We evaluate the technical feasibility of applying emerging wireless network technologies for resources tracking at building construction sites. We first identify practical constraints in solving resource-tracking prob...We evaluate the technical feasibility of applying emerging wireless network technologies for resources tracking at building construction sites. We first identify practical constraints in solving resource-tracking problems in an enclosed or partially covered environment. We then compare pros and cons of available localization principles and examine the latest wireless communication technologies, including Wi-Fi, Bluetooth, Ultra-Wideband (UWB) and ZigBee. We find that the ZigBee-based wireless sensor network and the received signal strength indicator (RSSI) localization method are most promising to tackle on-site tracking of construction resources. Finally, we anticipate some application challenges associated with deploying wireless sensor networks for resources tracking in the practical context.展开更多
The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial con...The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial condition, and the randomness of the construction process, the installation process of the steel-structure was simulated and optimized by using genetic algorithm (GA) optimization methodology. The operations simulation shortened the installation duration by 39 days (about 16% of the original total duration), guided the manufacturers to plan the construction processes, and provided specific suggestions on the entry time of the installation components, resulting in resource allocation optimization, resource saving, and construction efficiency improvement. Combining with the optimized schedule, the 4D visualization environment can discover time-space conflicts timely, and may assist project managers to reschedule the construction activities in tune with the site layout and resource allocation.展开更多
基金the Hong Kong Polytechnic University Research Project: Automated Field Data Collection and Resource Tracking for Construction Engineering and Project Management
文摘We evaluate the technical feasibility of applying emerging wireless network technologies for resources tracking at building construction sites. We first identify practical constraints in solving resource-tracking problems in an enclosed or partially covered environment. We then compare pros and cons of available localization principles and examine the latest wireless communication technologies, including Wi-Fi, Bluetooth, Ultra-Wideband (UWB) and ZigBee. We find that the ZigBee-based wireless sensor network and the received signal strength indicator (RSSI) localization method are most promising to tackle on-site tracking of construction resources. Finally, we anticipate some application challenges associated with deploying wireless sensor networks for resources tracking in the practical context.
基金the National Natural Science Foundation of China (No. 50478015) the National Technological Support Program for the 11th-Five-year (No. 2007BAF23B02)
文摘The paper presents applications of simplified discrete-event simulation (SDESA), and 4D-GCPSU, to the National Stadium of the Beijing 2008 Olympics. Taking into account influential factors, e.g., resource, spatial condition, and the randomness of the construction process, the installation process of the steel-structure was simulated and optimized by using genetic algorithm (GA) optimization methodology. The operations simulation shortened the installation duration by 39 days (about 16% of the original total duration), guided the manufacturers to plan the construction processes, and provided specific suggestions on the entry time of the installation components, resulting in resource allocation optimization, resource saving, and construction efficiency improvement. Combining with the optimized schedule, the 4D visualization environment can discover time-space conflicts timely, and may assist project managers to reschedule the construction activities in tune with the site layout and resource allocation.