In order to search for the measure to increase the energy dissipation ratio of stepped spillways, some main influencing factors for the energy dissipation ratio of stepped spillways, such as unit discharge, dam slope,...In order to search for the measure to increase the energy dissipation ratio of stepped spillways, some main influencing factors for the energy dissipation ratio of stepped spillways, such as unit discharge, dam slope, height of step and so on, were studied. The results show that the energy dissipation ratio decreases with the increase in the unit discharge and increases as the slope becomes gentle. The effects of step height on the energy dissipation ratio are closely related to unit discharge. If the unit discharge is smaller, the change of energy dissipation ratio with step height becomes greater. While, if the unit discharge is greater, the influence of step height on energy dissipation ratio is very little. According to the distributions of the turbulence kinetic energy and turbulence dissipation rate obtained by numerical simulation, the basic reason of the decrease of energy dissipation ratio with the increase in the unit discharge was discussed and some specific measures to increase the energy dissipation ratio were suggested.展开更多
As an important soil and water conservation engineering measure,more than 100,000 check dams are constructed across the Loess Plateau;these dams play a vital role in reducing floods and sediment in the region.However,...As an important soil and water conservation engineering measure,more than 100,000 check dams are constructed across the Loess Plateau;these dams play a vital role in reducing floods and sediment in the region.However,the effects of check dams on hydrologic process are still unclear,particularly when they are deployed as a system for watershed soil and water management.This study examined the watershed hydrologic process modulated by the check dam system in a typical Loess Plateau catchment.By simulating scenarios with various numbers of check dams using a distributed physically-based hydro-logical model,the effects of the number of check dams on runoff generation and concentration were analyzed for the study catchment.The results showed that the presence of check dams reduced the peak discharge and the flood volume and extended the flood duration;the reduction effect on peak discharge was most significant among the three factors.The system of check dams substantially decreased the runoff coefficient,and the runoff coefficient reduction rate was greater for rainstorms with shorter return periods than for rainstorms with longer return periods.The check dams increased the capacity of the catchment regulating and storing floods and extended the average runoff concentration time in the catchment that flattened the instantaneous unit hydrograph.This study reveals the influencing mech-anism of check dam system on the watershed hydrological process under heavy rainstorm conditions and provides a theoretical basis for evaluating the effects of numerous check dams on regional hydrology and water resources on the Loess Plateau.展开更多
1 Project positioning Baihetan Hydropower Station is classified as the second of the four hydropower cascades in the lower reaches of the Jinsha River:Wudongde,Baihetan,Xiluodu and Xiangjiaba.As an important backbone ...1 Project positioning Baihetan Hydropower Station is classified as the second of the four hydropower cascades in the lower reaches of the Jinsha River:Wudongde,Baihetan,Xiluodu and Xiangjiaba.As an important backbone project for China to implement the strategy of West-to-East Power Transmission and optimize the energy structure,it constitutes an important part of the Yangtze River flood control system.Located at the junction of Ningnan County,Sichuan Province and Qiaojia County,Yunnan Province,the hydropower station is the largest hydropower project under construction in the world,with a unit capacity of million-kilowatts ranking the highest in the world and a total installed capacity of 16 million kW,second only to the Three Gorges Project,ranking the second in the world.展开更多
Due to the complexity of earthwork allocation system for the construction of high concrete face rockfill dam,traditional allocation and planning are not able to function properly in the construction process with stron...Due to the complexity of earthwork allocation system for the construction of high concrete face rockfill dam,traditional allocation and planning are not able to function properly in the construction process with strong randomness.In this paper,the working mechanism of earthwork dynamic allocation system is analyzed comprehensively and a solution to fuzzy earthwork dynamic allocation is proposed on the basis of uncertain factors in the earthwork allocation of a hydropower project.Under the premise of actual situation and the experience of the construction site,an all-coefficient-fuzzy linear programming mathematical model with fuzzy parameters and constraints for earthwork allocation is established according to the structure unit weighted ranking criteria.In this way,the deficiency of certain allocation model can be overcome.The application results indicate that the proposed method is more rational compared with traditional earthwork allocation.展开更多
Modal parameter has been considered as one of the indices in assessing the working state of hydraulic structures. The method for obtaining the modal parameter indices is crucial for health monitoring of hydraulic stru...Modal parameter has been considered as one of the indices in assessing the working state of hydraulic structures. The method for obtaining the modal parameter indices is crucial for health monitoring of hydraulic structures. Traditionally, model parameters are measured from the prototype dynamic test under the excitation of special equipment. The preparation is time-consuming and the method is difficult to carry out. We propose a method in this paper to denoise, reconstruct, determine the order and identify modal parameters based on singular entropy (SE) of eigenmatrix. It can be used to solve the problem of system eigenmatrix order determination, and to identify the modal order and the characteristics of structures under the working state. Finally, this method is applied to identify the operational modal parameters of Ertan arch dam under different flood discharging states and vibration frequencies of the powerhouse with a two-row placed unit in Lijiaxia hydropower station during the unit halting process. This new method provides a simple way to identify the modal parameters of large-scale hydraulic structures under ambient excitation.展开更多
基金Project supported by the National Natural Science Foundation of China (Grant No: 59879013).
