Combining improved injector, gas line and valve-driving models, a gas chromatograph (GC) equipped with Hydrogen Flame Ionization Detector (FID) and Electron Capture Detector (ECD), can measure CH4, CO2, and N2O simult...Combining improved injector, gas line and valve-driving models, a gas chromatograph (GC) equipped with Hydrogen Flame Ionization Detector (FID) and Electron Capture Detector (ECD), can measure CH4, CO2, and N2O simultaneously in an air sample in four minutes. Test results show that the system has high sensitivity, resolution, and precision; the linear response range of the system meets the requirement of flux measurements in situ. The system is suitable for monitoring fluxes of the main greenhouse gases in a short-plant field since it is easy to use, efficacious, and constant and reliable in collecting data.展开更多
Green energy is driving the evolutions of energy industry and carbon emission is becoming an important concern.Considering the increasing couplings among various energy sectors,this paper investigates multi-period opt...Green energy is driving the evolutions of energy industry and carbon emission is becoming an important concern.Considering the increasing couplings among various energy sectors,this paper investigates multi-period optimal energy flow and energy pricing in carbon-emission embedded integrated energy systems,including electricity,natural gas,and district heating networks.Firstly,an optimal scheduling model of integrated energy systems was proposed in this paper.The models of DC power flow,natural gas pipeline flow and heating network energy flow are presented and linearized for the optimization problem.Natural gas-fired generators and combined heat and power(CHP)units are modeled as coupling components of electricitygas and electricity-heating networks.Then,based on the optimal scheduling model,the locational marginal prices(LMP)for electricity,natural gas and heating network are determined.Moreover,the carbon emission caused by energy production has been taken into account in the optimal scheduling and energy pricing process.Finally,case studies on a combined network consisting of IEEE 39-bus system,Belgium 20-node natural gas system and 6-node heating system demonstrate the effectiveness of the proposed model and the impacts of carbon emission on system scheduling and LMP.展开更多
文摘Combining improved injector, gas line and valve-driving models, a gas chromatograph (GC) equipped with Hydrogen Flame Ionization Detector (FID) and Electron Capture Detector (ECD), can measure CH4, CO2, and N2O simultaneously in an air sample in four minutes. Test results show that the system has high sensitivity, resolution, and precision; the linear response range of the system meets the requirement of flux measurements in situ. The system is suitable for monitoring fluxes of the main greenhouse gases in a short-plant field since it is easy to use, efficacious, and constant and reliable in collecting data.
基金This work was supported in part by National Natural Science Foundation of China(51677022,51607033,and 51607034)National Key Research and Development Program of China(2017YFB0903400)Integrated Energy System Innovation Team of Jilin Province of China(20180519015JH).
文摘Green energy is driving the evolutions of energy industry and carbon emission is becoming an important concern.Considering the increasing couplings among various energy sectors,this paper investigates multi-period optimal energy flow and energy pricing in carbon-emission embedded integrated energy systems,including electricity,natural gas,and district heating networks.Firstly,an optimal scheduling model of integrated energy systems was proposed in this paper.The models of DC power flow,natural gas pipeline flow and heating network energy flow are presented and linearized for the optimization problem.Natural gas-fired generators and combined heat and power(CHP)units are modeled as coupling components of electricitygas and electricity-heating networks.Then,based on the optimal scheduling model,the locational marginal prices(LMP)for electricity,natural gas and heating network are determined.Moreover,the carbon emission caused by energy production has been taken into account in the optimal scheduling and energy pricing process.Finally,case studies on a combined network consisting of IEEE 39-bus system,Belgium 20-node natural gas system and 6-node heating system demonstrate the effectiveness of the proposed model and the impacts of carbon emission on system scheduling and LMP.