The main structure and working principle of the single-shaft horizontal total mixed ration mixer was discussed. For studying the mixing principle, the analysis of force and motion of the material on the paddle were ma...The main structure and working principle of the single-shaft horizontal total mixed ration mixer was discussed. For studying the mixing principle, the analysis of force and motion of the material on the paddle were made, and paddle angle and rotational speed of the rotor were determined by the experiment, the main mixing ways were explained.展开更多
The Urea Oya Multipurpose Development Project (UMDP) is a water transfer, hydropower and irrigation in the south-eastern part of the central highland region of Sri Lanka. During geotechnical site investigation progr...The Urea Oya Multipurpose Development Project (UMDP) is a water transfer, hydropower and irrigation in the south-eastern part of the central highland region of Sri Lanka. During geotechnical site investigation program 42 hydraulic fracture tests and 42 impression packer tests were carried out in 3 boreholes to about 840 m depth. Based on the stress measurements the minimum and maximum horizontal stress ratios were calculated. In situ stress computations at all the tests were based on the assumption that the principal stress components were vertical (σv) and horizontal (σH and σh, the maximum and minimum, respectively). The results of the measurements had a direct impact on the design of the major openings bearing a high overburden--the underground powerhouse and the transformer cavern--and revealed a significant optimization potential concerning the selection of the lining system of the pressure shaft.展开更多
基金Innovative Talent Research Fund of Harbin City(2006RFQXN011)
文摘The main structure and working principle of the single-shaft horizontal total mixed ration mixer was discussed. For studying the mixing principle, the analysis of force and motion of the material on the paddle were made, and paddle angle and rotational speed of the rotor were determined by the experiment, the main mixing ways were explained.
文摘The Urea Oya Multipurpose Development Project (UMDP) is a water transfer, hydropower and irrigation in the south-eastern part of the central highland region of Sri Lanka. During geotechnical site investigation program 42 hydraulic fracture tests and 42 impression packer tests were carried out in 3 boreholes to about 840 m depth. Based on the stress measurements the minimum and maximum horizontal stress ratios were calculated. In situ stress computations at all the tests were based on the assumption that the principal stress components were vertical (σv) and horizontal (σH and σh, the maximum and minimum, respectively). The results of the measurements had a direct impact on the design of the major openings bearing a high overburden--the underground powerhouse and the transformer cavern--and revealed a significant optimization potential concerning the selection of the lining system of the pressure shaft.