摘要
1995年 3月 ,本刊曾发表过“对大型矿井分区开拓的认识及实践”一文 ,限于篇幅 ,作者仅对大型矿井分区开拓的服务范围作概略的叙述。时隔 5年 ,该文的作者对这一问题进行了深入讨论 ,提出 :低瓦斯矿井分区的服务范围在上、下山开采 ,瓦斯当量 <5时 ,为 7.4~ 1 2 .8km2 ;瓦斯当量 <1 0 >5时为 6 .5~ 6 .8km2 。这里用了较大篇幅 ,全文刊登这篇文章。
On the No.3 of 'CHINA COAL' 1995, an article under the title of 'Concept and Practice about Large-sized Coal Mine Development by District' was published. In that particular article, the author only dealt briefly with the service scopes of large-sized coal mine development by district. Five years after that, the same author presents a detailed discussion about the matter and proposes that in case of low gas mine when the scope of service is located around the up-hill and down-hill areas with gas density <5, the scope of service should be 7.4 - 12.8km2 and in case the gas density is <10 and >5,the scope of service should be 6.5 - 6.8km2
出处
《中国煤炭》
2000年第2期11-18,共8页
China Coal