was explained by the domino effect. Since the room coal pillars mined and recovered by the traditional caving mining method were significantly influenced by the secondary mining during recovery, the coal pillars would go through a chain-type instability failure. Because of this limitation, the method of solid backfilling was proposed for mining and recovering room coal pillars, thus changing the transfer mechanism of stress caused by the secondary mining(recovery) of coal pillars. The mechanical model of the stope in the case of backfilling and recovering room coal pillars was built. The peak stress values inside coal pillars varied with the variance of backfilling ratio when the working face was advanced by 150 m. Furthermore, when the critical backfilling ratio was 80.6%, the instability failure of coal pillars would not occur during the solid backfill mining process. By taking Bandingliang Coal Mine as an example, the coal pillars' stability of stope under this backfilling ratio was studied, and a project scheme was designed.
基金Projects(2013BAB02B03,2012BAB08B00)supported by the National Science and Technology Support Program of ChinaProject(51074177)supported by the Joint Funding of National Natural Science Foundation and Shanghai Baosteel Group CorporationProjects(51274254,51322403)supported by the National Natural Science Foundation of China
文摘According to the actual conditions in Sanshandao Gold Mine, the cancelling ore pillars mining method was researched. Firstly, a series of tests for the physical and mechanical characteristics of rock mass were carried out and a quality classification system of rock mass applied in coastal metal deposit was established. Secondly, the reasonable demarcation depth of cancelling ore pillars was simulated using the finite element method, and the simulation results show that the ore pillars can be cancelled below the level of-555 m. Thirdly, a novel layer-backfill mining method of room-pillar alternation was designed to reduce the disturbance and settlement of terrain in mining area. Engineering practice shows that the new mining method enhanced the mining output and relieved rock disturbance. Furthermore, the settlement of the roof strata was small and no disaster occurred. The new mining technology effectively controlled the deformation of the terrain, indicating that the mining of the large-scale gold coastal deposit in Sanshandao Gold Mine was achieved safely, efficiently, and with a low loss rate.
文摘For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines.Studies showed that a miner on a pillar recovery section was at least three times more likely to be killed by a roof fall than other coal miners. Since 2007, however, there has been just one fatal roof fall on a pillar line. This paper describes the process that resulted in this historic achievement. It covers both the key research findings and the ways in which those insights, beginning in the early 2000 s, were implemented in mining practice. One key finding was that safe pillar recovery requires both global and local stability.Global stability is addressed primarily through proper pillar design, and became a major focus after the2007 Crandall Canyon mine disaster. But the most significant improvements resulted from detailed studies that showed that local stability, defined as roof control in the immediate work area, could be achieved with three interventions:(1) leaving an engineered final stump, rather than extracting the entire pillar,(2) enhancing roof bolt support, particularly in intersections, and(3) increasing the use of mobile roof supports(MRS). A final component was an emphasis on better management of pillar recovery operations.This included a focus on worker positioning, as well as on the pillar and lift sequences, MRS operations,and hazard identification. As retreat mines have incorporated these elements into their roof control plans,it has become clear that pillar recovery is not ‘‘inherently unsafe." The paper concludes with a discussion of the challenges that remain, including the problems of rib falls and coal bursts.
文摘目的:利用数据挖掘分析影响手术室病理标本质量的影响因素,制定并实施针对性的改进措施。方法:利用Epi Data 3.1软件将温州医科大学第一医院手术室2012年1月—2014年6月发生的158起病理标本差错缺陷事故建立数据库,利用SPSS13.0软件进行Logistic回归分析,分析出主要影响因素,从而制定并实施针对性的改进措施。比较2014年(改进前)和2015年(改进后)手术室病理标本差错缺陷事故发生率、手术医生与病理科人员对标本管理满意度差异。结果:2014年和2015年病理标本差错缺陷事故发生率分别为0.15%、0.05%(P<0.001);2014年和2015年手术医生、病理科人员对手术室标本管理的满意度分别为89.11%、94.57%(P<0.001)。结论:通过数据挖掘方法能分析出标本差错缺陷事故发生的根本原因,制定有针对性的改进措施并在临床中实践,从而降低标本差错缺陷事故发生率,提高了手术医生与病理科人员对标本管理的满意度。
文摘Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground fall fatalities in underground coal mines in the United States.The risk of ground falls during pillar recovery increases in multiple-seam mining conditions.The hazards associated with pillar recovery in multiple-seam mining include roof cutters, roof falls, rib rolls, coal outbursts, and floor heave.When pillar recovery is planned in multiple seams, it is critical to properly design the mining sequence and panel layout to minimize potential seam interaction.This paper addresses geotechnical considerations for concurrent pillar recovery in two coal seams with 21 m of interburden under about 305 m of depth of cover.The study finds that, for interburden thickness of 21 m, the multiple-seam mining influence zone in the lower seam is directly under the barrier pillar within about 30 m from the gob edge of the upper seam.The peak stress in the interburden transfers down at an angle of approximately 20°away from the gob, and the entries and crosscuts in the influence zone are subjected to elevated stress during development and retreat.The study also suggests that, for full pillar recovery in close-distance multiple-seam scenarios,it is optimal to superimpose the gobs in both seams, but it is not necessary to superimpose the pillars.If the entries and/or crosscuts in the lower seam are developed outside the gob line of the upper seam,additional roof and rib support needs to be considered to account for the elevated stress in the multiple-seam influence zone.
文摘In order to reach a large,untapped reserve of high-quality coal,D8 Cloverlick Mine proposed to mine a corridor nearly 600 m deep beneath the Benham Spur of Black Mountain,Kentucky’s highest peak.D8 Cloverlick Mine was extracting the Owl seam,but the corridor’s route lay approximately 20 m above century-old mine workings in the C–(Darby)seam.Adding to the concern,three serious coal bursts had recently occurred in nearby Owl seam workings.Maps of the old workings seemed to indicate that the underlying C–seam had been fully extracted.However,two of the coal bursts had occurred above areas where the C–Seam was also shown as mined out.Mine Safety and Health Administration(MSHA)Technical Support therefore investigated the records of past mining to better understand the old mine maps.Underground conditions observed in current Owl seam workings were also compared with the maps of the old C–seam workings.The study concluded that the presence of hazardous underlying remnants could not be ruled out.To mitigate the burst risk,D8 Cloverlick Mine adopted a strategy of stress probe drilling.A self-propelled coal drill was used to auger 11.5-m-long,small diameter holes in advance of mining.As each hole was drilled,the cuttings were measured to detect the presence of highly stressed coal.Ultimately the crossing was successfully completed without incident.
文摘The geomechanical and stability design of an underground granite mine located in Canal San Bovo (Trento district, Northeastern Italy) was described. The exploitation of the granite, which is used in the ceramic industry, was carried out by the rooms and rib pillars method. The rooms are 12 m wide while the pillars are 11 m wide and they cross the main discontinuity set of the rock mass in the perpendicular direction. To verify the stability condition of an underground mine, it is necessary to carry out the calcula- tions that are able to check both the local and global stability of the rock mass. In the studied example, this approach has been applied with the development of analytical and numerical parametric analyses and it has permitted to get the best orientation and to design the size of rooms and pillars.