A reasonable islanding strategy of a power system is the final resort for preventing a cascading failure and/or a large-area blackout from occurrence. In recent years, the applications of wide area measurement systems...A reasonable islanding strategy of a power system is the final resort for preventing a cascading failure and/or a large-area blackout from occurrence. In recent years, the applications of wide area measurement systems(WAMS) in emergency control of power systems are increasing. Therefore, a new WAMS-based controlled islanding scheme for interconnected power systems is proposed. First, four similarity indexes associated with the trajectories of generators are defined, and the weights of these four indexes are determined by using the well-developed entropy theory. Then, a coherency identification algorithm based on hierarchical clustering is presented to determine the coherent groups of generators.Secondly, an optimization model for determining controlled islanding schemes based on the coherent groups of generators is developed to seek the optimal cutset. Finally, a 16-generator68-bus power system and a reduced WECC 29-unit 179-bus power system are employed to demonstrate the proposed WAMS-based controlled islanding schemes, and comparisons with existing slow coherency based controlled islanding strategies are also carried out.展开更多
Based on the tracking observations of radio ranges and VLBI delays of Chang’E-1 (CE-1) satellite during the controlled landing on the Moon on March 1, 2009, the landing trajectory and the coordinates of the landing p...Based on the tracking observations of radio ranges and VLBI delays of Chang’E-1 (CE-1) satellite during the controlled landing on the Moon on March 1, 2009, the landing trajectory and the coordinates of the landing point are determined by positioning analysis. It is shown that the landing epoch (the emission epoch of the last signal) of CE-1 satellite on the Moon was at UTC8h13m6.51s. The lunar longitude, latitude and surface height of the landing point in the lunar primary axes frame are respectively 52.2732°, 1.6440° and –3.56 km (the reference lunar radius is 1738 km). The uncertainties are 0.0040°, 0.0168° and 0.18 km. The corresponding uncertainty in the tangential direction of the lunar surface is 0.52 km and the three-dimensional (3D) positioning uncertainty is 0.55 km. It is accordingly deduced that even with the present technical specifications of the radio ranges and VLBI delays, the 1 km 3D positioning precision could be guaranteed for the lander in the second stage of China’s Lunar Explora- tion Project. Concerning the trace determination of the rover on the lunar surface, because only telemetry signal will be emitted, VLBI would be the sole tracking technique from the Earth. The application of the constraint of geocentric distance is shown to be helpful to improving the positioning precision. It is worthy to pay close attention to the applications of the same beam VLBI technique, the lunar topographic model and the on-board observations of the lander and rover to the position/trace determination of the rover.展开更多
基金jointly supported by the National Key Research Program of China(No.2016YFB0900105)National Natural Science Foundation of China(No.51377005)Specialized Research Fund for the Doctoral Program of Higher Education(No.20120101110112)
文摘A reasonable islanding strategy of a power system is the final resort for preventing a cascading failure and/or a large-area blackout from occurrence. In recent years, the applications of wide area measurement systems(WAMS) in emergency control of power systems are increasing. Therefore, a new WAMS-based controlled islanding scheme for interconnected power systems is proposed. First, four similarity indexes associated with the trajectories of generators are defined, and the weights of these four indexes are determined by using the well-developed entropy theory. Then, a coherency identification algorithm based on hierarchical clustering is presented to determine the coherent groups of generators.Secondly, an optimization model for determining controlled islanding schemes based on the coherent groups of generators is developed to seek the optimal cutset. Finally, a 16-generator68-bus power system and a reduced WECC 29-unit 179-bus power system are employed to demonstrate the proposed WAMS-based controlled islanding schemes, and comparisons with existing slow coherency based controlled islanding strategies are also carried out.
基金supported by the National Natural Science Foundation of China (Grant Nos. 10778635 and 10973030)China’s Lunar Exploration Project (CE-1)+1 种基金National High-Tech Research and Development Program of China (Grant Nos. 2008AA12A209 and 2008AA12A210)STC of Shanghai Munici-pality (Grant No. 06DZ22101)
文摘Based on the tracking observations of radio ranges and VLBI delays of Chang’E-1 (CE-1) satellite during the controlled landing on the Moon on March 1, 2009, the landing trajectory and the coordinates of the landing point are determined by positioning analysis. It is shown that the landing epoch (the emission epoch of the last signal) of CE-1 satellite on the Moon was at UTC8h13m6.51s. The lunar longitude, latitude and surface height of the landing point in the lunar primary axes frame are respectively 52.2732°, 1.6440° and –3.56 km (the reference lunar radius is 1738 km). The uncertainties are 0.0040°, 0.0168° and 0.18 km. The corresponding uncertainty in the tangential direction of the lunar surface is 0.52 km and the three-dimensional (3D) positioning uncertainty is 0.55 km. It is accordingly deduced that even with the present technical specifications of the radio ranges and VLBI delays, the 1 km 3D positioning precision could be guaranteed for the lander in the second stage of China’s Lunar Explora- tion Project. Concerning the trace determination of the rover on the lunar surface, because only telemetry signal will be emitted, VLBI would be the sole tracking technique from the Earth. The application of the constraint of geocentric distance is shown to be helpful to improving the positioning precision. It is worthy to pay close attention to the applications of the same beam VLBI technique, the lunar topographic model and the on-board observations of the lander and rover to the position/trace determination of the rover.