期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
连续波热牙胶垂直充填技术的临床评价 被引量:11
1
作者 杨春侠 孙晓强 +1 位作者 庞勃 刘丽静 《广东牙病防治》 2014年第1期22-24,共3页
目的通过连续波热牙胶垂直充填方法与冷牙胶侧压根管充填方法在充填时间、根管充填质量、术后疼痛的比较,对连续波热牙胶充填技术进行临床评价。方法选择需要做根管治疗的患牙140颗,随机分为2组,其中冷牙胶组76颗,热牙胶组64颗,比较2组... 目的通过连续波热牙胶垂直充填方法与冷牙胶侧压根管充填方法在充填时间、根管充填质量、术后疼痛的比较,对连续波热牙胶充填技术进行临床评价。方法选择需要做根管治疗的患牙140颗,随机分为2组,其中冷牙胶组76颗,热牙胶组64颗,比较2组患牙根管充填时间、充填质量、侧支根管充填情况、术后疼痛情况等。结果冷牙胶组充填时间为切牙(6.51±0.26)min/根管、前磨牙(4.13±0.26)min/根管、磨牙(4.17±0.27)min/根管,热牙胶组则分别为(3.07±0.16)min/根管、(2.79±0.31)min/根管、(2.91±0.24)min/根管,差异均具有统计学意义(P<0.05);2组根管充填质量差异无统计学意义(P>0.05),根管超填与根管充填方法无关;热牙胶组侧支根管充填率高于冷牙胶组;2组根管充填术后疼痛差异无统计学意义(P>0.05)。结论连续波热牙胶垂直充填方法可以快速、高质量地完成根管充填,提高侧支根管充填率,不会增加根管超填以及术后疼痛的风险。 展开更多
关键词 连续波热牙胶根管充填 冷牙胶侧压根管充填 充填时间 充填质量
下载PDF
Raw Gangue Filling Mining under Construction —A Case Study in China 被引量:1
2
作者 Daqing Li Changxiang Wang +4 位作者 Jinjie Xiao Wei Lu Baoliang Zhang Zongkai Li Xiaozhang Tong 《Engineering(科研)》 CAS 2023年第3期176-195,共20页
In order to recover the strip pillar coal resources, reduce the amount of gangue mountain and realize remediation of the goaf environment in the old mining area, the raw gangue filling mining technology was proposed. ... In order to recover the strip pillar coal resources, reduce the amount of gangue mountain and realize remediation of the goaf environment in the old mining area, the raw gangue filling mining technology was proposed. According to the previous practical experience, the feasibility of the implementation of raw gangue filling mining technology in the coal-pressed area was analyzed. Through the filling gangue compaction test, the deformation under different loading stages was obtained. Further, a reasonable prediction of the deformation beyond the experimental limited loading load was made based on the experimental results. Through the deformation source analysis of the whole process of gangue filling, the key factors for controlling deformation before, during, and after filling were determined. Additionally, the proportion of deformation during different stages was quantified. Considering the protection of surface buildings, mining fullness of the working face and mining technology, the production parameters of 1209 and 1210 filling working faces were preliminarily determined. Through numerical simulation, the rationality of mining scheme was verified. Based on the practice of 1209 working face and the key factors to control the deformation of gangue filling, the mining system and process in 1210 working face were optimized. According to the measured surface rock movement, raw gangue filling mining technology can meet the requirements of surface building protection level. Especially, this paper provides a method to quantitatively calculate the equivalent mining height (EMH) of raw gangue filling and its mining deformation, which has reference significance for old mining areas. 展开更多
关键词 Coal Resource Recovery under Construction Raw Gangue filling Mining Principle of Space-time Control filling System and process Innovation
下载PDF
李楼铁矿空场嗣后充填法运行管理探讨 被引量:1
3
作者 王志君 《金属矿山》 CAS 北大核心 2022年第6期35-39,共5页
充填采矿法在地下铁矿体开采中得到越来越多的应用,目前空场嗣后充填法运行管理主要以“三级矿量”理论为基础,缺少空区维护和充填组织管理,已不能完全涵盖采矿的全过程管理。通过Mathews稳定图法确定采场暴露面积,结合薄板理论,构建采... 充填采矿法在地下铁矿体开采中得到越来越多的应用,目前空场嗣后充填法运行管理主要以“三级矿量”理论为基础,缺少空区维护和充填组织管理,已不能完全涵盖采矿的全过程管理。通过Mathews稳定图法确定采场暴露面积,结合薄板理论,构建采空区顶板—矿柱蠕变损伤力学模型的微分方程,计算空区暴露时间。进一步分析了采场布置、空区暴露面积及时间、充填组织三者相互关系,探求了采场布置、空区及充填组织衔接规律,梳理了从出矿、充填到空区管理的生产管理思路,完善了嗣后充填采矿的全过程管理。 展开更多
关键词 采场布置 空区暴露面积及时间 充填组织 全过程管理
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部