As there is substantial progress in the KSTAR tokamak engineering, all themajor structures and sub-systems are under fabrication and in procurement phase. The vacuum vessel,port, cryostat cylinder, lid, and bellows ar...As there is substantial progress in the KSTAR tokamak engineering, all themajor structures and sub-systems are under fabrication and in procurement phase. The vacuum vessel,port, cryostat cylinder, lid, and bellows are being rigorously fabricated in the factory. The lowerpart of the KSTAR such as cryostat base and gravity support has been almost finished in itsfabrication. There are also great progresses and significant results in manufacturing of thesuperconducting magnet, including four Toroidal Field (TF) coils, lower and upper PF7 coils whichare the largest Poloidal Field (PF) coils. The TFOO coil, which has been made for test and back-upof the TF magnet system, was successfully tested in the cool-down and current charging. As thefabrications and procurements of major structures have been actively proceeded, assembly works werealso launched from Aug. 2003. More detailed description on these status, results, and plans will bedescribed in this paper.展开更多
基金the Korean Ministry of Science and Technology under the KSTAR project contract
文摘As there is substantial progress in the KSTAR tokamak engineering, all themajor structures and sub-systems are under fabrication and in procurement phase. The vacuum vessel,port, cryostat cylinder, lid, and bellows are being rigorously fabricated in the factory. The lowerpart of the KSTAR such as cryostat base and gravity support has been almost finished in itsfabrication. There are also great progresses and significant results in manufacturing of thesuperconducting magnet, including four Toroidal Field (TF) coils, lower and upper PF7 coils whichare the largest Poloidal Field (PF) coils. The TFOO coil, which has been made for test and back-upof the TF magnet system, was successfully tested in the cool-down and current charging. As thefabrications and procurements of major structures have been actively proceeded, assembly works werealso launched from Aug. 2003. More detailed description on these status, results, and plans will bedescribed in this paper.