针对去蜂窝(cell free,CF)大规模多输入多输出(multiple-input multiple-output,MIMO)系统中存在严重的导频污染问题,提出了一种基于位置分配的贪婪导频分配功率控制算法(greedy pilot assignment based on location with pilot power c...针对去蜂窝(cell free,CF)大规模多输入多输出(multiple-input multiple-output,MIMO)系统中存在严重的导频污染问题,提出了一种基于位置分配的贪婪导频分配功率控制算法(greedy pilot assignment based on location with pilot power control,GPABL with PPC).首先,遵循相邻用户不分配相同导频序列的原则进行贪婪导频分配(greedy pilot assignment,GPA);然后,在导频分配的基础上叠加了导频功率控制,选择合理的导频功率控制系数减小信道估计的均方误差.仿真结果表明,将两种方式结合起来进行导频优化,系统的吞吐能力有所提升.展开更多
In this paper, in order to increase system capacity and reduce the transmitting power of the user's equipment, we propose a efficient power estimation algorithm consisting of a modified open-loop power control (OL...In this paper, in order to increase system capacity and reduce the transmitting power of the user's equipment, we propose a efficient power estimation algorithm consisting of a modified open-loop power control (OLPC) and closed-loop power control (CLPC) for mobile satellite communications systems. The improved CLPC scheme, combining delay compensation algorithms and pilot diversity, is mainly applied to the ancillary ter-restrial component (ATC). ATC link in urban areas, because it is more suitable to the short round-trip delay (RTD). In the case of rural areas, where ATCs are not deployed or where a signal is not received from ATCs, transmit power monitoring equipment and OLPC schemes using efficient pilot diversity are combined and ap-plied to the link between the user's equipment and the satellite. Two modified power control schemes are ap-plied equally to the boundary areas where two kinds of signals are received in order to ensure coverage conti-nuity. Simulation results show that the improved power control scheme has good performance compared to conventional power control schemes in a geostationary earth orbit (GEO) satellite system utilizing ATCs.展开更多
This article proposes a new algorithm to improve the rate control efficiency of enhanced reverse link medium access control (RLMAC) in the code division multiple access (CDMA) 1x EV-DO release A(Rev. A) system. ...This article proposes a new algorithm to improve the rate control efficiency of enhanced reverse link medium access control (RLMAC) in the code division multiple access (CDMA) 1x EV-DO release A(Rev. A) system. The new algorithm brings reverse access terminal (AT) pilot power to the RLMAC rate control procedure and makes it easier for a low pilot power user to increase its data rate when the system is slightly loaded and harder to decrease its date rate when the system is heavily loaded. Numerical results of system level simulations show that the new algorithm can bring higher system throughput, lower AT transmission power, and lower system load.展开更多
The current planning system in China lacks coordination, which is a crucial issue to be explored to fully implement the multi-plan integration. Mianzhu is an example that is officially named as one of the pilot cities...The current planning system in China lacks coordination, which is a crucial issue to be explored to fully implement the multi-plan integration. Mianzhu is an example that is officially named as one of the pilot cities for multi-plan integration on the county level. The paper firstly analyzes the problems associated with multi-plan integration in Mianzhu, including the indeterminate hierarchy of the planning system, the disunity of technical standards, problems regarding spatial order, coordination and division of powers and functions, and the intensive utilization of spatial resources, the lack of a coordination mechanism, and low participation of experts and the public. Secondly, by learning from Germany's spatial planning, and also practical experiences of pilot cities for multi-plan integration in China, this paper creatively brings in the connotation of multi-plan integration on the county level, and further proposes a power division based on three-level planning system and three kinds of space, the reinforcement of a spatial order, intensive spatial utilization, and a planning coordination mechanism, hoping to provide reference to other cities.展开更多
文摘针对去蜂窝(cell free,CF)大规模多输入多输出(multiple-input multiple-output,MIMO)系统中存在严重的导频污染问题,提出了一种基于位置分配的贪婪导频分配功率控制算法(greedy pilot assignment based on location with pilot power control,GPABL with PPC).首先,遵循相邻用户不分配相同导频序列的原则进行贪婪导频分配(greedy pilot assignment,GPA);然后,在导频分配的基础上叠加了导频功率控制,选择合理的导频功率控制系数减小信道估计的均方误差.仿真结果表明,将两种方式结合起来进行导频优化,系统的吞吐能力有所提升.
文摘In this paper, in order to increase system capacity and reduce the transmitting power of the user's equipment, we propose a efficient power estimation algorithm consisting of a modified open-loop power control (OLPC) and closed-loop power control (CLPC) for mobile satellite communications systems. The improved CLPC scheme, combining delay compensation algorithms and pilot diversity, is mainly applied to the ancillary ter-restrial component (ATC). ATC link in urban areas, because it is more suitable to the short round-trip delay (RTD). In the case of rural areas, where ATCs are not deployed or where a signal is not received from ATCs, transmit power monitoring equipment and OLPC schemes using efficient pilot diversity are combined and ap-plied to the link between the user's equipment and the satellite. Two modified power control schemes are ap-plied equally to the boundary areas where two kinds of signals are received in order to ensure coverage conti-nuity. Simulation results show that the improved power control scheme has good performance compared to conventional power control schemes in a geostationary earth orbit (GEO) satellite system utilizing ATCs.
文摘This article proposes a new algorithm to improve the rate control efficiency of enhanced reverse link medium access control (RLMAC) in the code division multiple access (CDMA) 1x EV-DO release A(Rev. A) system. The new algorithm brings reverse access terminal (AT) pilot power to the RLMAC rate control procedure and makes it easier for a low pilot power user to increase its data rate when the system is slightly loaded and harder to decrease its date rate when the system is heavily loaded. Numerical results of system level simulations show that the new algorithm can bring higher system throughput, lower AT transmission power, and lower system load.
基金supported by the Science and Technology Projects for People of Chengdu Municipal Science and Technology Bureau(2015-HM01-00356-SF)Sichuan Tourism Development and Research Center Project(LYC15-14)Project of Resource-Based Urban Development Research Center(ZYZXYB-1506)
文摘The current planning system in China lacks coordination, which is a crucial issue to be explored to fully implement the multi-plan integration. Mianzhu is an example that is officially named as one of the pilot cities for multi-plan integration on the county level. The paper firstly analyzes the problems associated with multi-plan integration in Mianzhu, including the indeterminate hierarchy of the planning system, the disunity of technical standards, problems regarding spatial order, coordination and division of powers and functions, and the intensive utilization of spatial resources, the lack of a coordination mechanism, and low participation of experts and the public. Secondly, by learning from Germany's spatial planning, and also practical experiences of pilot cities for multi-plan integration in China, this paper creatively brings in the connotation of multi-plan integration on the county level, and further proposes a power division based on three-level planning system and three kinds of space, the reinforcement of a spatial order, intensive spatial utilization, and a planning coordination mechanism, hoping to provide reference to other cities.