Generally, the procedure for Solving Security constrained unit commitment (SCUC) problems within Lagrangian Relaxation framework is partitioned into two stages: one is to obtain feasible SCUC states;the other is to so...Generally, the procedure for Solving Security constrained unit commitment (SCUC) problems within Lagrangian Relaxation framework is partitioned into two stages: one is to obtain feasible SCUC states;the other is to solve the economic dispatch of generation power among all the generating units. The core of the two stages is how to determine the feasibility of SCUC states. The existence of ramp rate constraints and security constraints increases the difficulty of obtaining an analytical necessary and sufficient condition for determining the quasi-feasibility of SCUC states at each scheduling time. However, a numerical necessary and sufficient numerical condition is proposed and proven rigorously based on Benders Decomposition Theorem. Testing numerical example shows the effectiveness and efficiency of the condition.展开更多
为探讨不同可再生能源渗透情形下的电网投资、再调度与可再生能源(renewable energy source,RES)削减需求,提出一种连续的电力市场、网络模拟方法。市场模拟代表电力交易日前市场每小时的市场清算过程,网络仿真代表了输电系统在确定常...为探讨不同可再生能源渗透情形下的电网投资、再调度与可再生能源(renewable energy source,RES)削减需求,提出一种连续的电力市场、网络模拟方法。市场模拟代表电力交易日前市场每小时的市场清算过程,网络仿真代表了输电系统在确定常规电厂的最优再调度命令和RES的削减命令时所起的作用。通过市场模拟和网络模拟分别迭代计算成本效益和输电网投资需求。此外,利用Benders分解技术和增广拉格朗日松弛法求解目标年的优化问题。最终通过算例分析验证所提方法的有效性。展开更多
The increasing integration of variable wind generation has aggravated the imbalance between electricity supply and demand. Power-to-hydrogen(P2H) is a promising solution to balance supply and demand in a variable powe...The increasing integration of variable wind generation has aggravated the imbalance between electricity supply and demand. Power-to-hydrogen(P2H) is a promising solution to balance supply and demand in a variable power grid, in which excess wind power is converted into hydrogen via electrolysis and stored for later use. In this study, an energy hub(EH) with both a P2H facility(electrolyzer) and a gas-to-power(G2P) facility(hydrogen gas turbine) is proposed to accommodate a high penetration of wind power. The EH is modeled and integrated into a security-constrained unit commitment(SCUC) problem, and this optimization problem is solved by a mixed-integer linear programming(MILP) method with the Benders decomposition technique. Case studies are presented to validate the proposed model and elaborate on the technological potential of integrating P2H into a power system with a high level of wind penetration(HWP).展开更多
安全约束机组组合(Security-constrained Unit Commitment,SCUC)问题作为制定发电计划的核心环节,在电力系统优化调度等方面具有十分重要的意义。针对考虑故障态约束后SCUC问题规模庞大、难以求解的情况,提出了一种基于辅助优化问题的...安全约束机组组合(Security-constrained Unit Commitment,SCUC)问题作为制定发电计划的核心环节,在电力系统优化调度等方面具有十分重要的意义。针对考虑故障态约束后SCUC问题规模庞大、难以求解的情况,提出了一种基于辅助优化问题的故障态安全约束削减方法。首先引入与具体故障态安全约束相关的辅助优化问题,从而建立判别相应故障态安全约束是否冗余的充分必要条件。然后探究冗余故障态安全约束辨识过程的具体加速方法,包括松弛辅助优化问题方法,使用可行性判据进行故障态安全约束预分类方法,以及多线程并行计算方法。最后,在IEEE118测试系统上对所提方法的正确性和有效性进行了仿真验证。展开更多
The rapid development of economy and society stimulates the increase of power demand. Wind power has received great attention as a typical renewable energy, and the share of wind power is continually increasing in rec...The rapid development of economy and society stimulates the increase of power demand. Wind power has received great attention as a typical renewable energy, and the share of wind power is continually increasing in recent years.However, the high integration of wind power brings challenges to the secure and reliable operation of power grid due to the intermittent characteristic of wind power. In order to solve the operation risk caused by wind power uncertainty, this paper proposes to solve the problem of stochastic security-constrained unit commitment(SCUC) by considering the extreme scenarios of wind power output. Firstly, assuming that the probability density distribution of wind power approximately follows a normal distribution, a great number of scenarios are generated by Monte Carlo(MC) simulation method to capture the stochastic nature of wind power output. Then, the clustering by fast search and find of density peaks(CSFDP) is utilized to separate the generated scenarios into three types: extreme, normal and typical scenarios. The extreme scenarios are identified to determine the on/off statuses of generators, while the typical scenarios are used to solve the day-ahead security-constrained economic dispatch(SCED) problem. The advantage of the proposed method is to ensure the robustness of SCUC solution while reducing the conservativeness of the solution as much as possible.The effectiveness of the proposed method is verified by IEEE test systems.展开更多
随着电网规模的持续扩大,市场环境下考虑网络安全约束的机组组合(security-constrained unit commitment,SCUC)模型中的变量和约束显著增加,模型的求解性能变差。当模型规模过大时,会出现现有的商用求解器无法求解的状况,造成大规模模...随着电网规模的持续扩大,市场环境下考虑网络安全约束的机组组合(security-constrained unit commitment,SCUC)模型中的变量和约束显著增加,模型的求解性能变差。当模型规模过大时,会出现现有的商用求解器无法求解的状况,造成大规模模型求解困难的问题。为实现大规模机组组合模型的快速求解,从减少模型约束数量的角度出发,提出了一种基于边界法的线性约束简化方法。通过边界法剔除模型中冗余的线性约束,可以有效降低模型规模,实现模型的快速求解。基于IEEE-39、WECC 179和IEEE-118算例,在市场环境下进行日前SCUC测试。通过对比简化前后的求解时间,表明该方法能够显著提高模型的求解速率。展开更多
文摘Generally, the procedure for Solving Security constrained unit commitment (SCUC) problems within Lagrangian Relaxation framework is partitioned into two stages: one is to obtain feasible SCUC states;the other is to solve the economic dispatch of generation power among all the generating units. The core of the two stages is how to determine the feasibility of SCUC states. The existence of ramp rate constraints and security constraints increases the difficulty of obtaining an analytical necessary and sufficient condition for determining the quasi-feasibility of SCUC states at each scheduling time. However, a numerical necessary and sufficient numerical condition is proposed and proven rigorously based on Benders Decomposition Theorem. Testing numerical example shows the effectiveness and efficiency of the condition.
