The state of Cameroon, faced with the situation the electricity deficits, is promoting the development of renewable energies in general and to meet rural electrification needs in particular. The purpose of this work i...The state of Cameroon, faced with the situation the electricity deficits, is promoting the development of renewable energies in general and to meet rural electrification needs in particular. The purpose of this work is to study the feasibility of the MHP of Batcheu, to show its contribution to sustainable development in this locality and to prove that it is a profitable project. After study, it appears that the waterfall of Batcheu is favourable to the establishment of a MHP with an installed power of 260 kW with an operating diagram corresponding to a Francis turbine. Given that it is a renewable energy that can supply more than 800 households in rural areas, its contribution to sustainable development is obvious. Its investment cost is estimated at 171,465,396 FCFA. It is a profitable project with a payback time of 7 years and 2 months.展开更多
Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated...Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated at around 170 kg. In these mining areas, people still live in a screaming precariousness of which one of the main causes is often the lack of electricity, because of the distance of these localities to the national electricity network. Cameroon has a great hydroelectric potential, but the access rate to electricity is still very low in isolate or rural areas of this country. The objective of this work is to show that it is possible to efficiently exploit gold in isolated areas and contribute to the sustainable development of these localities through the development of micro hydro power (MHP). The mining community of Tikondi in the East Region of Cameroon is the practical case study for an illustration. The results of this study show that the development of the MHP project can be developed with installed power of 87 kW, where the Banki-Michell turbine is recommended according to the Sulzer-Escher Wyss diagram. The investment cost evaluated at 79,832,775 FCFA (1 Euro = 656 FCFA). It is a profitable project with a maximum payback period of 8 years. This project can be easily funded by gold mining activity. That Tikondi’s MHP can make this village becoming attractive for others activities, improving the quality of education of children (there is not any school and lots of them do not go to school), the building of health centers and the quality of life in that locality and therefore contribute to their sustainable development too.展开更多
Utilization of Micro Hydro Power Plant at the Gunung Halu case study type run-off the river is a household use only in the afternoon,around 5 pm until bedtime at about 10 pm.Therefore,more than 75%of the energy is los...Utilization of Micro Hydro Power Plant at the Gunung Halu case study type run-off the river is a household use only in the afternoon,around 5 pm until bedtime at about 10 pm.Therefore,more than 75%of the energy is lost.This case study lost power which can be used as a by-product,such as for drying coffee beans.In this case study,a design was carried out to obtain by-products and improve power quality in the electrical system.In addition,they complain about the poor quality of power controlled by frequency using Triac-Based Electronic Dummy Load Control.The heat from the dummy load in the case study is used as a by-product.MHP with a minimum power of 20 kW,and the usage time of customer service is about 6 h.The energy for the by-products is about 360 kWh/day,and the power quality improved by using Triac-Based Electronic Load Control and Hysteresis Current Control for the active filter.As a result,the power factor is close to one,the generator current harmonics is less than 2%,and the voltage harmonics is less than 5%.展开更多
文摘The state of Cameroon, faced with the situation the electricity deficits, is promoting the development of renewable energies in general and to meet rural electrification needs in particular. The purpose of this work is to study the feasibility of the MHP of Batcheu, to show its contribution to sustainable development in this locality and to prove that it is a profitable project. After study, it appears that the waterfall of Batcheu is favourable to the establishment of a MHP with an installed power of 260 kW with an operating diagram corresponding to a Francis turbine. Given that it is a renewable energy that can supply more than 800 households in rural areas, its contribution to sustainable development is obvious. Its investment cost is estimated at 171,465,396 FCFA. It is a profitable project with a payback time of 7 years and 2 months.
文摘Of all the precious metals buried in the Cameroonian subsoil, gold is certainly the longest exploited. It has longtime been the subject of artisanal exploitation. In 2014, the monthly national production was estimated at around 170 kg. In these mining areas, people still live in a screaming precariousness of which one of the main causes is often the lack of electricity, because of the distance of these localities to the national electricity network. Cameroon has a great hydroelectric potential, but the access rate to electricity is still very low in isolate or rural areas of this country. The objective of this work is to show that it is possible to efficiently exploit gold in isolated areas and contribute to the sustainable development of these localities through the development of micro hydro power (MHP). The mining community of Tikondi in the East Region of Cameroon is the practical case study for an illustration. The results of this study show that the development of the MHP project can be developed with installed power of 87 kW, where the Banki-Michell turbine is recommended according to the Sulzer-Escher Wyss diagram. The investment cost evaluated at 79,832,775 FCFA (1 Euro = 656 FCFA). It is a profitable project with a maximum payback period of 8 years. This project can be easily funded by gold mining activity. That Tikondi’s MHP can make this village becoming attractive for others activities, improving the quality of education of children (there is not any school and lots of them do not go to school), the building of health centers and the quality of life in that locality and therefore contribute to their sustainable development too.
基金This research was funded by Politeknik Negeri Bandung for funding this research in the 2021 budget year through a grant for applied research,Number B/78.14/PL1.R7/PG.00.03/2021.
文摘Utilization of Micro Hydro Power Plant at the Gunung Halu case study type run-off the river is a household use only in the afternoon,around 5 pm until bedtime at about 10 pm.Therefore,more than 75%of the energy is lost.This case study lost power which can be used as a by-product,such as for drying coffee beans.In this case study,a design was carried out to obtain by-products and improve power quality in the electrical system.In addition,they complain about the poor quality of power controlled by frequency using Triac-Based Electronic Dummy Load Control.The heat from the dummy load in the case study is used as a by-product.MHP with a minimum power of 20 kW,and the usage time of customer service is about 6 h.The energy for the by-products is about 360 kWh/day,and the power quality improved by using Triac-Based Electronic Load Control and Hysteresis Current Control for the active filter.As a result,the power factor is close to one,the generator current harmonics is less than 2%,and the voltage harmonics is less than 5%.