With the rapid growth of photovoltaic integration,the volatility and uncertainty of intermittent photovoltaic injection will dramatically reduce system operation reliability from the generation side.The system operato...With the rapid growth of photovoltaic integration,the volatility and uncertainty of intermittent photovoltaic injection will dramatically reduce system operation reliability from the generation side.The system operator may face certain financial risks brought by unexpected power failure under low operation reliability.Therefore,maintaining sufficient power reserve to meet system operation reliability and reduce risk,especially in an isolated system,is essential.However,the traditional reserve preparation strategy fails to consider the uncertainties of the power generation under the high penetration levels of emerging renewable energy resources.A novel reserve preparation strategy for an isolated system is developed in this paper using a twostage model.In the first stage,the optimal hourly scheduling of an isolated system is determined.In the second stage,a minute level conditional value-at-risk(CVaR)based model is established where the uncertainty of the reserve requirement is introduced with the chance constraint.The proposed discretized step transformation(DST)and subtraction type convolution(STC)methods are utilized to convert the model into mixedinteger linear programming,and finally solved by applying the CPLEX solver.The IEEE 39-bus system is used as the test case to validate the feasibility and effectiveness of the proposed two-stage model.展开更多
以系统总成本最小为目标函数,基于可再生能源发电混合系统优化仿真软件(Hybrid Optimization Model for Electric Renewables,HOMER),针对某工业园区的风光资源数据和负荷情况,进行了设备成本和参数设定。在获得的配置方案中,对比分析...以系统总成本最小为目标函数,基于可再生能源发电混合系统优化仿真软件(Hybrid Optimization Model for Electric Renewables,HOMER),针对某工业园区的风光资源数据和负荷情况,进行了设备成本和参数设定。在获得的配置方案中,对比分析了并网型风光储、风光互补以及风储、光储发电系统的优化配置方案,分析其弃电率和经济性,验证了风光储系统的优越性,最终得到并网型风光储互补发电系统总净现成本最小的配置,并对其各设备的年发电量、系统可靠性及经济性进行了分析,可为可再生能源多能互补微电网风光储系统容量优化配置的研究提供参考。展开更多
Due to the intermittency and instability of Wind-Solar energy and easy compensation of hydropower, this study proposes a Wind-Solar-Hydro power optimal scheduling model. This model is aimed at maximizing the total sys...Due to the intermittency and instability of Wind-Solar energy and easy compensation of hydropower, this study proposes a Wind-Solar-Hydro power optimal scheduling model. This model is aimed at maximizing the total system power generation and the minimum ten-day joint output. To effectively optimize the multi-objective model, a new algorithm named non-dominated sorting culture differential evolution algorithm(NSCDE) is proposed. The feasibility of NSCDE was verified through several well-known benchmark problems. It was then applied to the Jinping Wind-Solar-Hydro complementary power generation system. The results demonstrate that NSCDE can provide decision makers a series of optimized scheduling schemes.展开更多
文摘With the rapid growth of photovoltaic integration,the volatility and uncertainty of intermittent photovoltaic injection will dramatically reduce system operation reliability from the generation side.The system operator may face certain financial risks brought by unexpected power failure under low operation reliability.Therefore,maintaining sufficient power reserve to meet system operation reliability and reduce risk,especially in an isolated system,is essential.However,the traditional reserve preparation strategy fails to consider the uncertainties of the power generation under the high penetration levels of emerging renewable energy resources.A novel reserve preparation strategy for an isolated system is developed in this paper using a twostage model.In the first stage,the optimal hourly scheduling of an isolated system is determined.In the second stage,a minute level conditional value-at-risk(CVaR)based model is established where the uncertainty of the reserve requirement is introduced with the chance constraint.The proposed discretized step transformation(DST)and subtraction type convolution(STC)methods are utilized to convert the model into mixedinteger linear programming,and finally solved by applying the CPLEX solver.The IEEE 39-bus system is used as the test case to validate the feasibility and effectiveness of the proposed two-stage model.
文摘以系统总成本最小为目标函数,基于可再生能源发电混合系统优化仿真软件(Hybrid Optimization Model for Electric Renewables,HOMER),针对某工业园区的风光资源数据和负荷情况,进行了设备成本和参数设定。在获得的配置方案中,对比分析了并网型风光储、风光互补以及风储、光储发电系统的优化配置方案,分析其弃电率和经济性,验证了风光储系统的优越性,最终得到并网型风光储互补发电系统总净现成本最小的配置,并对其各设备的年发电量、系统可靠性及经济性进行了分析,可为可再生能源多能互补微电网风光储系统容量优化配置的研究提供参考。
基金supported by the National Key R&D Program of China (2016YFC0402209)the Major Research Plan of the National Natural Science Foundation of China (No. 91647114)
文摘Due to the intermittency and instability of Wind-Solar energy and easy compensation of hydropower, this study proposes a Wind-Solar-Hydro power optimal scheduling model. This model is aimed at maximizing the total system power generation and the minimum ten-day joint output. To effectively optimize the multi-objective model, a new algorithm named non-dominated sorting culture differential evolution algorithm(NSCDE) is proposed. The feasibility of NSCDE was verified through several well-known benchmark problems. It was then applied to the Jinping Wind-Solar-Hydro complementary power generation system. The results demonstrate that NSCDE can provide decision makers a series of optimized scheduling schemes.