期刊文献+

基于BP神经网络的软件项目成本估测方法 被引量:2

Method of Software Project Cost Estimation Based on BP Neural Network
下载PDF
导出
摘要 为进一步提高软件项目成本估测的准确度,减少在使用传统估测方法时产生的较大误差,提出了一种基于BP神经网络算法的软件项目成本估测模型。利用BP神经网络对软件项目成本进行估计,采用梯度下降自适应Ir的BP算法训练,仿真结果表明,基于算法的软件项目成本估测值与实际成本的偏差较小。 In order to improve the accuracy of software project cost estimation and reduce large gaps when in using traditional methods , a software project cost estimation model based on BP neural network algorithm is proposed .According to BP Neural Network ,the software project cost is estimated by utilizing the algorithm training of Gradient descent with adaptive Ir .The simulation result shows that the deviation value between estimation cost and actual cost is less based on this algorithm .
出处 《航空计算技术》 2014年第3期9-11,15,共4页 Aeronautical Computing Technique
基金 陕西省科技厅国际合作项目资助(2012KW-03-02) 陕西省科技厅工业攻关项目资助(2014k05-62) 西安市科技局科技计划项目资助(CXY1117) 西安市社科规划基金项目资助(14J28)
关键词 软件项目 成本估测模型 BP神经网络 改进算法训练 software project cost estimation model BP neural network improved algorithm training
  • 相关文献

参考文献12

二级参考文献59

  • 1何晓阳,王亚沙.基于模型的软件成本估计方法[J].计算机研究与发展,2006,43(5):777-783. 被引量:10
  • 2李明树,何梅,杨达,舒风笛,王青.软件成本估算方法及应用[J].软件学报,2007,18(4):775-795. 被引量:65
  • 3盛骤,谢式千,潘承毅.概率论与数理统计[M].北京:高等教育出版社,2008:276-281. 被引量:185
  • 4Wang Y,song O,Shen J.Grey learning based software stage-effort ostimation[C] //Proceedings of the 6th International Conference on Machine Leaming and Cybernetics,Hong Kong,China,2007:1470-1475. 被引量:1
  • 5El-Fouly T H M,El-Saadany E F,Salaam M M A.Grey predictor for wind energy conversion systems output power prediction[J].IEEE Transactions on Power Systems.2006,21(3):1450-1452. 被引量:1
  • 6J(o)rgensen M,Shepperd M.A systematic review of software development cost estimation studies[J].IEEE Transaction on Software Engineering,2007,33(1):33-53. 被引量:1
  • 7Lin K,Liu B.A gray system modeling approach to the prediction of calibration intervals[J].IEEE Transactions on Instrumentation and Measurement,2005,54(1):297-304. 被引量:1
  • 8Song Q,Shepperd M,Mair C.Using grey relational analysis to predict software effort with small data seLs[C] //Tbe 11th International Software Metries Symposium(METRICS 2005),Rome,Italy,2005. 被引量:1
  • 9邓聚龙.灰估算与灰决策[M].武汉:华中科技大学出版社,2002. 被引量:1
  • 10MacDonell S,Shepperd M.Using prior-phase effort records for reestimation during software projects[C] //The 9th International Software Metrics Symposium(METRICS 2003),Sydney,Australia,2003:73-86. 被引量:1

共引文献123

同被引文献12

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部