文摘In order to search for the measure to increase the energy dissipation ratio of stepped spillways, some main influencing factors for the energy dissipation ratio of stepped spillways, such as unit discharge, dam slope, height of step and so on, were studied. The results show that the energy dissipation ratio decreases with the increase in the unit discharge and increases as the slope becomes gentle. The effects of step height on the energy dissipation ratio are closely related to unit discharge. If the unit discharge is smaller, the change of energy dissipation ratio with step height becomes greater. While, if the unit discharge is greater, the influence of step height on energy dissipation ratio is very little. According to the distributions of the turbulence kinetic energy and turbulence dissipation rate obtained by numerical simulation, the basic reason of the decrease of energy dissipation ratio with the increase in the unit discharge was discussed and some specific measures to increase the energy dissipation ratio were suggested.
基金This research was supported by the National Natural Science Foundation of China(51779204,51879281,5207910)Program for Science&Technology Innovation Research Team of Shaanxi Province(2018TD-037)the Research Fund of the State Key Laboratory of Eco-hydraulics in Northwest Arid Region,Xi'an University of Technology(Grant No.2018KFKT-1).
文摘As an important soil and water conservation engineering measure,more than 100,000 check dams are constructed across the Loess Plateau;these dams play a vital role in reducing floods and sediment in the region.However,the effects of check dams on hydrologic process are still unclear,particularly when they are deployed as a system for watershed soil and water management.This study examined the watershed hydrologic process modulated by the check dam system in a typical Loess Plateau catchment.By simulating scenarios with various numbers of check dams using a distributed physically-based hydro-logical model,the effects of the number of check dams on runoff generation and concentration were analyzed for the study catchment.The results showed that the presence of check dams reduced the peak discharge and the flood volume and extended the flood duration;the reduction effect on peak discharge was most significant among the three factors.The system of check dams substantially decreased the runoff coefficient,and the runoff coefficient reduction rate was greater for rainstorms with shorter return periods than for rainstorms with longer return periods.The check dams increased the capacity of the catchment regulating and storing floods and extended the average runoff concentration time in the catchment that flattened the instantaneous unit hydrograph.This study reveals the influencing mech-anism of check dam system on the watershed hydrological process under heavy rainstorm conditions and provides a theoretical basis for evaluating the effects of numerous check dams on regional hydrology and water resources on the Loess Plateau.
文摘1 Project positioning Baihetan Hydropower Station is classified as the second of the four hydropower cascades in the lower reaches of the Jinsha River:Wudongde,Baihetan,Xiluodu and Xiangjiaba.As an important backbone project for China to implement the strategy of West-to-East Power Transmission and optimize the energy structure,it constitutes an important part of the Yangtze River flood control system.Located at the junction of Ningnan County,Sichuan Province and Qiaojia County,Yunnan Province,the hydropower station is the largest hydropower project under construction in the world,with a unit capacity of million-kilowatts ranking the highest in the world and a total installed capacity of 16 million kW,second only to the Three Gorges Project,ranking the second in the world.
基金Supported by the Science Fund for Creative Research Groups of National Natural Science Foundation of China(No.51021004)Tianjin Research Program of Application Foundation and Advanced Technology(No.12JCZDJC29200)National Key Technology R and D Program in the 12th Five-Year Plan of China(No.2011BAB10B06)
文摘Due to the complexity of earthwork allocation system for the construction of high concrete face rockfill dam,traditional allocation and planning are not able to function properly in the construction process with strong randomness.In this paper,the working mechanism of earthwork dynamic allocation system is analyzed comprehensively and a solution to fuzzy earthwork dynamic allocation is proposed on the basis of uncertain factors in the earthwork allocation of a hydropower project.Under the premise of actual situation and the experience of the construction site,an all-coefficient-fuzzy linear programming mathematical model with fuzzy parameters and constraints for earthwork allocation is established according to the structure unit weighted ranking criteria.In this way,the deficiency of certain allocation model can be overcome.The application results indicate that the proposed method is more rational compared with traditional earthwork allocation.
基金Supported by the National Science Fund for Distinguished Young Scholars(Grant No.50725929)the National Science Foundation of China (Grant Nos.50539060 and 50679052)
文摘Modal parameter has been considered as one of the indices in assessing the working state of hydraulic structures. The method for obtaining the modal parameter indices is crucial for health monitoring of hydraulic structures. Traditionally, model parameters are measured from the prototype dynamic test under the excitation of special equipment. The preparation is time-consuming and the method is difficult to carry out. We propose a method in this paper to denoise, reconstruct, determine the order and identify modal parameters based on singular entropy (SE) of eigenmatrix. It can be used to solve the problem of system eigenmatrix order determination, and to identify the modal order and the characteristics of structures under the working state. Finally, this method is applied to identify the operational modal parameters of Ertan arch dam under different flood discharging states and vibration frequencies of the powerhouse with a two-row placed unit in Lijiaxia hydropower station during the unit halting process. This new method provides a simple way to identify the modal parameters of large-scale hydraulic structures under ambient excitation.