淤地坝作为黄土丘陵沟壑区水土流失治理的重要工程措施之一,其坝系优化布局、相对稳定性及坝地效益等受到广泛关注,但对其淤积过程研究甚少。该文通过对黄土高原淤地坝进行调查,典型坝淤积过程剖面的观测及取样分析,结合库容曲线和每个...淤地坝作为黄土丘陵沟壑区水土流失治理的重要工程措施之一,其坝系优化布局、相对稳定性及坝地效益等受到广泛关注,但对其淤积过程研究甚少。该文通过对黄土高原淤地坝进行调查,典型坝淤积过程剖面的观测及取样分析,结合库容曲线和每个淤积层的淤积厚度求出分层淤积量。根据暴雨产沙过程原理及淤积过程降雨资料,反演淤地坝各淤积层所对应的次侵蚀性降雨,建立层淤积量与相应次侵蚀性降雨指标的相关方程。研究结果表明:坝地淤积物中层淤积量和次侵蚀性降雨的降雨侵蚀力呈幂函数关系,层淤积量和次侵蚀性降雨的最大30 m in降雨强度呈指数函数关系,经检验结果良好。展开更多
The operation methods of channel and the speed of gate regulation have great influence on the transformation of flow in water conveyance channels. Based on characteristics method, a 1-D unsteady flow numerical model f...The operation methods of channel and the speed of gate regulation have great influence on the transformation of flow in water conveyance channels. Based on characteristics method, a 1-D unsteady flow numerical model for gate regulation was established in this study. The process of water flow was simulated under different boundary conditions. The influence of gate regulation speed and channel operation methods on flow transition process was analyzed. The numerical results show that under the same conditions, with increasing regulation speed of the gate, the change rates of discharge and water level increase, while the response time of channel becomes shorter, and ultimately the discharge and water level will transit to the same equilibrium states. Moreover, the flow is easier to reach stable state, if the water level in front of the sluice is kept constant, instead of,behind the sluice. This study will be important to the scheme design of automatic operation control in water conveyance channels.展开更多
With the current situation of insecurity in Nigeria and the worsening condition of Nigerian roads, there is increasing demand for air travel. This increasing demand for airline services amidst limited resources result...With the current situation of insecurity in Nigeria and the worsening condition of Nigerian roads, there is increasing demand for air travel. This increasing demand for airline services amidst limited resources results in passenger dissatisfaction and reduction of revenue for airports and airlines. The dynamics of service demand and resource supply result in check-in issues for all the stakeholders in the commercial aviation industry. Hence, this research simulated the developed model for travelers’ check-in process at the “D Wing” of the Departure Section of Murtala Muhammed International Airport (MMIA), Ikeja, using Arena Software Tool. The simulation of the developed model was carried out by varying five different configurations of the servers with respect to the baggage weighing machines and passenger profiling devices to obtain the minimum average check-in time (ACT) for the process, with each configuration undergoing 133 completions of simulation runs. The result of the experimentation revealed that the 3 × 3 × 4 configuration of servers produced the smallest ACT of 18.25 minutes. This translates to a difference of about 58 minutes from the 76.16 minutes ACT of the real system;representing about 76% improvement in the check-in time of passengers. This study contributed to knowledge by revealing that the main choke points in the MMIA check-in system occur at the baggage weighing and passenger profiling areas as against the check-in counter sub-section as advanced by previous works. Furthermore, the research added value to knowledge by creating a balance between customer satisfaction and cost of operations thereby accommodating the interests of the passenger and the operator who are the two main stakeholders in the commercial aviation industry.展开更多
文摘淤地坝作为黄土丘陵沟壑区水土流失治理的重要工程措施之一,其坝系优化布局、相对稳定性及坝地效益等受到广泛关注,但对其淤积过程研究甚少。该文通过对黄土高原淤地坝进行调查,典型坝淤积过程剖面的观测及取样分析,结合库容曲线和每个淤积层的淤积厚度求出分层淤积量。根据暴雨产沙过程原理及淤积过程降雨资料,反演淤地坝各淤积层所对应的次侵蚀性降雨,建立层淤积量与相应次侵蚀性降雨指标的相关方程。研究结果表明:坝地淤积物中层淤积量和次侵蚀性降雨的降雨侵蚀力呈幂函数关系,层淤积量和次侵蚀性降雨的最大30 m in降雨强度呈指数函数关系,经检验结果良好。
基金supported by the National Natural SciencFoundation of China (Grant No. 59879016)the National BasiResearch Program of China (973 Program, Grant No2003CB415200)
文摘The operation methods of channel and the speed of gate regulation have great influence on the transformation of flow in water conveyance channels. Based on characteristics method, a 1-D unsteady flow numerical model for gate regulation was established in this study. The process of water flow was simulated under different boundary conditions. The influence of gate regulation speed and channel operation methods on flow transition process was analyzed. The numerical results show that under the same conditions, with increasing regulation speed of the gate, the change rates of discharge and water level increase, while the response time of channel becomes shorter, and ultimately the discharge and water level will transit to the same equilibrium states. Moreover, the flow is easier to reach stable state, if the water level in front of the sluice is kept constant, instead of,behind the sluice. This study will be important to the scheme design of automatic operation control in water conveyance channels.
文摘With the current situation of insecurity in Nigeria and the worsening condition of Nigerian roads, there is increasing demand for air travel. This increasing demand for airline services amidst limited resources results in passenger dissatisfaction and reduction of revenue for airports and airlines. The dynamics of service demand and resource supply result in check-in issues for all the stakeholders in the commercial aviation industry. Hence, this research simulated the developed model for travelers’ check-in process at the “D Wing” of the Departure Section of Murtala Muhammed International Airport (MMIA), Ikeja, using Arena Software Tool. The simulation of the developed model was carried out by varying five different configurations of the servers with respect to the baggage weighing machines and passenger profiling devices to obtain the minimum average check-in time (ACT) for the process, with each configuration undergoing 133 completions of simulation runs. The result of the experimentation revealed that the 3 × 3 × 4 configuration of servers produced the smallest ACT of 18.25 minutes. This translates to a difference of about 58 minutes from the 76.16 minutes ACT of the real system;representing about 76% improvement in the check-in time of passengers. This study contributed to knowledge by revealing that the main choke points in the MMIA check-in system occur at the baggage weighing and passenger profiling areas as against the check-in counter sub-section as advanced by previous works. Furthermore, the research added value to knowledge by creating a balance between customer satisfaction and cost of operations thereby accommodating the interests of the passenger and the operator who are the two main stakeholders in the commercial aviation industry.