The present water pollution situation at watershed level in China has been systematically analyzed.The causes of water pollution are attributed to the extensive economic developmental pattern,poor wastewater treatment...The present water pollution situation at watershed level in China has been systematically analyzed.The causes of water pollution are attributed to the extensive economic developmental pattern,poor wastewater treatment,and a lack of nonpoint pollution control.The problems of water pollution control at watershed level include a lack of thought and approach,developmental delay in the environmental standard system,an inadequate monitoring ability,and an inefficient implementation of laws and regulations.From 2006 to 2020,water pollution control and governance will be a national key specific project of science and technology in China.The strategies of this project include establishing a water pollution control system at watershed level,orienting a healthy aquatic ecosystem,conducting risk management,and using comprehensive methods.The goal is to establish and complete a technological system of pollution control and management in three five-year phases.The main tasks are to develop common technologies,management systems,and mechanisms for lake eutrophication control,river pollution control,urban water environmental pollution control,potable water safety,and water environmental management.The bottlenecks of water pollution control and management in China could be systematically removed,and the demonstration of the system engineering approach will be conducted at selected key watersheds.展开更多
Three-dimensional seepage in double fractured media was modeled in this paper. The determination of hydraulic conductivity tensor of rock mass is a vital problem for the sea water intrusion or sea water encroachment a...Three-dimensional seepage in double fractured media was modeled in this paper. The determination of hydraulic conductivity tensor of rock mass is a vital problem for the sea water intrusion or sea water encroachment and seepage of fissured medium. According to the geological and hydrogeological conditions for the 2nd-stage construction of the Three Gorges Project (TGP), the physical and mathematical models for the groundwater movement through the 3D double fractured media of rock mass during construction were established in this paper. Based on discontinuity-control inverse theory, some related parameters of double fractured media were inversed with flux being the known quantity and calibration of water table the objective function. Synchronously, the seepage field of the construction region was systematically analyzed and simulated, the results of which exhibit that the double fractured media model of fracture water can comprehensively and correctly describe the geological and hydrogeological conditions in the construction region.展开更多
基金the project of the National Key Specific Project of Science and Technology of China for“Water Pollution Control and Governance,”“Functional zoning of river basin water ecology and water quality target oriented management technology”(Grant No.2008ZX07526).
文摘The present water pollution situation at watershed level in China has been systematically analyzed.The causes of water pollution are attributed to the extensive economic developmental pattern,poor wastewater treatment,and a lack of nonpoint pollution control.The problems of water pollution control at watershed level include a lack of thought and approach,developmental delay in the environmental standard system,an inadequate monitoring ability,and an inefficient implementation of laws and regulations.From 2006 to 2020,water pollution control and governance will be a national key specific project of science and technology in China.The strategies of this project include establishing a water pollution control system at watershed level,orienting a healthy aquatic ecosystem,conducting risk management,and using comprehensive methods.The goal is to establish and complete a technological system of pollution control and management in three five-year phases.The main tasks are to develop common technologies,management systems,and mechanisms for lake eutrophication control,river pollution control,urban water environmental pollution control,potable water safety,and water environmental management.The bottlenecks of water pollution control and management in China could be systematically removed,and the demonstration of the system engineering approach will be conducted at selected key watersheds.
基金the National Natural Science Foundation of China (Grant Nos: 50179010 and 50239070)
文摘Three-dimensional seepage in double fractured media was modeled in this paper. The determination of hydraulic conductivity tensor of rock mass is a vital problem for the sea water intrusion or sea water encroachment and seepage of fissured medium. According to the geological and hydrogeological conditions for the 2nd-stage construction of the Three Gorges Project (TGP), the physical and mathematical models for the groundwater movement through the 3D double fractured media of rock mass during construction were established in this paper. Based on discontinuity-control inverse theory, some related parameters of double fractured media were inversed with flux being the known quantity and calibration of water table the objective function. Synchronously, the seepage field of the construction region was systematically analyzed and simulated, the results of which exhibit that the double fractured media model of fracture water can comprehensively and correctly describe the geological and hydrogeological conditions in the construction region.