High frequency pulsating voltage injection method is a good candidate for detecting the initial rotor position of permanent magnet synchronous motor.However,traditional methods require a large number of filters,which ...High frequency pulsating voltage injection method is a good candidate for detecting the initial rotor position of permanent magnet synchronous motor.However,traditional methods require a large number of filters,which leads to the deterioration of system stability and dynamic performance.In order to solve these problems,a new signal demodulation method is proposed in this paper.The proposed new method can directly obtain the amplitude of high-frequency current,thus eliminating the use of filters,improving system stability and dynamic performance and saving the work of adjusting filter parameters.In addition,a new magnetic polarity detection method is proposed,which is robust to current measurement noise.Finally,experiments verify the effectiveness of the method.展开更多
Based on the large-scale model tests, a simplified dam breach model for homogeneous cohesive dam due to overtopping failure is put forward. The model considers headcut erosion as one of the key homogeneous cohesive da...Based on the large-scale model tests, a simplified dam breach model for homogeneous cohesive dam due to overtopping failure is put forward. The model considers headcut erosion as one of the key homogeneous cohesive dam breaching mechanisms and we calculate the time-averaged headcut migration rate using an energy-based empirical formula. A numerical method is adopted to determine the initial scour position at the downstream slope in terms of the water head and dam height, and the broad-crested weir equation is utilized to simulate the breach flow. The limit equilibrium method is used to analyze the stability of breach slope during the breach process. An iterative method is developed to simulate the coupling process of soil and water at each time step. The calculated results of three dam breach cases testify the reasonability of the model, and the sensitivity studies of soil erodibility show that sensitivity is dependent on each test case's soil conditions. In addition, three typical dam breach models, NWS BREACH, WinDAM B, and HR BREACH, are also chosen to compare with the proposed model. It is found that NWS BREACH may have large errors for cohesive dams, since it uses a noncohesive sediment transport model and does notconsider headcut erosion, WinDAM B and HR BREACH consider headcut erosion as the breaching mechanism and handle well homogeneous cohesive dam overtopping failure, but overall, the proposed model has the best performance.展开更多
基金supported by the National Natural Science Foundation of China under Grant 51991384Anhui Provincial Major Science and Technology Project under Grant 202203c08020010。
文摘High frequency pulsating voltage injection method is a good candidate for detecting the initial rotor position of permanent magnet synchronous motor.However,traditional methods require a large number of filters,which leads to the deterioration of system stability and dynamic performance.In order to solve these problems,a new signal demodulation method is proposed in this paper.The proposed new method can directly obtain the amplitude of high-frequency current,thus eliminating the use of filters,improving system stability and dynamic performance and saving the work of adjusting filter parameters.In addition,a new magnetic polarity detection method is proposed,which is robust to current measurement noise.Finally,experiments verify the effectiveness of the method.
基金Natural Science Foundation of China(Grant No.51379129,51539006,51509164)
文摘Based on the large-scale model tests, a simplified dam breach model for homogeneous cohesive dam due to overtopping failure is put forward. The model considers headcut erosion as one of the key homogeneous cohesive dam breaching mechanisms and we calculate the time-averaged headcut migration rate using an energy-based empirical formula. A numerical method is adopted to determine the initial scour position at the downstream slope in terms of the water head and dam height, and the broad-crested weir equation is utilized to simulate the breach flow. The limit equilibrium method is used to analyze the stability of breach slope during the breach process. An iterative method is developed to simulate the coupling process of soil and water at each time step. The calculated results of three dam breach cases testify the reasonability of the model, and the sensitivity studies of soil erodibility show that sensitivity is dependent on each test case's soil conditions. In addition, three typical dam breach models, NWS BREACH, WinDAM B, and HR BREACH, are also chosen to compare with the proposed model. It is found that NWS BREACH may have large errors for cohesive dams, since it uses a noncohesive sediment transport model and does notconsider headcut erosion, WinDAM B and HR BREACH consider headcut erosion as the breaching mechanism and handle well homogeneous cohesive dam overtopping failure, but overall, the proposed model has the best performance.