Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources C...Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources Commission has conducted prototype observation on the Yichang-Chenglingji river stretch. On basis of the observed data, the change in river regime and scour-sedimentation evolution and water surface profile below the dam are analysed systematically. The results show that the scouring of downstream river course mainly stretches from Yichang to Ouchikou, mainly occurring in 1980~1987; the scourring mainly takes place in the river channel and the water surface profile drops significantly in dry season,but not quite in high flood season.展开更多
The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the s...The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the shoal-channel evolution over different seasons since the completion of the TGP.Based on analysis of the measured data and the results of a two-dimensional mathematical model,the changes of the river regime and river bed evolution in the Yaojian reach downstream of the TGP were studied.Results show that a high sediment transport flux helps to keep the main flow in the North Branch,while a low sediment transport flux helps to keep the main flow in the South Branch.Thus,the main branch will not change in the near future because of the low sediment transport load.In this study,the flow-sediment process adjusted by the TGP was restored to the conditions before the TGP,and the river bed evolution under the adjusted and non-adjusted flow-sediment conditions was calculated.After the completion of the TGP,the reservoir storage accelerated the flood recession process and decreased the erosion by 11.9%under the flow-sediment conditions in 2010,and the deposition in the flood season decreased by 56.4%.展开更多
文摘Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources Commission has conducted prototype observation on the Yichang-Chenglingji river stretch. On basis of the observed data, the change in river regime and scour-sedimentation evolution and water surface profile below the dam are analysed systematically. The results show that the scouring of downstream river course mainly stretches from Yichang to Ouchikou, mainly occurring in 1980~1987; the scourring mainly takes place in the river channel and the water surface profile drops significantly in dry season,but not quite in high flood season.
基金supported by the National Key Research and Development Program of China(Grants No.2016YFC0402307 and 2016YFC0402103)the National Natural Science Foundation of China(Grant No.51520105014).
文摘The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the shoal-channel evolution over different seasons since the completion of the TGP.Based on analysis of the measured data and the results of a two-dimensional mathematical model,the changes of the river regime and river bed evolution in the Yaojian reach downstream of the TGP were studied.Results show that a high sediment transport flux helps to keep the main flow in the North Branch,while a low sediment transport flux helps to keep the main flow in the South Branch.Thus,the main branch will not change in the near future because of the low sediment transport load.In this study,the flow-sediment process adjusted by the TGP was restored to the conditions before the TGP,and the river bed evolution under the adjusted and non-adjusted flow-sediment conditions was calculated.After the completion of the TGP,the reservoir storage accelerated the flood recession process and decreased the erosion by 11.9%under the flow-sediment conditions in 2010,and the deposition in the flood season decreased by 56.4%.