To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the w...To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014. The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli(E) of the dam body and foundation, using a three-dimensional finite element model for the linear elastic material of the arch dam. The main monitoring indices presented insignificant changes in the late period of the initial impoundment, and the results of feedback analysis were consistent with monitoring results. Analysis results also show that the deformations of the dam body and dam foundation were within the design range; the dam stress distributions were normal, with values lower than the design control criteria; and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house, demonstrating that the Jinping-I Arch Dam was in good working condition, and the initial impoundment had been successfully completed. The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects.展开更多
Based on the discussion of the multi-level intake application status of high dam reservoir,this paper takes the Jinping-I hydropower project reservoir in the Yalong River as an example,which is shaped by the highest 3...Based on the discussion of the multi-level intake application status of high dam reservoir,this paper takes the Jinping-I hydropower project reservoir in the Yalong River as an example,which is shaped by the highest 305 m high arch dam,and carries out the forecasting research on the reservoir temperature by numerical simulation and physical model testing.This paper studies the intake effect of withdrawing the surface warm water by the stoplog gates inlets and verifies the reliability of the mathematical model by comparative analysis.The results show that for a high dam hydropower station,taking the appropriate multi-level intake measure can withdraw the surface warm water in the spawning season and provide a favorable environment for the fish reproduction.Innovative technical ideas and implementation scheme are adopted in this research.It can provide technical reference for the solutions of similar problems in the future and it also has important engineering significance on the research of water temperature in large deep reservoirs.展开更多
基金supported by the National Key Technology Support Program(Grant No.2013BAB05B05)
文摘To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014. The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli(E) of the dam body and foundation, using a three-dimensional finite element model for the linear elastic material of the arch dam. The main monitoring indices presented insignificant changes in the late period of the initial impoundment, and the results of feedback analysis were consistent with monitoring results. Analysis results also show that the deformations of the dam body and dam foundation were within the design range; the dam stress distributions were normal, with values lower than the design control criteria; and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house, demonstrating that the Jinping-I Arch Dam was in good working condition, and the initial impoundment had been successfully completed. The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects.
基金supported by the National Natural Science Foundation of China and EHDC Yalong River Joint Research Foundation of Hydropower Development Project(Grant No.50639070)
文摘Based on the discussion of the multi-level intake application status of high dam reservoir,this paper takes the Jinping-I hydropower project reservoir in the Yalong River as an example,which is shaped by the highest 305 m high arch dam,and carries out the forecasting research on the reservoir temperature by numerical simulation and physical model testing.This paper studies the intake effect of withdrawing the surface warm water by the stoplog gates inlets and verifies the reliability of the mathematical model by comparative analysis.The results show that for a high dam hydropower station,taking the appropriate multi-level intake measure can withdraw the surface warm water in the spawning season and provide a favorable environment for the fish reproduction.Innovative technical ideas and implementation scheme are adopted in this research.It can provide technical reference for the solutions of similar problems in the future and it also has important engineering significance on the research of water temperature in large deep reservoirs.