Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de...Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.展开更多
With the increase of span length, the bridge tends to be more flexible, and the wind stability be- comes an important problem for the design and construction of super long-span cable-stayed bridges. By taking a super ...With the increase of span length, the bridge tends to be more flexible, and the wind stability be- comes an important problem for the design and construction of super long-span cable-stayed bridges. By taking a super long-span cable-stayed bridge with a main span of 1 400 m as example, the aerostatic and aerodynamic stability of the bridge are investigated by three-dimensional nonlinear aerostatic and aerodynamic stability analy- sis, and the results are compared with those of a suspension bridge with a main span of 1 385 m, and from the aspect of wind stability, the feasibility of using cable-stayed bridge in super long-span bridge with a main span above l 000 m is discussed. In addition, the influences of design parameters including the depth and width of the girder, the tower structure, the tower height-to-span ratio, the side-to-main span ratio, the auxiliary piers in the side span and the anchorage system of stay cables, etc on the aerostatic and aerodynamic stability of su- per long-span cable-stayed bridges are investigated numerically; the key design parameters are pointed out, and also their reasonable values are proposed.展开更多
文摘Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.
文摘With the increase of span length, the bridge tends to be more flexible, and the wind stability be- comes an important problem for the design and construction of super long-span cable-stayed bridges. By taking a super long-span cable-stayed bridge with a main span of 1 400 m as example, the aerostatic and aerodynamic stability of the bridge are investigated by three-dimensional nonlinear aerostatic and aerodynamic stability analy- sis, and the results are compared with those of a suspension bridge with a main span of 1 385 m, and from the aspect of wind stability, the feasibility of using cable-stayed bridge in super long-span bridge with a main span above l 000 m is discussed. In addition, the influences of design parameters including the depth and width of the girder, the tower structure, the tower height-to-span ratio, the side-to-main span ratio, the auxiliary piers in the side span and the anchorage system of stay cables, etc on the aerostatic and aerodynamic stability of su- per long-span cable-stayed bridges are investigated numerically; the key design parameters are pointed out, and also their reasonable values are proposed.