摘要 分析了计及换相失败预测环节对特高压直流工程在逆变侧交流故障情况下的响应行为,探讨了特高压直流换相失败预测环节对送端电网直流送端电气量的影响以及换相失败预测控制环节参数的灵敏度。结果表明,换相失败预测环节的投入可以起到减少换相失败持续时间的作用。最后,在逆变侧电压跌落出现换相失败后,分析了其对传输有功功率恢复速度及送端交直流系统的稳定性能的影响。 The response behavior of UHVDC project under AC fault condition of inverter side are analyzed with consideration of commutation failure prediction. The impact of HVDC commutation failure prediction on electrical quantity of DC transmission terminal is discussed, and the sensitivity of the parameters in the predictive control of commutation failure is analyzed. The re- sults show that the input of commutation failure prediction can really reduce the duration of commutation failure. Finally, after the commutation failure occurring in the voltage sag of inverter side, its influence on the recovery speed of active power and the stability of AC / DC system is analyzed.
出处 《四川电力技术》 2017年第6期12-15,33,共5页 Sichuan Electric Power Technology
关键词 换相失败预测环节 逆变侧 触发角 功角稳定 commutation failure prediction inverter side trigger angle power angle stability
  • 相关文献

参考文献4

二级参考文献74

共引文献94

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部