摘要
就华能武汉阳逻电厂三期工程调试中,5、6号机组MCS系统中的缺陷和问题进行了分析、研究,提出了相应的处理方法。
The defects and problems in MCS system of the No. 5 and No. 6 supercritical units are analysed and studied during commissioning in the third phase project of Wuhan Huaneng Yangluo power plant,and the relevant disposal methods are put forward as well.
出处
《湖北电力》
2007年第2期49-50,共2页
Hubei Electric Power