The National Wind Power Integration Research and Test Center was put into operation with the approval of NEA on January 6.Q/GDW 432-2010,Specifications for wind power dispatching management,was released by SGCC in Feb...The National Wind Power Integration Research and Test Center was put into operation with the approval of NEA on January 6.Q/GDW 432-2010,Specifications for wind power dispatching management,was released by SGCC in February.China’s first offshore wind farm with total installed capacity of 102 MW,Shanghai Donghai Bridge Wind farm,was completed in June.1.展开更多
文摘The National Wind Power Integration Research and Test Center was put into operation with the approval of NEA on January 6.Q/GDW 432-2010,Specifications for wind power dispatching management,was released by SGCC in February.China’s first offshore wind farm with total installed capacity of 102 MW,Shanghai Donghai Bridge Wind farm,was completed in June.1.