In order to develop further the application of high temperature heat pipe in hypersonic vehicles thermal protection, the principles and characteristics of high temperature heat pipe used in hypersonic vehicles thermal...In order to develop further the application of high temperature heat pipe in hypersonic vehicles thermal protection, the principles and characteristics of high temperature heat pipe used in hypersonic vehicles thermal protection were introduced. The methods of numerical simulation, theory analysis and experiment research were utilized to analyze the frozen start-up and steady state characteristic of the heat pipe as well as the machining improvement for fabricating irregularly shaped heat pipe which is suitable for leading edge of hypersonic vehicles. The results indicate that the frozen start-up time of heat pipe is long (10 min) and there exists large temperature difference along the heat pipe (47 ℃/cm), but the heat pipe can reduce the temperature in stagnation area of hypersonic vehicles from 1 926 to 982 ℃ and work normally during 1 000-1 200℃. How to improve the maximum heat transfer capability and reduce the time needed for start-up from frozen state of the heat pipe by optimizing thermostructure such as designing of a novel wick with high performance is the key point in hypersonic vehicles thermal protection of heat pipe.展开更多
在老旧城区内采用定向钻进敷设地下管线,常常需要从已有的各类地下建(构)筑物或管线下方穿过,方案设计时就应考虑新建管道与之安全距离的取值问题。以厦门市某110 k V电力电缆的定向钻进工程的实际需求为出发点,在对国内现有规程规范及...在老旧城区内采用定向钻进敷设地下管线,常常需要从已有的各类地下建(构)筑物或管线下方穿过,方案设计时就应考虑新建管道与之安全距离的取值问题。以厦门市某110 k V电力电缆的定向钻进工程的实际需求为出发点,在对国内现有规程规范及工程实例调查的基础上,对电力电缆保护管定向钻进敷设安全距离取值的影响因素进行分析,优化工程定向钻进敷设方案,指导该工程的建设,并为类似工程建设提供参考。展开更多
基金Project(51076062) supported by the National Natural Science Foundation of China
文摘In order to develop further the application of high temperature heat pipe in hypersonic vehicles thermal protection, the principles and characteristics of high temperature heat pipe used in hypersonic vehicles thermal protection were introduced. The methods of numerical simulation, theory analysis and experiment research were utilized to analyze the frozen start-up and steady state characteristic of the heat pipe as well as the machining improvement for fabricating irregularly shaped heat pipe which is suitable for leading edge of hypersonic vehicles. The results indicate that the frozen start-up time of heat pipe is long (10 min) and there exists large temperature difference along the heat pipe (47 ℃/cm), but the heat pipe can reduce the temperature in stagnation area of hypersonic vehicles from 1 926 to 982 ℃ and work normally during 1 000-1 200℃. How to improve the maximum heat transfer capability and reduce the time needed for start-up from frozen state of the heat pipe by optimizing thermostructure such as designing of a novel wick with high performance is the key point in hypersonic vehicles thermal protection of heat pipe.
文摘在老旧城区内采用定向钻进敷设地下管线,常常需要从已有的各类地下建(构)筑物或管线下方穿过,方案设计时就应考虑新建管道与之安全距离的取值问题。以厦门市某110 k V电力电缆的定向钻进工程的实际需求为出发点,在对国内现有规程规范及工程实例调查的基础上,对电力电缆保护管定向钻进敷设安全距离取值的影响因素进行分析,优化工程定向钻进敷设方案,指导该工程的建设,并为类似工程建设提供参考。