The Circular Electron Positron Collider(CEPC)is a large scientific project initiated and hosted by China,fostered through extensive collaboration with international partners.The complex comprises four accelerators:a 3...The Circular Electron Positron Collider(CEPC)is a large scientific project initiated and hosted by China,fostered through extensive collaboration with international partners.The complex comprises four accelerators:a 30 GeV Linac,a 1.1 GeV Damping Ring,a Booster capable of achieving energies up to 180 GeV,and a Collider operating at varying energy modes(Z,W,H,and tt).The Linac and Damping Ring are situated on the surface,while the subterranean Booster and Collider are housed in a 100 km circumference underground tunnel,strategically accommodating future expansion with provisions for a potential Super Proton Proton Collider(SPPC).The CEPC primarily serves as a Higgs factory.In its baseline design with synchrotron radiation(SR)power of 30 MW per beam,it can achieve a luminosity of 5×10^(34)cm^(-2)s^(-1)per interaction point(IP),resulting in an integrated luminosity of 13 ab^(-1)for two IPs over a decade,producing 2.6 million Higgs bosons.Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons,facilitating precise measurements of Higgs coupling at sub-percent levels,exceeding the precision expected from the HL-LHC by an order of magnitude.This Technical Design Report(TDR)follows the Preliminary Conceptual Design Report(Pre-CDR,2015)and the Conceptual Design Report(CDR,2018),comprehensively detailing the machine's layout,performance metrics,physical design and analysis,technical systems design,R&D and prototyping efforts,and associated civil engineering aspects.Additionally,it includes a cost estimate and a preliminary construction timeline,establishing a framework for forthcoming engineering design phase and site selection procedures.Construction is anticipated to begin around 2027-2028,pending government approval,with an estimated duration of 8 years.The commencement of experiments and data collection could potentially be initiated in the mid-2030s.展开更多
Within the framework of the UrQMD model, by tracing the number of initial quarks in protons, we study the elliptic flow of protons with 3, 2, 1, 0 initial quarks and anti-protons in Au+Au collisions at SNN^(1/2)= 7.7,...Within the framework of the UrQMD model, by tracing the number of initial quarks in protons, we study the elliptic flow of protons with 3, 2, 1, 0 initial quarks and anti-protons in Au+Au collisions at SNN^(1/2)= 7.7, 11.5, 39,200 GeV. The difference of elliptic flow between protons with 2, 1, 0 initial quarks and anti-protons is smaller than 0,or consistent with 0, respectively. The difference of elliptic flow between transported protons(with 3 initial quarks)and anti-protons is larger than 0 at 7.7, 11.5 and 39 GeV. This is in good agreement with the STAR results at 7.7 and 11.5 GeV, but overestimates the STAR results at 39 GeV. The yield of transported protons with 3 initial quarks is smaller than of protons with 2 and 1 initial quarks, and v_2 of all protons is much smaller than the STAR results. The observation of the v_2 difference of elliptic flow between transported protons and anti-protons in the UrQMD model partly explains the difference between protons and anti-protons observed in the Beam Energy Scan program at the Relativistic Heavy Ion Collider(RHIC).展开更多
基金support from diverse funding sources,including the National Key Program for S&T Research and Development of the Ministry of Science and Technology(MOST),Yifang Wang's Science Studio of the Ten Thousand Talents Project,the CAS Key Foreign Cooperation Grant,the National Natural Science Foundation of China(NSFC)Beijing Municipal Science&Technology Commission,the CAS Focused Science Grant,the IHEP Innovation Grant,the CAS Lead Special Training Programthe CAS Center for Excellence in Particle Physics,the CAS International Partnership Program,and the CAS/SAFEA International Partnership Program for Creative Research Teams.
文摘The Circular Electron Positron Collider(CEPC)is a large scientific project initiated and hosted by China,fostered through extensive collaboration with international partners.The complex comprises four accelerators:a 30 GeV Linac,a 1.1 GeV Damping Ring,a Booster capable of achieving energies up to 180 GeV,and a Collider operating at varying energy modes(Z,W,H,and tt).The Linac and Damping Ring are situated on the surface,while the subterranean Booster and Collider are housed in a 100 km circumference underground tunnel,strategically accommodating future expansion with provisions for a potential Super Proton Proton Collider(SPPC).The CEPC primarily serves as a Higgs factory.In its baseline design with synchrotron radiation(SR)power of 30 MW per beam,it can achieve a luminosity of 5×10^(34)cm^(-2)s^(-1)per interaction point(IP),resulting in an integrated luminosity of 13 ab^(-1)for two IPs over a decade,producing 2.6 million Higgs bosons.Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons,facilitating precise measurements of Higgs coupling at sub-percent levels,exceeding the precision expected from the HL-LHC by an order of magnitude.This Technical Design Report(TDR)follows the Preliminary Conceptual Design Report(Pre-CDR,2015)and the Conceptual Design Report(CDR,2018),comprehensively detailing the machine's layout,performance metrics,physical design and analysis,technical systems design,R&D and prototyping efforts,and associated civil engineering aspects.Additionally,it includes a cost estimate and a preliminary construction timeline,establishing a framework for forthcoming engineering design phase and site selection procedures.Construction is anticipated to begin around 2027-2028,pending government approval,with an estimated duration of 8 years.The commencement of experiments and data collection could potentially be initiated in the mid-2030s.
基金Supported in part by the MoST of China 973-Project(2015CB856901)National Natural Science Foundation of China(11890711)self-determined research funds of CCNU from the colleges’ basic research and operation of MOE(CCNU18TS031)
文摘Within the framework of the UrQMD model, by tracing the number of initial quarks in protons, we study the elliptic flow of protons with 3, 2, 1, 0 initial quarks and anti-protons in Au+Au collisions at SNN^(1/2)= 7.7, 11.5, 39,200 GeV. The difference of elliptic flow between protons with 2, 1, 0 initial quarks and anti-protons is smaller than 0,or consistent with 0, respectively. The difference of elliptic flow between transported protons(with 3 initial quarks)and anti-protons is larger than 0 at 7.7, 11.5 and 39 GeV. This is in good agreement with the STAR results at 7.7 and 11.5 GeV, but overestimates the STAR results at 39 GeV. The yield of transported protons with 3 initial quarks is smaller than of protons with 2 and 1 initial quarks, and v_2 of all protons is much smaller than the STAR results. The observation of the v_2 difference of elliptic flow between transported protons and anti-protons in the UrQMD model partly explains the difference between protons and anti-protons observed in the Beam Energy Scan program at the Relativistic Heavy Ion Collider(RHIC).