Large engineering plants (LEPs) have certain unique features that necessitate a maintenance strategy that is a combination of both time and condition based maintenance. Although this requirement is appreciated to va...Large engineering plants (LEPs) have certain unique features that necessitate a maintenance strategy that is a combination of both time and condition based maintenance. Although this requirement is appreciated to varying degrees by asset owners, applied research leading to a systematic development of such a maintenance strategy is the need of the day. Such a strategy should also adopt a wholesome "systemic" approach so that the realization of the overall objectives of maintenance is maximized. E-maintenance has several potential benefits for large engineering plants. In this paper, a three pronged strategy is suggested for the successful implementation of e-maintenance for LEPs. Firstly, an integrated condition and time based maintenance framework is proposed for LEPs. Secondly, reference is drawn to models for condition and time based maintenance at systemic levels. As a part of the ab initio development of a condition monitoring system for a LEP, one of the characteristics of the condition monitoring system, namely, predictability, is discussed in detail as a sample for a systemic study. Thirdly, emphasis is laid on the information and expertise available in the domain of plant design, operation and maintenance and the same is tapped for incorporation in maintenance decision making.展开更多
In this paper, the problem of optimum allocation of repairable and replaceable components in a system is formulated as a Bi-objective stochastic non linear programming problem. The system maintenance time and cost are...In this paper, the problem of optimum allocation of repairable and replaceable components in a system is formulated as a Bi-objective stochastic non linear programming problem. The system maintenance time and cost are random variable and has gamma and normal distribution respectively. A Bi-criteria optimization technique, weighted Tchebycheff is used to obtain the optimum allocation for a system. A numerical example is also presented to illustrate the computational details.展开更多
通过融入Web驱动和非接触式的电子信息技术,电子化制造(e—manufacturing)系统可使企业获得近乎零的故障停机率,并可与企业高层商务系统保持信息同步,创造“只对信息处理一次(OHIO,only handle information once)”的工作环境。本文介绍...通过融入Web驱动和非接触式的电子信息技术,电子化制造(e—manufacturing)系统可使企业获得近乎零的故障停机率,并可与企业高层商务系统保持信息同步,创造“只对信息处理一次(OHIO,only handle information once)”的工作环境。本文介绍了Web驱动的电子化制造技术的基本原理、战略规划及其所应具备的基本要素,并重点阐述了智能维护这一关键技术。最后,为电子化制造的实施提出了应对策略。展开更多
文摘Large engineering plants (LEPs) have certain unique features that necessitate a maintenance strategy that is a combination of both time and condition based maintenance. Although this requirement is appreciated to varying degrees by asset owners, applied research leading to a systematic development of such a maintenance strategy is the need of the day. Such a strategy should also adopt a wholesome "systemic" approach so that the realization of the overall objectives of maintenance is maximized. E-maintenance has several potential benefits for large engineering plants. In this paper, a three pronged strategy is suggested for the successful implementation of e-maintenance for LEPs. Firstly, an integrated condition and time based maintenance framework is proposed for LEPs. Secondly, reference is drawn to models for condition and time based maintenance at systemic levels. As a part of the ab initio development of a condition monitoring system for a LEP, one of the characteristics of the condition monitoring system, namely, predictability, is discussed in detail as a sample for a systemic study. Thirdly, emphasis is laid on the information and expertise available in the domain of plant design, operation and maintenance and the same is tapped for incorporation in maintenance decision making.
文摘In this paper, the problem of optimum allocation of repairable and replaceable components in a system is formulated as a Bi-objective stochastic non linear programming problem. The system maintenance time and cost are random variable and has gamma and normal distribution respectively. A Bi-criteria optimization technique, weighted Tchebycheff is used to obtain the optimum allocation for a system. A numerical example is also presented to illustrate the computational details.
文摘通过融入Web驱动和非接触式的电子信息技术,电子化制造(e—manufacturing)系统可使企业获得近乎零的故障停机率,并可与企业高层商务系统保持信息同步,创造“只对信息处理一次(OHIO,only handle information once)”的工作环境。本文介绍了Web驱动的电子化制造技术的基本原理、战略规划及其所应具备的基本要素,并重点阐述了智能维护这一关键技术。最后,为电子化制造的实施提出了应对策略。