期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
锦屏一级水电站左岸坝肩边坡施工期稳定分析 被引量:25
1
作者 漆祖芳 姜清辉 +1 位作者 唐志丹 周创兵 《岩土力学》 EI CAS CSCD 北大核心 2012年第2期531-538,共8页
锦屏一级水电站左岸坝肩高陡边坡地质条件复杂、主要发育有f5、f8、f42-9断层,煌斑岩脉X,顺坡卸荷裂隙及深部裂缝等结构面,其中断层f42-9、煌斑岩脉X和深部裂缝SL44-1组合形成的左岸坝头拉裂变形体,在边坡施工期的稳定性问题突出,特别... 锦屏一级水电站左岸坝肩高陡边坡地质条件复杂、主要发育有f5、f8、f42-9断层,煌斑岩脉X,顺坡卸荷裂隙及深部裂缝等结构面,其中断层f42-9、煌斑岩脉X和深部裂缝SL44-1组合形成的左岸坝头拉裂变形体,在边坡施工期的稳定性问题突出,特别是当边坡开挖至1 780 m高程时拉裂变形体前沿剪出口阻滑岩体被完全挖除,f42-9断层在开挖坡面出露,拉裂变形体稳定条件恶化,稳定性急剧下降。采用考虑开挖过程的有限元强度折减法分析开挖边坡在施工期的稳定性,并提出了一种新的边坡失稳判据:通过滑体内关键部位测点水平位移随折减系数的变化率,即水平位移增量与强度折减系数增量之比值t/F和强度折减系数Ft关系曲线的突变点来确定边坡的临界失稳状态。通过与其他边坡失稳判据相比较,验证了该判据的合理性和实用性,同时基于该判据计算了边坡开挖加固至不同高程下的稳定安全系数,合理评价左坝肩边坡施工期的整体稳定与安全性。 展开更多
关键词 锦屏一级水电站 边坡稳定性 有限元强度折减法 失稳判据 安全系数
下载PDF
Analysis of working behavior of Jinping-I Arch Dam during initial impoundment 被引量:5
2
作者 Shi-yong Wu Wei Cao Jiang Zheng 《Water Science and Engineering》 EI CAS CSCD 2016年第3期240-248,共9页
To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the w... To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014. The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli(E) of the dam body and foundation, using a three-dimensional finite element model for the linear elastic material of the arch dam. The main monitoring indices presented insignificant changes in the late period of the initial impoundment, and the results of feedback analysis were consistent with monitoring results. Analysis results also show that the deformations of the dam body and dam foundation were within the design range; the dam stress distributions were normal, with values lower than the design control criteria; and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house, demonstrating that the Jinping-I Arch Dam was in good working condition, and the initial impoundment had been successfully completed. The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects. 展开更多
关键词 DAM safety monitoring Working behavior Elastic modulus DAM iMPOUNDMENT jinping-i hydropower project
下载PDF
Research on the multi-level intake water temperature effect of the Yalong River Jinping-I hydropower project 被引量:1
3
作者 WU ShiYong 1,CAO Wei 1,WANG HongMei 1,SUN ShuangKe 2 &CHEN QiuWen 3 1 Ertan Hydropower Development Company,Ltd.,Chengdu 610051,China 2 China Institute of Water Resources and Hydropower Research,Beijing 100038,China 3 Research Center for Eco-Environmental Sciences,Chinese Academy of Sciences,Beijing 100085,China 《Science China(Technological Sciences)》 SCIE EI CAS 2011年第S1期125-132,共8页
Based on the discussion of the multi-level intake application status of high dam reservoir,this paper takes the Jinping-I hydropower project reservoir in the Yalong River as an example,which is shaped by the highest 3... Based on the discussion of the multi-level intake application status of high dam reservoir,this paper takes the Jinping-I hydropower project reservoir in the Yalong River as an example,which is shaped by the highest 305 m high arch dam,and carries out the forecasting research on the reservoir temperature by numerical simulation and physical model testing.This paper studies the intake effect of withdrawing the surface warm water by the stoplog gates inlets and verifies the reliability of the mathematical model by comparative analysis.The results show that for a high dam hydropower station,taking the appropriate multi-level intake measure can withdraw the surface warm water in the spawning season and provide a favorable environment for the fish reproduction.Innovative technical ideas and implementation scheme are adopted in this research.It can provide technical reference for the solutions of similar problems in the future and it also has important engineering significance on the research of water temperature in large deep reservoirs. 展开更多
关键词 water temperature multi-level iNTAKE jinping-i hydropower project
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部