With the continuous growth of the tertiary industry and residential loads,balancing the power supply and consumption during peak demand time has become a critical issue.Some studies try to alleviate peak load by incre...With the continuous growth of the tertiary industry and residential loads,balancing the power supply and consumption during peak demand time has become a critical issue.Some studies try to alleviate peak load by increasing power generation on the supply side.Due to the short duration of peak load,this may cause redundant installation capacity.Alternatively,others attempt to shave peak demand by installing energy storage facilities.However,the aforementioned research did not consider interruptible load regulation when optimizing system operations.In fact,regulating interruptible load has great potential for reducing system peak load.In this paper,an interruptible load scheduling model considering the user subsidy rate is first proposed to reduce system peak load and operational costs.This model has fully addressed the constraints of minimum daily load reduction and user interruption load time.After that,by taking a community in Shanghai as an example,the improved chicken swarm optimization algorithm is applied to solve the interruptible load scheduling scheme.Finally,the simulation results validate the efficacy of the proposed optimization algorithm and indicate the significant advantages of the proposed model in alleviating the peak load and reducing operational costs.展开更多
As an effective means for improving system condition and reducing failures, a reasonable preventive maintenance scheduling guarantees the stability and safety of the system. This paper studies a consecutive maintenanc...As an effective means for improving system condition and reducing failures, a reasonable preventive maintenance scheduling guarantees the stability and safety of the system. This paper studies a consecutive maintenance scheduling problem for single-component systems with imperfect maintenance, and an optimum model with minimum reliability constraint for minimal cost rate is developed based on the renewal theory. The agebased and reliability-based maintenance strategies are modeled and compared according to a numerical example based on the degradation data of the actual system, which also verifies the optimality of the reliability-based strategy. At last, the influence of some key parameters is discussed by sensitive analysis.展开更多
Production flow rates are crucial to make operational decisions,monitor,manage,and optimize oil and gas fields.Flow rates also have a financial importance to correctly allocate production to fiscal purposes required b...Production flow rates are crucial to make operational decisions,monitor,manage,and optimize oil and gas fields.Flow rates also have a financial importance to correctly allocate production to fiscal purposes required by regulatory agencies or to allocate production in fields owned by multiple operators.Despite its significance,usually only the total field production is measured in real time,which requires an alternative way to estimate wells'production.To address these challenges,this work presents a back allocation methodology that leverages real-time instrumentation,simulations,algorithms,and mathe-matical programming modeling to enhance well monitoring and assist in well test scheduling.The methodology comprises four modules:simulation,classification,error calculation,and optimization.These modules work together to characterize the flowline,wellbore,and reservoir,verify simulation outputs,minimize errors,and calculate flow rates while honoring the total platform flow rate.The well status generated through the classification module provides valuable information about the current condition of each well(i.e.if the well is deviating from the latest well test parameters),aiding in decision-making for well testing scheduling and prioritizing.The effectiveness of the methodology is demonstrated through its application to a representative offshore oil field with 14 producing wells and two years of daily production data.The results highlight the robustness of the methodology in properly classifying the wells and obtaining flow rates that honor the total platform flow rate.Furthermore,the methodology supports well test scheduling and provides reliable indicators for well conditions.By uti-lizing real-time data and advanced modeling techniques,this methodology enhances production monitoring and facilitates informed operational decision-making in the oil and gas industry.展开更多
文摘With the continuous growth of the tertiary industry and residential loads,balancing the power supply and consumption during peak demand time has become a critical issue.Some studies try to alleviate peak load by increasing power generation on the supply side.Due to the short duration of peak load,this may cause redundant installation capacity.Alternatively,others attempt to shave peak demand by installing energy storage facilities.However,the aforementioned research did not consider interruptible load regulation when optimizing system operations.In fact,regulating interruptible load has great potential for reducing system peak load.In this paper,an interruptible load scheduling model considering the user subsidy rate is first proposed to reduce system peak load and operational costs.This model has fully addressed the constraints of minimum daily load reduction and user interruption load time.After that,by taking a community in Shanghai as an example,the improved chicken swarm optimization algorithm is applied to solve the interruptible load scheduling scheme.Finally,the simulation results validate the efficacy of the proposed optimization algorithm and indicate the significant advantages of the proposed model in alleviating the peak load and reducing operational costs.
基金the National Natural Science Foundation of China(Nos.71571015 and 71621001)
文摘As an effective means for improving system condition and reducing failures, a reasonable preventive maintenance scheduling guarantees the stability and safety of the system. This paper studies a consecutive maintenance scheduling problem for single-component systems with imperfect maintenance, and an optimum model with minimum reliability constraint for minimal cost rate is developed based on the renewal theory. The agebased and reliability-based maintenance strategies are modeled and compared according to a numerical example based on the degradation data of the actual system, which also verifies the optimality of the reliability-based strategy. At last, the influence of some key parameters is discussed by sensitive analysis.
文摘Production flow rates are crucial to make operational decisions,monitor,manage,and optimize oil and gas fields.Flow rates also have a financial importance to correctly allocate production to fiscal purposes required by regulatory agencies or to allocate production in fields owned by multiple operators.Despite its significance,usually only the total field production is measured in real time,which requires an alternative way to estimate wells'production.To address these challenges,this work presents a back allocation methodology that leverages real-time instrumentation,simulations,algorithms,and mathe-matical programming modeling to enhance well monitoring and assist in well test scheduling.The methodology comprises four modules:simulation,classification,error calculation,and optimization.These modules work together to characterize the flowline,wellbore,and reservoir,verify simulation outputs,minimize errors,and calculate flow rates while honoring the total platform flow rate.The well status generated through the classification module provides valuable information about the current condition of each well(i.e.if the well is deviating from the latest well test parameters),aiding in decision-making for well testing scheduling and prioritizing.The effectiveness of the methodology is demonstrated through its application to a representative offshore oil field with 14 producing wells and two years of daily production data.The results highlight the robustness of the methodology in properly classifying the wells and obtaining flow rates that honor the total platform flow rate.Furthermore,the methodology supports well test scheduling and provides reliable indicators for well conditions.By uti-lizing real-time data and advanced modeling techniques,this methodology enhances production monitoring and facilitates informed operational decision-making in the oil and gas industry.