期刊文献+

哈尔滨铁路局动车运用检修设施布局规划研究 被引量:3

下载PDF
导出
摘要 本次规划研究按"一次规划,分步实施,近远结合,逐步到位"的原则,结合中长期铁路网规划,研究哈尔滨铁路局规划的客运专线、快速铁路构成等,根据哈局内各枢纽动车开行方案并结合已建、在建及设计已批复的动车运用检修设施规模情况,对管内动车运用检修能力布局、定位、规模等规划研究。为动车组的顺利开行提供强有力的技术保障。 According to the principle of "one-time planning, step-by-step implementation, near-and-far combination, and gradual realization", combined with the medium- and long-term railway network planning, this paper studies the passenger dedicated line and rapid railway construction planned by Harbin Railway Bureau. According to the operation plan of each hub motor car in Harbin Railway Bureau and combined with the scale of the established, under construction and design approved operation and maintenance facilities, the layout, location and scale of the maintenance capacity of the motor car in the tube are studied, so as to provide a strong technical guarantee for the smooth operation of the D-Series High-Speed Train.
作者 欧阳鹏
出处 《科技创新与应用》 2018年第3期163-166,共4页 Technology Innovation and Application
关键词 哈尔滨铁路局 动车所 存车场 运用检修 布局规划 Harbin Railway Bureau D-Series High-Speed Train depot application and maintenance layout planning
  • 相关文献

参考文献2

二级参考文献12

共引文献25

同被引文献9

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部