我国第一套国产220kV交流输电线路的可控串联补偿装置(thyristor-controlled series compensator,TCSC)于2004年12月26日在甘肃陇南电网220kV成碧线投入运行。投运近两年来,经受了冬季低温和汛期大负荷的考验,整体运行情况良好。通过调...我国第一套国产220kV交流输电线路的可控串联补偿装置(thyristor-controlled series compensator,TCSC)于2004年12月26日在甘肃陇南电网220kV成碧线投入运行。投运近两年来,经受了冬季低温和汛期大负荷的考验,整体运行情况良好。通过调研国内外TCSC的运行情况,对成碧TCSC与其它TCSC的运行情况进行了对比,指出补充和完善国产化TCSC的运行、检修、实验技术规范的必要性。提出提高TCSC装置电磁兼容能力,建立国产化TCSC的技术标准体系,解决装设TCSC装置线路的继电保护距离I段暂态超越或保护范围太短的问题及优化TCSC与电力系统稳定器、安全自动装置等设备的协调运行问题,并积极推广TCSC技术应用的建议。展开更多
In this paper, a hybrid optimization algorithm is proposed for modeling and managing the micro grid (MG) system. The management of distributed energy sources with MG is a multi-objective problem which consists of wi...In this paper, a hybrid optimization algorithm is proposed for modeling and managing the micro grid (MG) system. The management of distributed energy sources with MG is a multi-objective problem which consists of wind turbine (WT), photovoltaic (PV) array, fuel cell (FC), micro turbine (MT) and diesel generator (DG). Because, perfect economic model of energy source of the MG units are needed to describe the operating cost of the output power generated, the objective of the hybrid model is to minimize the fuel cost of the MG sources such as FC, MT and DG. The problem formulation takes into consideration the optimal configuration of the MG at a minimum fuel cost, operation and maintenance costs as well as emissions reduction. Here, the hybrid algorithm is obtained as artificial bee colony (ABC) algorithm, which is used in two stages. The first stage of the ABC gets the optimal MG configuration at a minimum fuel cost for the required load demand. From the minimized fuel cost functions, the operation and maintenance cost as well as the emission is reduced using the second stage of the ABC. The proposed method is implemented in the Maflab/ Simulink platform and its effectiveness is analyzed by comparing with existing techniques. The comparison demonstrates the superiority of the proposed approach and confirms its potential to solve the problem.展开更多
文摘我国第一套国产220kV交流输电线路的可控串联补偿装置(thyristor-controlled series compensator,TCSC)于2004年12月26日在甘肃陇南电网220kV成碧线投入运行。投运近两年来,经受了冬季低温和汛期大负荷的考验,整体运行情况良好。通过调研国内外TCSC的运行情况,对成碧TCSC与其它TCSC的运行情况进行了对比,指出补充和完善国产化TCSC的运行、检修、实验技术规范的必要性。提出提高TCSC装置电磁兼容能力,建立国产化TCSC的技术标准体系,解决装设TCSC装置线路的继电保护距离I段暂态超越或保护范围太短的问题及优化TCSC与电力系统稳定器、安全自动装置等设备的协调运行问题,并积极推广TCSC技术应用的建议。
文摘In this paper, a hybrid optimization algorithm is proposed for modeling and managing the micro grid (MG) system. The management of distributed energy sources with MG is a multi-objective problem which consists of wind turbine (WT), photovoltaic (PV) array, fuel cell (FC), micro turbine (MT) and diesel generator (DG). Because, perfect economic model of energy source of the MG units are needed to describe the operating cost of the output power generated, the objective of the hybrid model is to minimize the fuel cost of the MG sources such as FC, MT and DG. The problem formulation takes into consideration the optimal configuration of the MG at a minimum fuel cost, operation and maintenance costs as well as emissions reduction. Here, the hybrid algorithm is obtained as artificial bee colony (ABC) algorithm, which is used in two stages. The first stage of the ABC gets the optimal MG configuration at a minimum fuel cost for the required load demand. From the minimized fuel cost functions, the operation and maintenance cost as well as the emission is reduced using the second stage of the ABC. The proposed method is implemented in the Maflab/ Simulink platform and its effectiveness is analyzed by comparing with existing techniques. The comparison demonstrates the superiority of the proposed approach and confirms its potential to solve the problem.