Due to the complex features of rock mass blastability assessment systems, an evaluation model of rock mass blastability was established on the basis of the unascertained measurement (UM) theory and the actual charac...Due to the complex features of rock mass blastability assessment systems, an evaluation model of rock mass blastability was established on the basis of the unascertained measurement (UM) theory and the actual characteristics of the project. Considering a comprehensive range of intact rock properties and discontinuous structures of rock mass, twelve main factors influencing the evaluation blastability of rock mass were taken into account in the UM model, and the blastability evaluation index system of rock mass was constructed. The unascertained evaluation indices corresponding to the selected factors for the actual situation were solved both qualitatively and quantitatively. Then, the UM function of each evaluation index was obtained based on the initial data for the analysis of the blastability of six rock mass at a highway improvement cutting site in North Wales. The index weights of the factors were calculated by entropy theory, and credible degree identification (CDI) criteria were established according to the UM theory. The results of rock mass blastability evaluation were obtained by the CDI criteria. The results show that the UM model assessment results agree well with the actual records, and are consistent with those of the fuzzy sets evaluation method. Meanwhile, the unascertained superiority degree of rock mass blastability of samples S1-$6 which can be calculated by scoring criteria are 3.428 5, 3.453 3, 4.058 7, 3.675 9, 3.516 7 and 3.289 7, respectively. Furthermore, the proposed method can take into account large amount of uncertain information in blastability evaluation, which can provide an effective, credible and feasible way for estimating the blastability of rock mass. Engineering practices show that it can complete the blastability assessment systematically and scientifically without any assumption by the proposed model, which can be applied to practical engineering.展开更多
To improve spectrum utilization and minimize interference to Primary User (PU), an adaptive spectrum decision method is proposed for Secondary User (SU), while taking traffic load balancing and spectrum heterogeneity ...To improve spectrum utilization and minimize interference to Primary User (PU), an adaptive spectrum decision method is proposed for Secondary User (SU), while taking traffic load balancing and spectrum heterogeneity into consideration. Long-term statistics and current sensing results are integrated into the proposed decision method of spectrum access. Two decision methods, namely probability based and sensing based, are presented, compared and followed by performance analysis in terms of delay. For probability based spectrum decision, Short-Time-Job-First (STJF) priority queuing discipline is employed to minimize average residual time and theoretical conclusion is derived in a novel way. For sensing based decision we treat the interrupted service of SU as newly incoming and re-decision process is initialized to find available spectrum in a First-Available-First-Access (FAFA) fashion. Effect of sensing error in PHY layer is also analyzed in terms of extended average residual time. Simulation results show that, for relatively low arriving rate of SU traffic, the proposed spectrum decision method yields at least a delay reduction of 39.5% compared with non-adaptive method. The proposed spectrum decision can significantly improve delay performance even facing sensing errors, which cause performance degeneration to both PU and SU.展开更多
A suite of elements(Ag,Au,Ba,Bi,Cd,Co,Cr,Cu,Ga,Hf,Hg,Mn,Mo,Ni,Pb,Rb,Sb,Se, Sr,Te and Zn),total organic carbon(TOC)and pH were analyzed in stream sediment and tailing samples from Um Shashoba area,in order to evalu...A suite of elements(Ag,Au,Ba,Bi,Cd,Co,Cr,Cu,Ga,Hf,Hg,Mn,Mo,Ni,Pb,Rb,Sb,Se, Sr,Te and Zn),total organic carbon(TOC)and pH were analyzed in stream sediment and tailing samples from Um Shashoba area,in order to evaluate Au placer and the sediments being impacted by old mining activities.Analytical results were examined using statistical,graphical and mapping methods.In spite of the results revealing that Au and most of the elements in sediments were in general significantly lower than those in tailing,Au was concentrated in the NE and SW parts forming Au placer.It is remarkably a close association of Au with Hg and Sb;both are useful as pathfinder elements for Au placers.Values of pH could not control a fate of analyzed elements,whereas TOC and Mn oxides and hydroxides could uptake some elements Au,Ba,Co,Cr,Hg,Ni,and Sr.The results also indicated that the sediments were contaminated by anthropogenic factors causing moderate,strong to very strong pollution with respect to Bi,Se and Te,respectively.Additionally,geogenic factors could also contribute elemental enrichment to the drainage system and cause significant toxicity level.展开更多
