In the paper, the author addresses the Lyapunov characteristic spectrum of an ergodic autonomous ordinary differential system on a complete riemannian manifold of finite dimension such as the d-dimensional euclidean s...In the paper, the author addresses the Lyapunov characteristic spectrum of an ergodic autonomous ordinary differential system on a complete riemannian manifold of finite dimension such as the d-dimensional euclidean space ? d , not necessarily compact, by Liaowise spectral theorems that give integral expressions of Lyapunov exponents. In the context of smooth linear skew-product flows with Polish driving systems, the results are still valid. This paper seems to be an interesting contribution to the stability theory of ordinary differential systems with non-compact phase spaces.展开更多
Purpose–The smoothness of the high-speed railway(HSR)on the bridge may exceed the allowable standard when an earthquake causes vibrations for HSR bridges,which may threaten the safety of running trains.Indeed,few stu...Purpose–The smoothness of the high-speed railway(HSR)on the bridge may exceed the allowable standard when an earthquake causes vibrations for HSR bridges,which may threaten the safety of running trains.Indeed,few studies have evaluated the exceeding probability of rail displacement exceeding the allowable standard.The purposes of this article are to provide a method for investigating the exceeding probability of the rail displacement of HSRs under seismic excitation and to calculate the exceeding probability.Design/methodology/approach–In order to investigate the exceeding probability of the rail displacement under different seismic excitations,the workflow of analyzing the smoothness of the rail based on incremental dynamic analysis(IDA)is proposed,and the intensity measure and limit state for the exceeding probability analysis of HSRs are defined.Then a finite element model(FEM)of an assumed HSR track-bridge system is constructed,which comprises a five-span simply-supported girder bridge supporting a finite length CRTS II ballastless track.Under different seismic excitations,the seismic displacement response of the rail is calculated;the character of the rail displacement is analyzed;and the exceeding probability of the rail vertical displacement exceeding the allowable standard(2mm)is investigated.Findings–The results show that:(1)The bridge-abutment joint position may form a step-like under seismic excitation,threatening the running safety of high-speed trains under seismic excitations,and the rail displacements at mid-span positions are bigger than that at other positions on the bridge.(2)The exceeding probability of rail displacement is up to about 44%when PGA 50.01g,which is the level-five risk probability and can be described as’very likely to happen’.(3)The exceeding probability of the rail at the mid-span positions is bigger than that above other positions of the bridge,and the mid-span positions of the track-bridge system above the bridge may be the most hazardous area for the running safety 展开更多
文摘目的 比较Monaco计划系统4种通量平滑度对食管癌放疗计划的影响。方法 选取我院23例食管癌患者为研究对象,按照计划靶区50 Gy/25次的处方剂量,分别使用4种通量平滑模式(Off、Low、Medium和High)设计4组放疗计划,将处方剂量归一至95%的靶区体积后,统计各评价指标,并使用基于等效均匀剂量的参数化正常组织并发症概率(Normal Tissue Complication Probability,NTCP)模型进行评估。使用SPSS 27.0软件进行单因素方差分析,比较各组之间的差异,并使用优劣解距离法(Technique for Order Preference by Similarity to Ideal Solution,TOPSIS)进行综合评估。结果 4组计划在靶区剂量(D_(98)、D_(2)、D_(mean)、适形度指数、均匀性指数)、危及器官剂量(双肺V_(30)、V_(20)、V_(10)、V_(5)、D_(mean)、NTCP;心脏V30、Dmean、NTCP;脊髓Dmax)以及计划执行时间和计划总控制点数目方面差异均无统计学意义(P>0.05),在治疗机器跳数(Monitor Units,MU)方面差异显著(P<0.05),且随着通量平滑程度增加,MU呈降低趋势。TOPSIS综合分析结果显示LOW组综合评分最高。结论 在食管癌放疗计划设计中,4种通量平滑模式均能满足临床治疗要求,通量平滑度的提高可降低治疗MU;考虑计划整体指标的情况下,可选择Low模式达到最优的剂量结果。
基金supported by the National Natural Science Foundation of China (Grant No. 10671088)the Major State Basic Research Development Program of China (Grant No. 2006CB805903)
文摘In the paper, the author addresses the Lyapunov characteristic spectrum of an ergodic autonomous ordinary differential system on a complete riemannian manifold of finite dimension such as the d-dimensional euclidean space ? d , not necessarily compact, by Liaowise spectral theorems that give integral expressions of Lyapunov exponents. In the context of smooth linear skew-product flows with Polish driving systems, the results are still valid. This paper seems to be an interesting contribution to the stability theory of ordinary differential systems with non-compact phase spaces.
基金supported by National Key Research and Development Plan of China“Basic Theory and Methods for Resilience Assessment and Risk Control of Transportation Infrastructures”(2021YFB2600500)the National Nature Science Foundation of Si Chuan(2023NSFSC0388)the Joint Research Fund for Earthquake Science launched by the National Natural Science Foundation of China and China Earthquake Administration(U2039208).
文摘Purpose–The smoothness of the high-speed railway(HSR)on the bridge may exceed the allowable standard when an earthquake causes vibrations for HSR bridges,which may threaten the safety of running trains.Indeed,few studies have evaluated the exceeding probability of rail displacement exceeding the allowable standard.The purposes of this article are to provide a method for investigating the exceeding probability of the rail displacement of HSRs under seismic excitation and to calculate the exceeding probability.Design/methodology/approach–In order to investigate the exceeding probability of the rail displacement under different seismic excitations,the workflow of analyzing the smoothness of the rail based on incremental dynamic analysis(IDA)is proposed,and the intensity measure and limit state for the exceeding probability analysis of HSRs are defined.Then a finite element model(FEM)of an assumed HSR track-bridge system is constructed,which comprises a five-span simply-supported girder bridge supporting a finite length CRTS II ballastless track.Under different seismic excitations,the seismic displacement response of the rail is calculated;the character of the rail displacement is analyzed;and the exceeding probability of the rail vertical displacement exceeding the allowable standard(2mm)is investigated.Findings–The results show that:(1)The bridge-abutment joint position may form a step-like under seismic excitation,threatening the running safety of high-speed trains under seismic excitations,and the rail displacements at mid-span positions are bigger than that at other positions on the bridge.(2)The exceeding probability of rail displacement is up to about 44%when PGA 50.01g,which is the level-five risk probability and can be described as’very likely to happen’.(3)The exceeding probability of the rail at the mid-span positions is bigger than that above other positions of the bridge,and the mid-span positions of the track-bridge system above the bridge may be the most hazardous area for the running safety