本文介绍了深圳市南山热电厂污泥干化供热改造的内容。通过对改造前后性能试验数据的对比,分析了污泥干化供热对联合循环机组运行的影响,并提出了运行中的改进方法。同时,本文还分析了污泥干化臭气系统对机组的影响以及相应的注意事项。
This paper introduces the improvement content of HRSG of PGglT1E gas-steam combined cycle for sludge drying heating system in Shenzhen Nanshan power plant. By comparing with the data of the performance test both before and after improvement, this paper analyzes the influence on operation of PG9171E gas-steam combined cycle unit by sludge drying heating system, and some opti- mization methods for unit' s operation was proposed. At the same time, this paper also analyzes the influence on unit by sludge drying odor system and the matters needing attention.
出处
《燃气轮机技术》
2013年第3期61-64,37,共5页
Gas Turbine Technology
关键词
余热锅炉
污泥干化供热
性能对比
HRSG
sludge drying heating system
performance comparison