为了进一步降低电容器组及其投切开关的合闸涌流与过电压,介绍了一种改进的SF_6断路器合闸动态击穿特性(预击穿特性)测量方法,并根据合闸动态击穿特性与合闸时间的分布范围,制订了选相合闸策略。研制了1套最高输出电压400 k V的击穿...为了进一步降低电容器组及其投切开关的合闸涌流与过电压,介绍了一种改进的SF_6断路器合闸动态击穿特性(预击穿特性)测量方法,并根据合闸动态击穿特性与合闸时间的分布范围,制订了选相合闸策略。研制了1套最高输出电压400 k V的击穿特性测量装置,在1次合-分闸操作中可同时获得断路器在合闸与分闸操作过程中触头间隙的动态击穿特性;对1台126 k V SF_6断路器进行了试验研究,成功获得了该断路器的合闸动态击穿特性;根据该断路器的合闸动态击穿特性与合闸时间的分散性,制定了相应的选相控制策略;理论分析证明考虑断路器特性以后,最大预击穿电压下降了0.015 8-0.336 2(标幺值),合闸时刻的分布范围降低了0.02-0.35 ms;试验结果表明,该控制方案满足设计要求。展开更多
Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution network...Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution networks for reactive power compensation also have the capacity to minimize the real and reactive power losses occurred in the system. Hence, this research integrates the allocation of renewable energy DG and capacitor banks in the radial distribution network to minimize the real power loss occurred in the system. A two-stage methodology is used for simultaneous allocation of renewable DG and capacitor banks. The optimum location of renewable energy DG and capacitor banks is determined using the distributed generation sitting index (DGSI) ranking method and the optimum sizing of DG and capacitor banks is found out for simultaneous placement using weight improved particle swarm optimization algorithm (WIPSO) and self adaptive differential evolution algorithm (SADE). This two-stage methodology reduces the burden of SADE and WIPSO algorithm, by using the DGSI index in determining the optimal location. Hence the computational time gets reduced which makes them suitable for online applications. By using the above methodology, a comprehensive performance analysis is done on IEEE 33 bus and 69 bus RDNs and the results are discussed in detail.展开更多
With the development of power systems,a large number of shunt capacitors are used to improve power quality in the distribution network.The shunt capacitor banks are operated much frequently,as a result,the capacitor b...With the development of power systems,a large number of shunt capacitors are used to improve power quality in the distribution network.The shunt capacitor banks are operated much frequently,as a result,the capacitor banks will bear large numbers of over-voltage inevitably.If the over-voltage exceeds certain amplitude,the capacitor will be damaged.This paper aims at the capacitor banks in the 35 kV side of Shanghai Xu-xing 500 kV substation,and applies ATP-EMTP to simulate the over-voltages generated by operating the switches under different angles of the source.Finally,according to the results of simulation and theoretical analysis,a best choice(i.e.angles of the source) to switch on capacitor banks is proposed.In this case the over-voltage on the capacitor will be limited to lowest.展开更多
The main purpose of the electrical power system is to transport and distribute energy generated by the central power plants in a safe and reliable manner to the customer premises. Most of the electrical equipment is e...The main purpose of the electrical power system is to transport and distribute energy generated by the central power plants in a safe and reliable manner to the customer premises. Most of the electrical equipment is exposed within the open which suggests they can be vulnerable to lightning strikes, road dwindling, windstorms, and a few engineering activities with the potential of causing different degrees of damage to the electrical equipment. One of the ways to guard the equipment is to deploy switching devices. However, the operations of most of these switching devices produce oscillatory transient in the electrical transmission and distribution systems which result in voltage, current, and frequency fluctuations in the load. This paper investigates the effect of switching devices on power quality and proposes a positive sequence voltage power transient suppression technique that can spontaneously improve the distorted voltage at the instant of capacitor switching using the capacitor line model as a case study. MATLAB/Simulink software was utilized for the analysis on an electrical network model with bus voltages of 69 kV/12.47 kV and 480 V. The results showed that, during switching operations, the positive sequence voltage power detector block produces ripple-free accurate results.展开更多
文摘为了进一步降低电容器组及其投切开关的合闸涌流与过电压,介绍了一种改进的SF_6断路器合闸动态击穿特性(预击穿特性)测量方法,并根据合闸动态击穿特性与合闸时间的分布范围,制订了选相合闸策略。研制了1套最高输出电压400 k V的击穿特性测量装置,在1次合-分闸操作中可同时获得断路器在合闸与分闸操作过程中触头间隙的动态击穿特性;对1台126 k V SF_6断路器进行了试验研究,成功获得了该断路器的合闸动态击穿特性;根据该断路器的合闸动态击穿特性与合闸时间的分散性,制定了相应的选相控制策略;理论分析证明考虑断路器特性以后,最大预击穿电压下降了0.015 8-0.336 2(标幺值),合闸时刻的分布范围降低了0.02-0.35 ms;试验结果表明,该控制方案满足设计要求。
文摘Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution networks for reactive power compensation also have the capacity to minimize the real and reactive power losses occurred in the system. Hence, this research integrates the allocation of renewable energy DG and capacitor banks in the radial distribution network to minimize the real power loss occurred in the system. A two-stage methodology is used for simultaneous allocation of renewable DG and capacitor banks. The optimum location of renewable energy DG and capacitor banks is determined using the distributed generation sitting index (DGSI) ranking method and the optimum sizing of DG and capacitor banks is found out for simultaneous placement using weight improved particle swarm optimization algorithm (WIPSO) and self adaptive differential evolution algorithm (SADE). This two-stage methodology reduces the burden of SADE and WIPSO algorithm, by using the DGSI index in determining the optimal location. Hence the computational time gets reduced which makes them suitable for online applications. By using the above methodology, a comprehensive performance analysis is done on IEEE 33 bus and 69 bus RDNs and the results are discussed in detail.
基金supported of the Fundamental Research Founds for the Central Universities
文摘With the development of power systems,a large number of shunt capacitors are used to improve power quality in the distribution network.The shunt capacitor banks are operated much frequently,as a result,the capacitor banks will bear large numbers of over-voltage inevitably.If the over-voltage exceeds certain amplitude,the capacitor will be damaged.This paper aims at the capacitor banks in the 35 kV side of Shanghai Xu-xing 500 kV substation,and applies ATP-EMTP to simulate the over-voltages generated by operating the switches under different angles of the source.Finally,according to the results of simulation and theoretical analysis,a best choice(i.e.angles of the source) to switch on capacitor banks is proposed.In this case the over-voltage on the capacitor will be limited to lowest.
文摘The main purpose of the electrical power system is to transport and distribute energy generated by the central power plants in a safe and reliable manner to the customer premises. Most of the electrical equipment is exposed within the open which suggests they can be vulnerable to lightning strikes, road dwindling, windstorms, and a few engineering activities with the potential of causing different degrees of damage to the electrical equipment. One of the ways to guard the equipment is to deploy switching devices. However, the operations of most of these switching devices produce oscillatory transient in the electrical transmission and distribution systems which result in voltage, current, and frequency fluctuations in the load. This paper investigates the effect of switching devices on power quality and proposes a positive sequence voltage power transient suppression technique that can spontaneously improve the distorted voltage at the instant of capacitor switching using the capacitor line model as a case study. MATLAB/Simulink software was utilized for the analysis on an electrical network model with bus voltages of 69 kV/12.47 kV and 480 V. The results showed that, during switching operations, the positive sequence voltage power detector block produces ripple-free accurate results.