The Preissmann implicit scheme was used to discretize the one-dimensional Saint-Venant equations, the river-junction-fiver method was applied to resolve the hydrodynamic and water quality model for river networks, and...The Preissmann implicit scheme was used to discretize the one-dimensional Saint-Venant equations, the river-junction-fiver method was applied to resolve the hydrodynamic and water quality model for river networks, and the key issues on the model were expatiated particularly in this article. This water quality module was designed to compute time dependent concentrations of a series of constituents, which are primarily governed by the processes of advection, dispersion and chemical reactions. Based on the theory of Water Quality Analysis Simulation Program (WASP) water quality model, emphasis was given to the simulation of the biogeochemical transformations that determine the fate of nutrients, in particular, the simulation of the aquatic cycles of nitrogen and phosphorus compounds. This model also includes procedures for the determination of growth and death of phytoplankton. This hydrodynamic and water quality model was applied to calculate two river networks. As illustrated by the numerical examples, the calculated water level and discharge agree with the measured data and the simulated trends and magnitudes of water quality constituents are generally in good agreement with field observations. It is concluded that the presented model is useful in the pollutant control and in the determination of pollutant-related problems for river networks.展开更多
The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in ...The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in both design theory and construction technology. This paper systematically summarizes the tech- nical characteristics and main problems of the large-section loess tunnels on China's high-speed railway, including classification of the surrounding rock, design of the supporting structure, surface settlement and cracking control, and safe and rapid construction methods. On this basis, the key construction tech- niques of loess tunnels with large sections for high-speed railway are expounded from the aspects of design and construction. The research results show that the classification of loess strata surrounding large tunnels should be based on the geological age of the loess, and be determined by combining the plastic index and the water content. In addition, the influence of the buried depth should be considered. During tunnel excavation disturbance, if the tensile stress exceeds the soil tensile or shear strength, the surface part of the sliding trend plane can be damaged, and visible cracks can form. The pressure of the surrounding rock of a large-section loess tunnel should be calculated according to the buried depth, using the corresponding formula. A three-bench seven-step excavation method of construction was used as the core technology system to ensure the safe and rapid construction of a large-section loess tunnel, following a field test to optimize the construction parameters and determine the engineering measures to stabilize the tunnel face. The conclusions and methods presented here are of great significance in revealing the strata and supporting mechanics of large-section loess tunnels, and in optimizing the supporting structure design and the technical parameters for construction.展开更多
基金Project supported by the National Natural Science Foundation of China (Grant No.50839001)the National Basic Research Program of China (973 Program, Grant No. 2005CB724202).
文摘The Preissmann implicit scheme was used to discretize the one-dimensional Saint-Venant equations, the river-junction-fiver method was applied to resolve the hydrodynamic and water quality model for river networks, and the key issues on the model were expatiated particularly in this article. This water quality module was designed to compute time dependent concentrations of a series of constituents, which are primarily governed by the processes of advection, dispersion and chemical reactions. Based on the theory of Water Quality Analysis Simulation Program (WASP) water quality model, emphasis was given to the simulation of the biogeochemical transformations that determine the fate of nutrients, in particular, the simulation of the aquatic cycles of nitrogen and phosphorus compounds. This model also includes procedures for the determination of growth and death of phytoplankton. This hydrodynamic and water quality model was applied to calculate two river networks. As illustrated by the numerical examples, the calculated water level and discharge agree with the measured data and the simulated trends and magnitudes of water quality constituents are generally in good agreement with field observations. It is concluded that the presented model is useful in the pollutant control and in the determination of pollutant-related problems for river networks.
文摘The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in both design theory and construction technology. This paper systematically summarizes the tech- nical characteristics and main problems of the large-section loess tunnels on China's high-speed railway, including classification of the surrounding rock, design of the supporting structure, surface settlement and cracking control, and safe and rapid construction methods. On this basis, the key construction tech- niques of loess tunnels with large sections for high-speed railway are expounded from the aspects of design and construction. The research results show that the classification of loess strata surrounding large tunnels should be based on the geological age of the loess, and be determined by combining the plastic index and the water content. In addition, the influence of the buried depth should be considered. During tunnel excavation disturbance, if the tensile stress exceeds the soil tensile or shear strength, the surface part of the sliding trend plane can be damaged, and visible cracks can form. The pressure of the surrounding rock of a large-section loess tunnel should be calculated according to the buried depth, using the corresponding formula. A three-bench seven-step excavation method of construction was used as the core technology system to ensure the safe and rapid construction of a large-section loess tunnel, following a field test to optimize the construction parameters and determine the engineering measures to stabilize the tunnel face. The conclusions and methods presented here are of great significance in revealing the strata and supporting mechanics of large-section loess tunnels, and in optimizing the supporting structure design and the technical parameters for construction.