深水S-lay管道形态和内力分析的分段解析方法 被引量:1

A piecewise analytic method to analyze the pipe configuration and internal forces of deep S-lay
下载PDF
导出
摘要 考虑深水S型铺设中离散均布托辊对上弯段管道的支撑作用,提出了管道铺设形态和内力的分段解析求解方法,通过迭代搜索算法确定管道最佳反弯点和升离点的位置,结合刚性悬链线理论和欧拉梁弯曲理论,推导了管道的变形和内力的解析表达式。依据所建立的分段解析方法编制了相应的数值计算程序,以某3 000 m水深铺设12英寸管道为例,计算了管道形态和内力响应,与商用有限元软件的数值分析结果进行对比,表明了分段解析方法的准确性和有效性。建立的方法具有较高的计算效率,为进一步开展S型铺设参数的优化或可靠性研究提供了有力的手段。 Taking account of the discrete and uniformly-distributed rollers,a piecewise analytic method is proposed to solve the deflection and internal forces of the deep S-lay pipeline.The best lift-off point and inflection point are achieved by means of the iterative search algorithm.Based on the stiffened catenary theory and the bending theory of Euler beam,analytic expressions of the pipe deflection and internal forces are derived.According to the established piecewise analytic method,the corresponding computer code is compiled.Take the S-lay condition of laying a 12 in.pipeline into a water depth of 3 000 m as example,the pipe configuration and internal forces are calculated by the computer code.Compared with the numerical results from the traditional finite element software,it is indicated that the proposed method is accurate and reliable.In consideration of the high efficiency of the proposed method,it provides a powerful means for the further study of the optimization or reliability problem of the parameters of S-lay.
作者 梁辉 赵岩 岳前进 LIANG Hui;ZHAO Yan;YUE Qianjin(State Key Laboratory of Structural Analysis for Industrial Equipment,Faculty of Vehicle Engineering and Mechanics,Dalian University of Technology,Dalian 116024,China)
出处 《海洋工程》 CSCD 北大核心 2019年第1期75-83,100,共10页 The Ocean Engineering
基金 国家重点基础研究发展计划(973计划)(2014CB046803)
关键词 深水S-lay 离散均布托辊 分段解析方法 迭代搜索算法 管道铺设形态 deep S-lay discrete and uniformly-distributed rollers piecewise analytic method iterative search algorithm pipe configuration
  • 相关文献

参考文献5

二级参考文献29

  • 1刘嵬辉,曾宝,程景彬,周云龙,刘长久.国内外铺管船概况[J].油气储运,2007,26(6):11-15. 被引量:48
  • 2王丹,刘家新.一般状态下悬链线方程的应用[J].船海工程,2007,36(3):26-28. 被引量:68
  • 3Dixon D A, Rutledge D R. Stiffened catenary calculations in pipehne laying problem[J]. ASME, Journal of Engineering for Industry, 1968, 90(2) : 153 - 160. 被引量:1
  • 4Pahner A C, Hutchinson G, Ells J W. Configuration of submarine pipelines during laying operations[J]. ASME, Journal of Engineering for Industry, 1974, 96(11):1112- 1118. 被引量:1
  • 5顾永宁.海底管线铺管作业状态分析.海洋工程,1988,6(2):11-23. 被引量:8
  • 6Glaus G F, Saroukh A. Interaction between vessel, stinger, and pipeline during laying operations in high seas[C]//15th International Conference on Offshore Mechanics and Arctic Engineering. 1996, 5:179- 186. 被引量:1
  • 7Zhu D S, Cheung Y K. Optimization of buoyancy of an articulated stinger on submerged pipelines laid with a barge[J]. Ocean Engineering, 1997, 24(4) :301 - 311. 被引量:1
  • 8Guarracino F, Mallardo V. A refined analytical analysis of submerged pipelines in seabed laying[J]. Applied Ocean Research, 1999, 21(6) :281 - 293. 被引量:1
  • 9Wilkins J R, Mcdermott J R. Offshore pipeline stress analysis[C]// Second Annual Offshore Technology Conference. Houston: [s. n. ], 1970,5:OTC1227. 被引量:1
  • 10Offshore Standard DNV- OS- F101 [ S]. Norway: Det Norske Veritas, 2007. 被引量:1

共引文献52

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部