文摘为探讨不同可再生能源渗透情形下的电网投资、再调度与可再生能源(renewable energy source,RES)削减需求,提出一种连续的电力市场、网络模拟方法。市场模拟代表电力交易日前市场每小时的市场清算过程,网络仿真代表了输电系统在确定常规电厂的最优再调度命令和RES的削减命令时所起的作用。通过市场模拟和网络模拟分别迭代计算成本效益和输电网投资需求。此外,利用Benders分解技术和增广拉格朗日松弛法求解目标年的优化问题。最终通过算例分析验证所提方法的有效性。
基金supported by National Natural Science Foundation of China(No.51377035)NSFC-RCUK_EPSRC(No.51361130153)
文摘The increasing integration of variable wind generation has aggravated the imbalance between electricity supply and demand. Power-to-hydrogen(P2H) is a promising solution to balance supply and demand in a variable power grid, in which excess wind power is converted into hydrogen via electrolysis and stored for later use. In this study, an energy hub(EH) with both a P2H facility(electrolyzer) and a gas-to-power(G2P) facility(hydrogen gas turbine) is proposed to accommodate a high penetration of wind power. The EH is modeled and integrated into a security-constrained unit commitment(SCUC) problem, and this optimization problem is solved by a mixed-integer linear programming(MILP) method with the Benders decomposition technique. Case studies are presented to validate the proposed model and elaborate on the technological potential of integrating P2H into a power system with a high level of wind penetration(HWP).
文摘安全约束机组组合(Security-constrained Unit Commitment,SCUC)问题作为制定发电计划的核心环节,在电力系统优化调度等方面具有十分重要的意义。针对考虑故障态约束后SCUC问题规模庞大、难以求解的情况,提出了一种基于辅助优化问题的故障态安全约束削减方法。首先引入与具体故障态安全约束相关的辅助优化问题,从而建立判别相应故障态安全约束是否冗余的充分必要条件。然后探究冗余故障态安全约束辨识过程的具体加速方法,包括松弛辅助优化问题方法,使用可行性判据进行故障态安全约束预分类方法,以及多线程并行计算方法。最后,在IEEE118测试系统上对所提方法的正确性和有效性进行了仿真验证。
基金supported by the National Key R&D Program of China “Technology and application of wind power/photovoltaic power prediction for promoting renewable energy consumption”(No.2018YFB0904200)eponymous Complement S&T Program of State Grid Corporation of China (No.SGLNDKOOKJJS1800266)。
文摘The rapid development of economy and society stimulates the increase of power demand. Wind power has received great attention as a typical renewable energy, and the share of wind power is continually increasing in recent years.However, the high integration of wind power brings challenges to the secure and reliable operation of power grid due to the intermittent characteristic of wind power. In order to solve the operation risk caused by wind power uncertainty, this paper proposes to solve the problem of stochastic security-constrained unit commitment(SCUC) by considering the extreme scenarios of wind power output. Firstly, assuming that the probability density distribution of wind power approximately follows a normal distribution, a great number of scenarios are generated by Monte Carlo(MC) simulation method to capture the stochastic nature of wind power output. Then, the clustering by fast search and find of density peaks(CSFDP) is utilized to separate the generated scenarios into three types: extreme, normal and typical scenarios. The extreme scenarios are identified to determine the on/off statuses of generators, while the typical scenarios are used to solve the day-ahead security-constrained economic dispatch(SCED) problem. The advantage of the proposed method is to ensure the robustness of SCUC solution while reducing the conservativeness of the solution as much as possible.The effectiveness of the proposed method is verified by IEEE test systems.
文摘随着电网规模的持续扩大,市场环境下考虑网络安全约束的机组组合(security-constrained unit commitment,SCUC)模型中的变量和约束显著增加,模型的求解性能变差。当模型规模过大时,会出现现有的商用求解器无法求解的状况,造成大规模模型求解困难的问题。为实现大规模机组组合模型的快速求解,从减少模型约束数量的角度出发,提出了一种基于边界法的线性约束简化方法。通过边界法剔除模型中冗余的线性约束,可以有效降低模型规模,实现模型的快速求解。基于IEEE-39、WECC 179和IEEE-118算例,在市场环境下进行日前SCUC测试。通过对比简化前后的求解时间,表明该方法能够显著提高模型的求解速率。