期刊文献+

可靠性约束下系统全寿命周期成本优化建模 被引量:6

Optimization modeling of system lifecycle costs under reliability constraints
下载PDF
导出
摘要 单纯依据全寿命周期成本最小或系统可靠性最高进行系统设计具有一定的局限性.在系统寿命服从Weibull分布的条件下,给出预防性维修策略,构建设计费用、制造费用和维护费用函数,从而建立可靠性约束下的系统全寿命周期成本的优化模型;接着完整地提出包括系统全寿命周期成本、可靠性设计水平和预防性维修次数在内的系统设计均衡区域的决策方法.最后,以某大型装置的光学系统为例,说明该方法在工程应用上的实效性,也为系统设计均衡区域的决策过程提供系统的思路和方法. System design has some limitations if solely depending on lifecycle costs minimum or system relia- bility maximum. Under the condition that the life of a system follows Weibull distribution, preventive maintenance strategies, a design cost function, a manufacturing cost function and a repair cost function are presented, and then a lifecycle costs optimization model under reliability constraints is given. A decision method of equilibrium area for system design is put forward completely, which includes lifecycle costs, reliability design level and the times of preventive maintenance. An example analysis of optical systems of a large-scale facility is shown to demonstrate the applicability and effectiveness of our proposed model, and to provide solutions and methods for the decision process of system design of the equilibrium area.
出处 《系统工程学报》 CSCD 北大核心 2015年第4期442-450,共9页 Journal of Systems Engineering
基金 国家自然科学基金资助项目(71172095) 科技部创新方法工作专项资助项目(2011IM020100)
关键词 系统设计 可靠性 全寿命周期成本 预防性维修 均衡区域 system design reliability lifecycle costs preventive maintenance equilibrium area
  • 相关文献

参考文献15

二级参考文献26

  • 1陈光宇,黄锡滋,唐小我.多阶段系统可靠性的混合式分析[J].系统工程理论与实践,2005,25(2):86-93. 被引量:9
  • 2许兰,粟敬钦,彭翰生,景峰,王文义,彭志涛,李强,胡东霞,贺少勃,丁磊,李明中.四程放大激光系统输出能量稳定性研究[J].强激光与粒子束,2005,17(10):1509-1512. 被引量:6
  • 3Ozden BAYAZIT,Birsen KARPAK,Ayhan YAGCI.A PURCHASING DECISION: SELECTING A SUPPLIER FOR A CONSTRUCTION COMPANY[J].Journal of Systems Science and Systems Engineering,2006,15(2):217-231. 被引量:3
  • 4Tan Jonathan S, Krame Mark A. A general framework for preventive maintenance optimization in chemical process operations. Computers Chemical Engineering, 1997,21(12): 1451-1469. 被引量:1
  • 5Dedopoulos I T, Smeers Y. An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failure. Computers & Industrial Engineering, 1998, 34(3): 643-654. 被引量:1
  • 6Sayed M Metwalli, Mona S Salams. Computer aided reliability for optimum maintenance planning. Computers & Industrial Engineering, 1998, 35(3): 603-606. 被引量:1
  • 7Gharbi A, P Kenne J. Production and preventive maintenance rates control for a manufacturing system: an experimental design approach. Int. J. Production Economics, 2000, 65: 275-287. 被引量:1
  • 8Richard C C, Paul W Murdock Jr. Selective maintenance for support equipment involving multiple maintenance actions.European Journal of Operational Research, 2001, 129:252-258. 被引量:1
  • 9Chao Ton Su, Sung Chi Wu. Multi-action maintenance subject to action-dependent risk and stochastic failure. European Journal of Operational Research, 2000, 125(1):133-148. 被引量:1
  • 10Barlow R, Hunter L. Optimum preventive maintenance policies. Operations Research, 1960, 8:90-100. 被引量:1

共引文献65

同被引文献24

引证文献6

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部