In-situ tensile testing in TEM (transmission electron microscopy) is a useful tool for studying mechanical properties of nano-structures because it can provide quanti-tative information on sample deformation at atomic...In-situ tensile testing in TEM (transmission electron microscopy) is a useful tool for studying mechanical properties of nano-structures because it can provide quanti-tative information on sample deformation at atomic scale. To facilitate in-situ TEM tensile tests of SCS (single crystal silicon) nanobeam, a MEMS tensile-testing chip was designed and fabricated. The chip was fabricated by means of bulk micro-machining and wafer bonding techniques. An SCS nanobeam, a comb drive ac-tuator, a force sensor beam and an electron beam window were integrated into the chip. With the on-chip comb-drive-actuator stretching the nanobeam and in-situ TEM observation, tensile test on a 90 nm-thick nanobeam was performed and the strain-stress relationship was obtained. The Young's modulus was fitted to be 161 GPa and did not show the size effect.展开更多
Increasing the allowable gas pressure of underground gas storage(UGS) is one of the most effective methods to increase its working gas capacity. In this context, hydraulic fracturing tests are implemented on the targe...Increasing the allowable gas pressure of underground gas storage(UGS) is one of the most effective methods to increase its working gas capacity. In this context, hydraulic fracturing tests are implemented on the target formation for the UGS construction of Jintan salt caverns, China, in order to obtain the minimum principal in situ stress and the fracture breakdown pressure. Based on the test results, the maximum allowable gas pressure of the Jintan UGS salt cavern is calibrated. To determine the maximum allowable gas pressure, KING-1 and KING-2 caverns are used as examples. A three-dimensional(3D)geomechanical model is established based on the sonar data of the two caverns with respect to the features of the target formation. New criteria for evaluating gas penetration failure and gas seepage are proposed. Results show that the maximum allowable gas pressure of the Jintan UGS salt cavern can be increased from 17 MPa to 18 MPa(i.e. a gradient of about 18 k Pa/m at the casing shoe depth). Based on numerical results, a field test with increasing maximum gas pressure to 18 MPa has been carried out in KING-1 cavern. Microseismic monitoring has been conducted during the test to evaluate the safety of the rock mass around the cavern. Field monitoring data show that KING-1 cavern is safe globally when the maximum gas pressure is increased from 17 MPa to 18 MPa. This shows that the geomechanical model and criteria proposed in this context for evaluating the maximum allowable gas pressure are reliable.展开更多
基金the National Basic Research (973 Program) (Grant No. 2006CB300406)
文摘In-situ tensile testing in TEM (transmission electron microscopy) is a useful tool for studying mechanical properties of nano-structures because it can provide quanti-tative information on sample deformation at atomic scale. To facilitate in-situ TEM tensile tests of SCS (single crystal silicon) nanobeam, a MEMS tensile-testing chip was designed and fabricated. The chip was fabricated by means of bulk micro-machining and wafer bonding techniques. An SCS nanobeam, a comb drive ac-tuator, a force sensor beam and an electron beam window were integrated into the chip. With the on-chip comb-drive-actuator stretching the nanobeam and in-situ TEM observation, tensile test on a 90 nm-thick nanobeam was performed and the strain-stress relationship was obtained. The Young's modulus was fitted to be 161 GPa and did not show the size effect.
基金financial supports of National Natural Science Foundation of China (Grant No. 41502296)Youth Innovation Promotion Association, Chinese Academy of Sciences (CAS) (Grant No. 2016296)+1 种基金National Natural Science Foundation of China Innovative Research Team (Grant No. 51621006)Natural Science Foundation for Innovation Group of Hubei Province, China (Grant No. 2016CFA014)
文摘Increasing the allowable gas pressure of underground gas storage(UGS) is one of the most effective methods to increase its working gas capacity. In this context, hydraulic fracturing tests are implemented on the target formation for the UGS construction of Jintan salt caverns, China, in order to obtain the minimum principal in situ stress and the fracture breakdown pressure. Based on the test results, the maximum allowable gas pressure of the Jintan UGS salt cavern is calibrated. To determine the maximum allowable gas pressure, KING-1 and KING-2 caverns are used as examples. A three-dimensional(3D)geomechanical model is established based on the sonar data of the two caverns with respect to the features of the target formation. New criteria for evaluating gas penetration failure and gas seepage are proposed. Results show that the maximum allowable gas pressure of the Jintan UGS salt cavern can be increased from 17 MPa to 18 MPa(i.e. a gradient of about 18 k Pa/m at the casing shoe depth). Based on numerical results, a field test with increasing maximum gas pressure to 18 MPa has been carried out in KING-1 cavern. Microseismic monitoring has been conducted during the test to evaluate the safety of the rock mass around the cavern. Field monitoring data show that KING-1 cavern is safe globally when the maximum gas pressure is increased from 17 MPa to 18 MPa. This shows that the geomechanical model and criteria proposed in this context for evaluating the maximum allowable gas pressure are reliable.