IEEE 1012 [1] describes the SDLC phase activities for software independent verification and validation (IV & V) for nuclear power plant in truly general and conceptual manner, which requires the upward and/or down...IEEE 1012 [1] describes the SDLC phase activities for software independent verification and validation (IV & V) for nuclear power plant in truly general and conceptual manner, which requires the upward and/or downward tailoring on its interpretation for practical IV & V. It contains crucial and encompassing check points and guidelines to analyze the design integrity, without addressing the formalized and the specific criteria for IV & V activities confirming the technical integrity. It is necessary to list up the inspection viewpoint via interpretation of the standard that is practical review points checking design consistency. For fruitful IV & V of Control Element Driving Mechanism Control System (CEDMCS) software for Yonggwang Nuclear Power Plant unit 3 & 4, the specific viewpoints and approach are necessary based on the guidelines of IEEE 1012 to enhance the system quality by considering the level of implementation of the theoretical and the practical IV & V. Additionally IV & V guideline of IEEE 1012 does not specifically provide the concrete measure considering the system characteristics of CEDMCS. This paper provides the seven (7) characteristic criteria for CEDMCS IV & V, and by applying these viewpoints, the design analysis such as function, performance, interface and exception, backward and forward requirement traceability analysis has been conducted. The requirement, design, implementation, and test phase were only considered for IV & V in this project. This article also provides the translation of code to map theoretical verification and validation into practical verification and validation. This paper emphasizes the necessity of the intensive design inspection and walkthrough for requirement phase to resolve the design faults because the IV & V of early phase of SDLC obviously contributes to find out most of critical design inconsistency. Especially for test phase IV & V, it is strongly recommended to prepare the test plan document which is going to be the basis for the test coverage selection and te展开更多
网络通信中的网络冗余协议,如快速生成树协议(Rapid Spanning Tree Protocol,RSTP),在网络发生单点故障时其可靠性需进一步提高才能用反应堆数字化仪表与控制系统中。本文介绍了应用于智能变电站的IEC62439-3标准所发布的并行冗余协议(P...网络通信中的网络冗余协议,如快速生成树协议(Rapid Spanning Tree Protocol,RSTP),在网络发生单点故障时其可靠性需进一步提高才能用反应堆数字化仪表与控制系统中。本文介绍了应用于智能变电站的IEC62439-3标准所发布的并行冗余协议(Parallel Redundancy Protocol,PRP),分析了该协议实现高可靠性和高可用性的原理,并在Linux网络协议栈应用层开发了基于TCP/IP的PRP协议软件。测试表明,在应用层实现PRP协议的方案可行,可以达到零自愈和零丢包的高可靠性要求,为提高反应堆仪控系统控制网络的可靠性提供了参考思路和实现方式。展开更多
文摘IEEE 1012 [1] describes the SDLC phase activities for software independent verification and validation (IV & V) for nuclear power plant in truly general and conceptual manner, which requires the upward and/or downward tailoring on its interpretation for practical IV & V. It contains crucial and encompassing check points and guidelines to analyze the design integrity, without addressing the formalized and the specific criteria for IV & V activities confirming the technical integrity. It is necessary to list up the inspection viewpoint via interpretation of the standard that is practical review points checking design consistency. For fruitful IV & V of Control Element Driving Mechanism Control System (CEDMCS) software for Yonggwang Nuclear Power Plant unit 3 & 4, the specific viewpoints and approach are necessary based on the guidelines of IEEE 1012 to enhance the system quality by considering the level of implementation of the theoretical and the practical IV & V. Additionally IV & V guideline of IEEE 1012 does not specifically provide the concrete measure considering the system characteristics of CEDMCS. This paper provides the seven (7) characteristic criteria for CEDMCS IV & V, and by applying these viewpoints, the design analysis such as function, performance, interface and exception, backward and forward requirement traceability analysis has been conducted. The requirement, design, implementation, and test phase were only considered for IV & V in this project. This article also provides the translation of code to map theoretical verification and validation into practical verification and validation. This paper emphasizes the necessity of the intensive design inspection and walkthrough for requirement phase to resolve the design faults because the IV & V of early phase of SDLC obviously contributes to find out most of critical design inconsistency. Especially for test phase IV & V, it is strongly recommended to prepare the test plan document which is going to be the basis for the test coverage selection and te