In this paper, based on the inherent characteristic of the contention relation between flows in ad hoc networks, we introduce the notion of the link's interference set, extend the utility maximization problem represe...In this paper, based on the inherent characteristic of the contention relation between flows in ad hoc networks, we introduce the notion of the link's interference set, extend the utility maximization problem representing congestion control in wireline networks to ad hoc networks, apply the penalty function approach and the subgradient method to solve this problem, and propose the congestion control algorithm Penalty function-based Optical Congestion Control (POCC) which is implemented in NS2- simulator. Specifically, each link transmits periodically the information on its congestion state to its interference set; the set ; the sermon at each source adjusts the transmission rate based on the optimal tradeoffbetween the utility value and the congestion level which the interference set of the links that this session goes though suffers from. MATLAB-based simulation results showed that POCC can approach the globally optimal solution. The NS2-based simulation results showed that POCC outperforms default TCP and ATCP to achieve efficient and fair resource allocation in ad hoc networks.展开更多
The independent system operator (ISO) is a key element in the deregulated structure with one of the responsibilities of transmission congestion management (CM). The ISO opts market based solutions to manage conges...The independent system operator (ISO) is a key element in the deregulated structure with one of the responsibilities of transmission congestion management (CM). The ISO opts market based solutions to manage congestion receiving bids from generation companies (GENCOs) as well as distribution companies (DISCOMs) to reschedule their generation and relocate demand. The nodal prices increases during the congestion hours and the demand response to nodal prices will be an effective tool for the control of congestion. In this paper, demand response-based CM has been proposed for a mix of pool and bilateral electricity market model. The linear bid curves have been considered for demand bids to respond to the congestion in the network. The bilateral demand has been obtained with minimum deviations in their preferred schedule. The impact of flexible alternating current transmission system (FACTS) devices viz static var compensator (SVC) and thyristor controlled series compensator (TCSC) has also been considered for demand management during congestion. Multi-line congestion cases have been considered to study the impact on demand response without and with FACTS devices. The proposed approach has been tested on the IEEE 24 bus test system.展开更多
文摘In this paper, based on the inherent characteristic of the contention relation between flows in ad hoc networks, we introduce the notion of the link's interference set, extend the utility maximization problem representing congestion control in wireline networks to ad hoc networks, apply the penalty function approach and the subgradient method to solve this problem, and propose the congestion control algorithm Penalty function-based Optical Congestion Control (POCC) which is implemented in NS2- simulator. Specifically, each link transmits periodically the information on its congestion state to its interference set; the set ; the sermon at each source adjusts the transmission rate based on the optimal tradeoffbetween the utility value and the congestion level which the interference set of the links that this session goes though suffers from. MATLAB-based simulation results showed that POCC can approach the globally optimal solution. The NS2-based simulation results showed that POCC outperforms default TCP and ATCP to achieve efficient and fair resource allocation in ad hoc networks.
文摘The independent system operator (ISO) is a key element in the deregulated structure with one of the responsibilities of transmission congestion management (CM). The ISO opts market based solutions to manage congestion receiving bids from generation companies (GENCOs) as well as distribution companies (DISCOMs) to reschedule their generation and relocate demand. The nodal prices increases during the congestion hours and the demand response to nodal prices will be an effective tool for the control of congestion. In this paper, demand response-based CM has been proposed for a mix of pool and bilateral electricity market model. The linear bid curves have been considered for demand bids to respond to the congestion in the network. The bilateral demand has been obtained with minimum deviations in their preferred schedule. The impact of flexible alternating current transmission system (FACTS) devices viz static var compensator (SVC) and thyristor controlled series compensator (TCSC) has also been considered for demand management during congestion. Multi-line congestion cases have been considered to study the impact on demand response without and with FACTS devices. The proposed approach has been tested on the IEEE 24 bus test system.