基金Project(50934006) supported by the National Natural Science Foundation of ChinaProject(2010CB732004) supported by the National Basic Research Program of China+1 种基金Project(2009ssxt230) supported by the Central South University Innovation Fund,ChinaProject(CX2011B119) supported by the Graduated Students’Research and Innovation Fund of Hunan Province,China
文摘Due to the complex features of rock mass blastability assessment systems, an evaluation model of rock mass blastability was established on the basis of the unascertained measurement (UM) theory and the actual characteristics of the project. Considering a comprehensive range of intact rock properties and discontinuous structures of rock mass, twelve main factors influencing the evaluation blastability of rock mass were taken into account in the UM model, and the blastability evaluation index system of rock mass was constructed. The unascertained evaluation indices corresponding to the selected factors for the actual situation were solved both qualitatively and quantitatively. Then, the UM function of each evaluation index was obtained based on the initial data for the analysis of the blastability of six rock mass at a highway improvement cutting site in North Wales. The index weights of the factors were calculated by entropy theory, and credible degree identification (CDI) criteria were established according to the UM theory. The results of rock mass blastability evaluation were obtained by the CDI criteria. The results show that the UM model assessment results agree well with the actual records, and are consistent with those of the fuzzy sets evaluation method. Meanwhile, the unascertained superiority degree of rock mass blastability of samples S1-$6 which can be calculated by scoring criteria are 3.428 5, 3.453 3, 4.058 7, 3.675 9, 3.516 7 and 3.289 7, respectively. Furthermore, the proposed method can take into account large amount of uncertain information in blastability evaluation, which can provide an effective, credible and feasible way for estimating the blastability of rock mass. Engineering practices show that it can complete the blastability assessment systematically and scientifically without any assumption by the proposed model, which can be applied to practical engineering.
基金supported partially by China's National 863 Program under Grant No.2009AA01Z207
文摘To improve spectrum utilization and minimize interference to Primary User (PU), an adaptive spectrum decision method is proposed for Secondary User (SU), while taking traffic load balancing and spectrum heterogeneity into consideration. Long-term statistics and current sensing results are integrated into the proposed decision method of spectrum access. Two decision methods, namely probability based and sensing based, are presented, compared and followed by performance analysis in terms of delay. For probability based spectrum decision, Short-Time-Job-First (STJF) priority queuing discipline is employed to minimize average residual time and theoretical conclusion is derived in a novel way. For sensing based decision we treat the interrupted service of SU as newly incoming and re-decision process is initialized to find available spectrum in a First-Available-First-Access (FAFA) fashion. Effect of sensing error in PHY layer is also analyzed in terms of extended average residual time. Simulation results show that, for relatively low arriving rate of SU traffic, the proposed spectrum decision method yields at least a delay reduction of 39.5% compared with non-adaptive method. The proposed spectrum decision can significantly improve delay performance even facing sensing errors, which cause performance degeneration to both PU and SU.
文摘A suite of elements(Ag,Au,Ba,Bi,Cd,Co,Cr,Cu,Ga,Hf,Hg,Mn,Mo,Ni,Pb,Rb,Sb,Se, Sr,Te and Zn),total organic carbon(TOC)and pH were analyzed in stream sediment and tailing samples from Um Shashoba area,in order to evaluate Au placer and the sediments being impacted by old mining activities.Analytical results were examined using statistical,graphical and mapping methods.In spite of the results revealing that Au and most of the elements in sediments were in general significantly lower than those in tailing,Au was concentrated in the NE and SW parts forming Au placer.It is remarkably a close association of Au with Hg and Sb;both are useful as pathfinder elements for Au placers.Values of pH could not control a fate of analyzed elements,whereas TOC and Mn oxides and hydroxides could uptake some elements Au,Ba,Co,Cr,Hg,Ni,and Sr.The results also indicated that the sediments were contaminated by anthropogenic factors causing moderate,strong to very strong pollution with respect to Bi,Se and Te,respectively.Additionally,geogenic factors could also contribute elemental enrichment to the drainage system and cause significant toxicity level.